Amend 221 to License DPR-66,modifying License Condition 2.C (9) to Allow One Time Extension of SG Insp Interval in TS Surveillance 4.4.5.3.b
ML20205Q937
Person / Time
Site: Beaver Valley
Issue date: 04/16/1999
From: Bajwa S
NRC (Affiliation Not Assigned)
To:
Shared Package
ML20205Q942 List:
References
NUDOCS 9904220129
Download: ML20205Q937 (4)


Text

'

g"(h bft UNITED STATES y i' 7

S NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 2055fHX)01 5

DUQUESNE LIGHT COMPANY OHIO EDISON COMPANY PENNSYLVANIA POWER COMPANY DOCKET NO. 50-334 BEAVER VALLEY POWER STATION. UNIT NO.1 AMENDMENT TO FACILITY OPERATING LICENSE l

Amendment No. 271 License No. DPR-66 j

1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Duquesne Light Company, et al. (the licensee) dated November 11,1998, as supplemented February 26,1999, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I;

B.

The facility will operate in conformity with the applicatior,, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that th6 activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

9904220129 990416 PDR ADOCK 05000334 p

PM

e

. 2.

Accordingly, page 6 of Facility Operating License No. DPR-S6 is hereby amended by the addition of License Condition 2.C(9) to state:*

(9) Steam Generator Surveillance interval Extension The performance interval for the steam generator surveillance requirement identified in the licensee's request for surveillance interval extension dated November 11,1998, shall be extended to coincide with the cycle 13 refueling outage or the end of 500 effective full power days, whichever is sooner. This surveillance will not extend beyond June 15,2000.

3.

This license amendment is effective as of its date of issuance, to be implemented within 60 days.

FOR THE NUCLEAR REGULATORY COMMISSION

,/

S. Singh Bajwa, Chief, Section 1 Project Directorate l Division of Licensing Project Management Office of Nuclear Reactor Regulation

Attachment:

Page 6 of Facility Operating License No DPR-66*

Date of Issuance: April 16, 1999

  • Page 6 is attached, for convenience, for the composite license to reflect this change.

1

i 4

ATTACHMENT TO LICENSE AMENDMENT NO. ?P1 FACILITY OPERATING LICENSE NO. DPR-66 DOCKET NO. 50-334 l

Revise License as follows:

Remove Paae Insert Paae 6

6 e

l I

l l

l

f.

4 DPR-66 (G)

Systems Intearity Duquesne Light Company shall implement a program to reduce' leakage from systems outside containment that would or could contain highly radioactive fluids during a serious transient or accident to as low as practical levels.

This program shall include the following:

1.

Provisions establishing preventive maintenance and l

periodic visual inspection requirements, and 2.

Integrated leak test requirements for each system at a frequency not to exceed refueling cycle intervals.

j l

l (7)

Iodine Monitorina l

Duquesne Light company shall implement a program which will ensure the capability to accurately determine the airborne iodine concentration in vital areas under accident conditions.

This program shall include the l

following:

l l

1.

Training of personnel, l

2.

Procedures for monitoring, and l

3.

Provisions for maintenance of sampling and i

analysis equipment.

(8)

Backun Method for Determinina Subcoolina Marain Duquesne Light Company shall implement a program which will ensure the capability to accurately monitor the.

Reactor Coolant System subcooling margin.

This program l

shall include the following:

1.

Training of personnel, and 2.

Procedures for monitoring.

l (9)

Steam Generator Surveillance Interval Extension The performance interval for the steam generator surveillance requirement identified in the licensee's request' for surveillance interval extension dated November 11, 1998, shall be extended to coincide with the cycle 13 refueling outage or the end of 500 effective full power days, whichever is sooner.

This surveillance will not extend beyond June 15, 2000.

Amendment No. Z?1