ML20205T128

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Repts 50-277/86-11 & 50-278/86-11 on 860407-11.No Violations Noted.Steps Taken to Correct Violation & Deviation Noted in Insp Repts 50-277/83-32 & 50-277/84-22 Verified
ML20205T128
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 06/09/1986
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Daltroff S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20205T133 List:
References
NUDOCS 8606130060
Download: ML20205T128 (2)


See also: IR 05000277/1986011

Text

\\

o

o

JUN 091986

Docket Nos.

50-277

50-278

Philadelphia Electric Company

ATTN: Mr. S. L. Daltroff

Vice President

Electric Production

2301 Market Street

Philadelphia, Pennsylvania 19101

Gentlemen:

Subject:

Combined Inspection Report Nos. 50-277/86-11 and 50-278/86-11

This refers to the routine safety inspection conducted by Mr. M. Dev of this

office on April 7-11, 1986, at Peach Bottom Atomic Power Station, Units 2 and

3, t) elta, Pennsylvania, of activities authorized by NRC License Nos. DPR-44 and

DPR-56 and to the discussions of our findings held by Mr. Dev and Dr. P. K. Eapen

of this office with Mr. D. Smith of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the NRC Region I Inspec-

tion Report which is enclosed with this letter. Within these areas, the inspec-

tion consisted of selective examinations of procedures and representative re-

cords, interviews with personnel, and observations by the inspector.

Our inspector also verified the steps you have taken to correct a violation and

a deviation brought to your attention in letters dated February 9, 1984 and

October 12, 1984, respectively. We have no further questions regarding the

steps you took to correct these concerns (50-277/83-32-01 and 50-277/84-22-07).

Within the scope of this inspection, no violations were observed.

No reply to this letter is required. Your cooperation with us in this matter

is appreciated.

Sincerely,

Original Signed By:

p

Lee H. Bottenhausen

A tewart D. Ebneter, Director

l

Division of Reactor Safety

f g8 [

Enclosure: NRC Region I Inspection Report Numbers 50-277/86-11 and

50-278/86-11

y

e60613006o e60609

l

PDR

ADOCK 0500

7

,

l

G

I

0FFICIAL RECORD COPY

CIR PB 86-11 - 0001.0.0

06/03/86

.

.

-

_

_ _

.-.

.

--

, -

Philadelphia Electric Company

2

-

. cc w/ enc 1:

.

R. S.:Fleischmann, Manager, Peach Bottom Atomic Power Station

John S. Kemper, Vice President, Engineering and Research

Troy B. Conner, Jr., Esquire

W. H. Hirst, Director, Joint Generation Projects Department, Atlantic Electric

G. Leitch, Superintendent Nuclear Generation Division

Eugene J. Bradley, Esquire, Assistant General Counsel (Without Report)

Raymond L. Hovis, Esquire

Thomas Magette, Power Plant Siting, Nuclear Evaluations (Without Report)

W. M. Alden, Engineer in Charge, Licensing Section

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Pennsylvania

,

bec w/ enc 1:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o enc 1)

Section Chief, DRP

.

J

i

!

t

i

,

l

f

I

fj

)?

RI:DRS

RI:DRS

RI:DRS

DR

i

Dev/mjd

e

Bettenhausen

Eb

er

5/ 6 /86

5/ /86

d'jg/86

6

/

l

OFFICIAL RECORD COPY

CIR PB 86-11 - 0002.0.0

05/06/86

,

i

-- . .

.. .

.

- - . - - - . - . - .

-

.

- - - . _ - - - _ - - . _ - _ . _ _ , _ _ -

, - . . - - - . _ _ ,