Forwards Insp Repts 50-327/88-42 & 50-328/88-42 on 880829-0902.No Violations or Deviations Noted
ML20205R026
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 10/31/1988
From: Mccoy F
NRC OFFICE OF SPECIAL PROJECTS
To: White S
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20205R030 List:
References
NUDOCS 8811090426
Download: ML20205R026 (2)


See also: IR 05000327/1988042

Text

, _ - _ _ _ _ _ - _ _ _ _ . _ _. _ _ _

..s .

.

4. .

1. . .

007 3 1 1939

' Docket Nos. 50-327, 50-328  :

License.Nos. DPR-77, DPR-79

fr.S.A. White

Senior Vice President, Nuclear Power

Tennessee Valley Authority

6N 38A Lookout Place

1101 Market Street

Chattanooga, TN 37402-2801

Dear Mr. White:

SUBJECT: NRC INSPECTION REPORT NOS. 50-327/88-42 AND 50-328/88-42

This refers to the special Nuclear Regulatory Commission (NRC) operational

. readiness inspection conducted by Ken Jenison on August 29 - September 2, 1988.

The inspection included a review of activities authorized for your Sequoyah'

facility. At the conclusion of the inspection, the findings were oiscussed

with those members of your staff identified in the enclosed inspection report.

The team concluded that sufficient progress had been made to justify the

startup of Unit 1 and two ur.it operation.

Areas examined during the inspection are identified in the' report. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

Within the scope of the inspection, no violations or deviations were

identified.

In accordance with Section 2'.790 of the NRC's "Rules of Practice," Part 2,

Title 10 Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

OP GMt.MGNCO OY

FPANK R. McC0Y

Frank R. McCoy, Assistant Director

for TVA Inspection Programs

TVA Projects Division

Office of Special Projects

Enclosure:

NRC Inspection Report

.cc: (See page )

NkNNbk

  • $7

I k

.250I

- , _ .

e-

,

. .- . . . .-

OCT 31 1983

S. A. White 2.

I.

cc w/ enc 1:

' Jt A. Kirkebo, Vice President,

. Nuclear Engineering

Ld. L. LaPoint, Acting Site Director

Sequoyah Nuclear Plant

J.L.Gridley, Director >

Nuclear Safety and Licensing

c4. Ray, Acting _ Site Licensing '

Manager

4 A Representative, Rockville Office

Jeneral Counsel, TVA

State of Tennessee

s r

c w/ enc 1:

G. Partlow, OSP

D. Richardson, OSP-

C. Black, OSP

D. Liaw, OSP

K. P. Barr, OSP/RII.

L. J. Watson, OSP/RII

J. B. Brady, OSP/RII

. Rutberg, OGC

RC Resident Inspector ,

NRC Document Control Desk  :

l

t

j

>

i

RI! RII

\bN WJt)

JBBrady:es LJW%t n