ML20205S360

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Rept 50-456/87-11 on 870310-13.No Violations Noted
ML20205S360
Person / Time
Site: Braidwood Constellation icon.png
Issue date: 03/31/1987
From: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20205S365 List:
References
NUDOCS 8704070008
Download: ML20205S360 (2)


See also: IR 05000456/1987011

Text

.

--

_

. -.

.

.

MAR 311987

1

1

i

Docket No. 50-456

Commonwealth Edison Company

'

ATTN: Mr. Cordell Reed

i

Vice President

!

Post Office Box 767

Chicago, IL 60690

,

i

Gentlemen:

This refers to tha routine safety inspection conducted by Messrs. T. E. Vandel

and S. A. Reynolds of this office on March 10-13, 1987, of activities at

Braidwood Station, Unit 1, authorized by NRC Operating License No. NPF-59 and

to the discussion of our findings with Mr. E. E. Fitzpatrick and others of your

staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requireme'ts were identified during the course of this

inspection.

'

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy

of this letter and the enclosed inspection report will be placed in the

NRC Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

h.

870407000s 87o331

~

I

L

.

.

PDR

ADOCK 05000456

4

G

PDR

J.

H

ison, Ch ef

Engineering Branch

!

'

Enclosure:

Inspection Report

No.50-456/87011(DRS)

See Attached Distribution

,

.

.

RI

11

R I

RIII '

R

1

Q

y

f,

,

i 1

-

A

Va del /ims

R

opds

Ja

nski

-

le

H rpdn

!

[_yr['

p

lth

i

-

- -

-

-

.

.

\\

-

NS 311987

i

Commonwealth Edison Company

2

Distribution

l

cc w/ enclosure:

D. L. Farrar, Director

l

of Nuclear Licensing

l

M. Wallace, Project Manager

D. Shamblin, Construction

Superintendent

E. E. Fitzpatrick, Station

Superintendent

P. L. Barnes, Regulatory

l

Assurance Supervisor

l

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Braidwood

Resident Inspector, RIII Byron

D. W. Cassel, Jr. , Esq.

Richard Hubbard

J. W. McCaffrey, Chief, Public

Utilities Division

H. S. Taylor, Quality Assurance

l

l

Division

!

E. Chan, 0GC

J. Moore, 0GC

G. Berry, OGC

l

J. Stevens, NRR

The Honorable Herbert Grossman, ASLB

The Honorable A. Dixon Callihan, ASLB

The Honorable Richard F. Cole, ASLB

l

i

,

l

l

l

!

l

l

l

!

i

-

.

. .

.

-