Forwards Insp Rept 50-482/88-33 on 881011-15.No Violations or Deviations Noted.Understanding from Exit Meeting That Commitment Made to Ensure That All Future Temporary Change Packages for Procedures Paginated Confirmed
ML20205Q996
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 11/01/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Withers B
WOLF CREEK NUCLEAR OPERATING CORP.
Shared Package
ML20205Q998 List:
References
NUDOCS 8811090420
Download: ML20205Q996 (2)


See also: IR 05000482/1988033

Text

-

i / e . gy-.irass

In Reply Refer To:

Docket: STN 50-482/88-33

Wolf Creek Nuclear Operating Corporation

ATTN: Bart D. Withers

President and Chief Executive Officer

P.O. Box 411

Burlington, Kansas 66839

Gentlemen:

This refers to the inspection conducted by Mr. R. V. Azua of this office during

the period October 11-15, 1988, of activities authorized by NRC Operating

License NPF-42 for Wolf Creek Generating Station, and to the discussion of our

findings with Mr. F. T. Rhodes and other members of your staff at the

conclusion of the inspection.

Areas examined during the inspection included the containment integrated leak

rate test (CILRT). Within this area, the inspection consisted of selective

examination of procedures and representative records, interviews with personnel,

dnd obseryctions by the NRC inspector. The inspection findings are documented

in the enclosed inspection report.

It is our understanding that during the exit interview a commitment was made to

ensure that all future temporary change packages for procedures are paginated.

This wn done to meet the intent of your Administrative Procedure No. ADM-07-100.

Should this not be your urderstanding, we will be pleased to diccuss it with

you. This comitment is further discussed in paragraphs 6 and 7 of Section 2.0

of the attached inspection report.

Within the scope of the inspection, no violations or deviations were

identified.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

original Signed Ib

p, }. Callan

L. J. Callan, Director

Division of Reactor Projects

Enclosure:

Appendix - NRC Inspection Report

50-482/88-33

cc w/ enclosure: (see next page)

b

  • RIV:RI *C:TPS *D:DRS D:DRP'tI

RVAzua/ld WCSiedle JLMilhoan LJCallan

/ /88 / /88 / /88 o/t/88

,

l

  • previously concurred /,d'

SS11090420 891101 \

PDR ADOCK 05000482 i

{

O PDC

_ _ _ _ _ _ _

, l ..

Wolf Creek Nuclear Operating -2-

cc w/ enclosure:

Wolf Creek Nuclear Operating Corporation '

ATTN: Otto Maynard, Manager

of Licensing

P.O. Bor 411

Burlington, Kansas 66839

Wolf Creek Nuclear Operating Corporation

ATTN: Gary Boycr, Plant Manager

P.O. Box 411

Burlington, Kansas 66839

Kansas Corporation Commission

ATTN: Robert D. Elliott, Chief Engineer

Fourth Floor, Docking State Office Building

Topeka, Kansas 66612-1571

Kansas Radiation Control Program Director

bec to DMB (IE01)

bec distrib. by RIV:

  • RRI *R. D. Martin, RA

"Section Chief (DRP/A) *DRP

  • RPB-DRSS B, DeFayette, RIII
  • RIV File SRI, Callaway, RI!!
  • MIS System *RSTS Operator
  • Project Engineer DRP/A Lisa Shea, RM/ALF
  • D. Pickett, NRR Project Manager
  • DRS *R. V. Azua
  • W. C. Seidic
  • w/766

t

,

I

t

t

,

l

_ , _ _ _ . _ _ _ . _ . _ __ _ , _ . . _ . . _ . _