Forwards 15-day Special Rept Re Fourth RO (2RFO4) SG ISI Tube Plugging,Per TSs 4.0.6.5a & 6.9.2
ML20205Q341
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 04/15/1999
From: Terry C, Walker R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Merschoff E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
TXX-99094, NUDOCS 9904210175
Download: ML20205Q341 (2)


Text

4 WMulilun P7 Log # TXX-99094

.=

File # 10010.1

.r C

916 Ref. # 10CFR50.55a 7UELECTRIC April 15,1999

c. w w 5enior Mce President

& PrincipalNuclear Oplcer Mr. E. W. Merschoff, Regional Administrator U. S. Nuclear Regulatory Commission, Region IV 611 Ryan Plaza Drive. Suite 400 Arlington, TX 76011

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)- UNIT 2 DOCKET NO. 50-446 UNIT 2, FOURTH REFUELING OUTAGE (2RFO4)

STEAM GENERATOR INSERVICE INSPECTION TUBE PLUGGING SPECIAL REPORT NO. 2-SR-99-001-00 Attached is a 15 day special report submitted pursuant to CPSES Unit 2 Technical Specifications 4.0.6.5a and 6.9.2. If there are any questions, please contact Obaid Bhatty at (254) 897-5839 or Steve Swilley at (254) 897-6069.

This communication contains no new licensing basis commitments regarding If CPSES Units 1 and 2.

Sincerely,

$,h.

J C. L. Terry

/O By RogerD. Walker Regulatory Affairs Manager OB/ob

. Attachment cc:

NRC Document Control Desk Mr. J. l. Tapia, Region IV Mr. D. Jaffe, NRR Mr. G. Bynog, TOLR Resident inspectors 9904210175 990415 PDR ADOCK 05000446 G

PDR 0

Uv0 cousscut etix siesu torc 1Ric srsrios P.O. Box 1002 Glen Rose. Texas 76043 1002

f; Attachgent to TXX-99094 Pige 1 of 1 TU ELECTRIC COMANCHE PEAK STEAM ELECTRIC STATION - UNIT 2 SPECIAL REPORT NO.1-SR-99-001-00 UNIT 2, FOURTH REFUELING OUTAGE STEAM GENERATOR INSERVICE INSPECTION TUBE PLUGGING This letter provides the inservice inspection (ISI) Special Report on the steam generator tube ISI for Comanche Peak Steam Electric Station's fourth refueling outage (2RF04) on Unit 2. This report is being provided to you pursuant to CPSES Technical Specifications 4.0.6.5a and 6.9.2.

I Steam Generators 1,2,3 and 4 were inspected during 2RF04. The examinations were complete on April 9,1999. The number of tubes plugged during this outage in each steam generator is as follows:

CPSES Unit 2 Steam Generator No.1: One (1)

CPSES Unit 2 Steam Generator No. 2: Zero (0)

CPSES Unit 2 Steam Generator No. 3: Zero (0)

CPSES Unit 2 Steam Generator No. 4: Four (4)

Additional details on the plugged tubes and inspection effort will be provided in the 12-month report pursuant to CPSES Technical Specification 4.0.6.5.b.

i