ML20205Q996
| ML20205Q996 | |
| Person / Time | |
|---|---|
| Site: | Wolf Creek |
| Issue date: | 11/01/1988 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Withers B WOLF CREEK NUCLEAR OPERATING CORP. |
| Shared Package | |
| ML20205Q998 | List: |
| References | |
| NUDOCS 8811090420 | |
| Download: ML20205Q996 (2) | |
See also: IR 05000482/1988033
Text
gy-.irass
i /
-
e
.
In Reply Refer To:
Docket:
STN 50-482/88-33
Wolf Creek Nuclear Operating Corporation
ATTN:
Bart D. Withers
President and Chief Executive Officer
P.O. Box 411
Burlington, Kansas 66839
Gentlemen:
This refers to the inspection conducted by Mr. R. V. Azua of this office during
the period October 11-15, 1988, of activities authorized by NRC Operating
License NPF-42 for Wolf Creek Generating Station, and to the discussion of our
findings with Mr. F. T. Rhodes and other members of your staff at the
conclusion of the inspection.
Areas examined during the inspection included the containment integrated leak
rate test (CILRT). Within this area, the inspection consisted of selective
examination of procedures and representative records, interviews with personnel,
dnd obseryctions by the NRC inspector.
The inspection findings are documented
in the enclosed inspection report.
It is our understanding that during the exit interview a commitment was made to
ensure that all future temporary change packages for procedures are paginated.
This wn done to meet the intent of your Administrative Procedure No. ADM-07-100.
Should this not be your urderstanding, we will be pleased to diccuss it with
you. This comitment is further discussed in paragraphs 6 and 7 of Section 2.0
of the attached inspection report.
Within the scope of the inspection, no violations or deviations were
identified.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
original Signed Ib
p, }. Callan
L. J. Callan, Director
Division of Reactor Projects
Enclosure:
Appendix - NRC Inspection Report
50-482/88-33
cc w/ enclosure:
(see next page) b
D:DRP'tI
- RIV:RI
- C:TPS
- D:DRS
RVAzua/ld WCSiedle JLMilhoan LJCallan
/ /88
/ /88
/ /88
o/t/88
l
- previously concurred
/,d'
,
SS11090420 891101
\\
ADOCK 05000482
i
{
O
_ _ _ _ _ _ _
l
..
,
Wolf Creek Nuclear Operating
-2-
cc w/ enclosure:
Wolf Creek Nuclear Operating Corporation
'
ATTN: Otto Maynard, Manager
of Licensing
P.O. Bor 411
Burlington, Kansas 66839
Wolf Creek Nuclear Operating Corporation
ATTN: Gary Boycr, Plant Manager
P.O. Box 411
Burlington, Kansas 66839
Kansas Corporation Commission
ATTN:
Robert D. Elliott, Chief Engineer
Fourth Floor, Docking State Office Building
Topeka, Kansas 66612-1571
Kansas Radiation Control Program Director
bec to DMB (IE01)
bec distrib. by RIV:
- RRI
- R. D. Martin, RA
"Section Chief (DRP/A)
- DRP
- RPB-DRSS
B, DeFayette, RIII
- RIV File
SRI, Callaway, RI!!
- MIS System
- RSTS Operator
- Project Engineer DRP/A
Lisa Shea, RM/ALF
- D. Pickett, NRR Project Manager
- DRS
- R. V. Azua
- W. C. Seidic
- w/766
t
,
I
t
t
,
l
_ , _ _ _ . _ _ _ . _ . _
__
_ , _ . .
_
. . _ . _