Forwards Application for Amend to License NPF-3.Amend Corrects Error in Section 3/4.3.2, Safety Sys Instrumentation & Spec 3.3.2.1,Table 3.3-3, Safety Feature Actuation Sys Instrumentation
ML20205R159
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 03/31/1987
From: Shelton D
TOLEDO EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20205R137 List:
References
1369, TAC-65028, NUDOCS 8704060243
Download: ML20205R159 (2)


Text

-

m TOLEoD

%smEDISON Docket No. 50-346 DONALD C. SHELTON License No. NPF-3

[ oms 7 Sorial No. 1369 M:rch 31, 1987 Unitsd States Nuclear Regulatory Commission Docum:nt Control Desk Washington, D. C.

20555 Gsnelcment Under separate cover, we are transmitting an application for an Amendment to Fccility Operating License No NPF-3 for the Davis-Besse Nuclear Power Station, Unit No. 1.

This cpplication requests that the Davis-Besse Nuclear Power Station, Unit No. 1 Operating License, Appendix A, Technical Specifications be rsvicsd on an emergency basis to reflect the attached changes.

Ths first proposed change is to correct an error in Section 3/4.3.2, Safety Syoten Instrumentation, Specification 3.3.2.1 Table 3.3-3, Safety Features Actuttion Systen (SFAS) Instrumentation. The proposed change to Table 3.3-3 would modify Functional Unit 4a, Sequencer, from 4 minimum units operable to 3 ninimum units operable.

In addition, Action Statement 9a to Table 3.3-3 would be modified to include, for Functional Unit 4a that the insparable sequencer channel be placed in the tripped condition by physical removal of the sequgncer module. As an aid in understanding this change, salicnt operational' features of the Davis-Besse SFAS/ Emergency Diesel Cansrator Sequencer are provided in Attachment 1 to this application.

On Hirch 30, 1987, while the plant was operating at full power, an Emergency Diccol Generator load aequencer was discovered to be inoperable during a routine surveillance test. The Limiting Condition for Operation in Spscification 3.3.2.1 did not allow for power operation with less than all lond cequencers operable. Without either the timely restoration of the asqusncer to operable status or the timely approval of this Technical Sp2cification change by the Nuclear Regulatory Commission, the Davis-Besse Nucicer Power Station Unit No. I reactor would have been required to shut dtwn from full power. Accordingly, because no significant hazards were involved (as discussed in the attached Significant Hazards Consideration),

Toledo Edison requested that the Nuclear Regulatory Commission issue this

- Technical Specification change on an emergency basis pursuant to 10CFR Part 50.91(a)(5). The aituation and request for regulatory relief was crolly communicated to the NRC soon after the situation arose on March 30, 1987.

8704060243 870$01 PDR ADOCK 05000346 P

PDR THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO. OHIO 43852

Dock:t No. 50-346 Lic nre No. NPF-3

' Sarisi No. 1369 Pcg2 2 4

Toledo Edison requests that this amendment be innnediately approved and issusd by the NRC.

A chsck for $150 as required by 10CFR170.12(c) for a license amendment cpplication is attached.

Very t yours.

W' DCS DRWidem Attachments ces DB-1 NRC Resident Inspector State of Ohio A. B. Davis, Acting Regional Administrator (2 copies)

A. W. DeAgazio, NRC/NRR Davis-Besse Project Manager

]