JUN 091986
Docket Nos.
50-277
50-278
Philadelphia Electric Company
ATTN: Mr. S. L. Daltroff
Vice President
Electric Production
2301 Market Street
Philadelphia, Pennsylvania 19101
Gentlemen:
Subject:
Combined Inspection Report Nos. 50-277/86-11 and 50-278/86-11
This refers to the routine safety inspection conducted by Mr. M. Dev of this
office on April 7-11, 1986, at Peach Bottom Atomic Power Station, Units 2 and
3, t) elta, Pennsylvania, of activities authorized by NRC License Nos. DPR-44 and
DPR-56 and to the discussions of our findings held by Mr. Dev and Dr. P. K. Eapen
of this office with Mr. D. Smith of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the NRC Region I Inspec-
tion Report which is enclosed with this letter. Within these areas, the inspec-
tion consisted of selective examinations of procedures and representative re-
cords, interviews with personnel, and observations by the inspector.
Our inspector also verified the steps you have taken to correct a violation and
a deviation brought to your attention in letters dated February 9, 1984 and
October 12, 1984, respectively. We have no further questions regarding the
steps you took to correct these concerns (50-277/83-32-01 and 50-277/84-22-07).
Within the scope of this inspection, no violations were observed.
No reply to this letter is required. Your cooperation with us in this matter
is appreciated.
Sincerely,
Original Signed By:
p
Lee H. Bottenhausen
A tewart D. Ebneter, Director
l
Division of Reactor Safety
f g8 [
Enclosure: NRC Region I Inspection Report Numbers 50-277/86-11 and
50-278/86-11
y
e60613006o e60609
l
ADOCK 0500
7
,
l
G
I
0FFICIAL RECORD COPY
CIR PB 86-11 - 0001.0.0
06/03/86
.
.
-
_
_ _
.-.
.
--
, -
Philadelphia Electric Company
2
-
. cc w/ enc 1:
.
R. S.:Fleischmann, Manager, Peach Bottom Atomic Power Station
John S. Kemper, Vice President, Engineering and Research
Troy B. Conner, Jr., Esquire
W. H. Hirst, Director, Joint Generation Projects Department, Atlantic Electric
G. Leitch, Superintendent Nuclear Generation Division
Eugene J. Bradley, Esquire, Assistant General Counsel (Without Report)
Raymond L. Hovis, Esquire
Thomas Magette, Power Plant Siting, Nuclear Evaluations (Without Report)
W. M. Alden, Engineer in Charge, Licensing Section
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Pennsylvania
,
bec w/ enc 1:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o enc 1)
Section Chief, DRP
.
J
i
!
t
i
,
l
f
I
fj
)?
RI:DRS
RI:DRS
RI:DRS
- DR
i
Dev/mjd
e
Bettenhausen
Eb
er
5/ 6 /86
5/ /86
d'jg/86
6
/
l
OFFICIAL RECORD COPY
CIR PB 86-11 - 0002.0.0
05/06/86
,
i
-- . .
.. .
.
- - . - - - . - . - .
-
.
- - - . _ - - - _ - - . _ - _ . _ _ , _ _ -
, - . . - - - . _ _ ,