ML20205S484
| ML20205S484 | |
| Person / Time | |
|---|---|
| Site: | Oyster Creek |
| Issue date: | 03/27/1987 |
| From: | Fiedler P GENERAL PUBLIC UTILITIES CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20205S489 | List: |
| References | |
| NUDOCS 8704070041 | |
| Download: ML20205S484 (1) | |
Text
ENuclear
= e w "-
Route 9 South Forked River New Jersey 087310388 l
600 971 4000 Writer's Direct Dial Number:
March 27, 1987 US Nuclear Regulatory Commission l
Attention:
Document Control Desk l
Washington, DC 20555
Dear Sir:
l l
Subject:
Oyster Creek Nuclear Generating Station I
Docket No. 50-219 Reactor Containment Building Integrated Leak Rate Test Pursuant to 10CFR50, Appendix J, Section V.D. and Oyster Creek Technical Specifications 4.5.H and 6.9.3.b, enclosed is a summary technical report l
entitled, " Reactor Containment Building Integrated Leak Rate Test Oyster l
Creek, 1986".
The report contains the nothodology utilf red to perform the primary containment Type A test of twenty four hour duration and the four hour supplemental verification test conducted with satisfactory results on the dates of October 25-29, 1986.
Type B and C local leak rate test results are also presented.
In addition, the results of secondary containment capability testing are included in accordance with Technical Specification 4.5.J.4.
If you should have any questions please contact Mr. George Busch at (609)-971-4909.
Very truly yours.
PetFrX Fiedler Vice President and Ofrector Oyster Creek PDF:GB:at(0144A)
Enclosure cc:
Dr. Thomas E. !!urley, Administrator Region !
U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406 NRC Resident Inspector Oyster Crook Nuclear Generating Station Forked River, NJ 03731 0)f 0704070041 070327 PDH ADOCK 00000219 ik n
evH GPU Nudcat Cof poiata;n n a wtnubary of the General Potmc Ublite Corpotabon
-