ML20205R865
| ML20205R865 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 05/23/1986 |
| From: | Wenzinger E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Opeka J NORTHEAST NUCLEAR ENERGY CO. |
| Shared Package | |
| ML20205R869 | List: |
| References | |
| RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8606050507 | |
| Download: ML20205R865 (2) | |
See also: IR 05000423/1986015
Text
,
.
,.
.
.
MAY 2 31986
Docket / License: 50-423/NPF-49
Northeast Nuclear Energy Company
ATTN: Mr. John F. Opeka
Senior Vice President-Nuclear
Engineering and Operations Group
P.O. Box 270
Hartford, Connecticut 06101-0270
Gentlemen:
Subject: Millstone 3 Routine Inspection 50-423/86-15 (4/15/86-5/19/86)
This transmits the report of the above subject inspection by Messrs. J. Shedlosky
and F. Casella of this office.
The inspection findings have been discussed with
Messrs. W. Romberg and J. Crockett of your staff.
No violations were identified.
During this inspection, we noted that the operating staff reacted promptly and
effectively to several events.
These included an Electrical Hydraulic Control
System fluid leak, a secondary system steam gasket failure, and the loss of cir-
culating water pumps while at full power.
Thank you for your April 2 and 7,1986 letters replying to Violations identified
in Inspection Report 50-423/85-74.
Your letters addressed cause and corrective
action on failures to comply with the Facility Security Plan, failure to follow
operating procedures, and failure to maintain required cleanliness and material
control during safety-related equipment maintenance.
Corrective action completion
will be evaluated during routine inspection.
This also acknowledges your April 11, 1986 letter on positioning instrument stop
valves. We find no violation of NRC requirements in your program.
However, when
the opportunity arises incident to another meeting, I would like to discuss this
matter further with you.
Thank you for your cooperation.
Sincerely,
grW Signed 528
Edward C. Wenzinger, Chief
Projects Branch No. 3
Division of Reactor Projects
Enclosure:
NRC Region I Inspection Report 50-423/86-15
8606050507 860523
ADOCK 05000423
G
,
t .I
t
___
-
-
o
,
Northeast Nuclear Energy Company
2
.
g
cc w/ encl:
V. Papadopoli, Construction Quality Assurance Suoervisor
a
E. R. Foster, Director of Generation Construction
W. J. Mroczka, Vice President, Nuclear Operations
D. O. Nordquist, Manager of Quality Assurance
R. T. Laudenat, Manager, Generation Facilities Licensing
W. D. Romberg, Station Superintendent
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Senior Resident Inspector
State of Connecticut
bec w/ encl:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encl)
DRP Section Chief
L. Prividy, RI, BV-2
T. Rebelowski, SRI, Millstone 1&2
B. Doolittle, LPM, NRR
R. Keimig, DRSS
s
b
R
P
(
RI:DRP
RIgP
@ ,k
!
Shedlosky/meo
McCabe
We3 tin [pr
5/ /86
sit.t
6 f,qfG
0FFICIAL RECORD COPY
,
/
u
j