ML20205R981
| ML20205R981 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 05/16/1986 |
| From: | Morgan H SOUTHERN CALIFORNIA EDISON CO. |
| To: | Martin J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| NUDOCS 8606060064 | |
| Download: ML20205R981 (2) | |
Text
w.
~.
Vc i
J';
=r " "~
15y,, _
El l'lll:,d Southem Califomia Edison Company d
SAN ONOFRE NUCLEAR GENEHATING STATION
- C/f P. O. BOK 128 SAN CLEMENTE. CAUFORNIA 92672 H.E. MORGAN TELEPHONE ST ATION MANAGFR (794)368-624I May 16, 1986 4
U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region V 1450 Maria Lane, Suite 210 Walnut Cnek, California 94596-5368 Attention:
Mr. J. B. Martin, Regional Administrator
Dear Sir:
Subject:
Docket No. 50-361 Special Report - Inservice Inspection of Steam Generator Tubes San Onofre Nuclear Generating Station, Unit 2
Reference:
Letter from Mr. M. O. Medford (SCE) to Mr. G. W. Knighton (Branch Chief, Licensing Branch No. 3 - USNRC) dated April 5,1985 - Steam Generator Status, with enclosure titled,
" Steam Generator Tubing Wear, San Onofre Unit 2," dated April 3, 1985.
Pursuant to Section 6.9.2 of Appendix A, Technical Specifications to Facility Operating License NPF-10, this report is being submitted as required by Surveillance Requirement 4.4.4.5(a) associated with Limiting Condition for Operation (LCO) 3.4.4.
This Surveillance Requirement requires that a Special Report be prepared and submitted to the Commission within 15 days following the completion of each inservice inspection of steam generator tubes.
During the current refueling outage, an inservice inspection of the full length of 6.35% (584) of the tubes in Steam Generator E-088 was completed on May 1, 1986.
No defective tubes were identified. A supplementary inspection was conducted in Steam Generator E-089 to monitor the. progress of the tubing wear addressed in the reference. No defective tubes were identified. A total of 5 tubes in Steam Generator E-088 and 12 tubes in Steam Generator E-089 were preventively plugged due to indications of tubing wear.
8606060064 e60516 k
DR ADOCK 00000361
\\0 t
PDR ZC-o/
46-a Mr. J. B. Martin May 16, 1986 As required by Surveillance Requirement 4.4.4.5(b), complete results of the recently completed inservice inspection will be submitted to the Commission by May 1, 1987.
If you require any additional information, please so advise.
Sincerely, Mb cc:
F. R. Huey (USNRC Senior Resident Inspector, Units 1, 2 and 3)
H. Rood (Project Manager, SONGS 2/3, USNRC, NRR)
U. S. Nuclear Regulatory Commission Document Control Desk Institute of Nuclear Power Operations (INPO) 4
%_._