Forwards Insp Repts 50-348/87-05 & 50-364/87-05 on 870211-0310.No Violations or Deviations Noted
ML20205Q280
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 03/20/1987
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML20205Q284 List:
References
NUDOCS 8704030483
Download: ML20205Q280 (2)


See also: IR 05000348/1987005

Text

._

g.

^ -

g

MAR 201987

Docket Nos. 50-348, 50-364

License Nos. NPF-2 and NPF-8

A ama Power Company

TN: Mr. R. P. Mcdonald

Senior Vice President

P. O. Box 2641

Birmingham, AL 35291-0400

Gentlemen:

SUBJECT: NRC INSPECTION REPORT NOS. 50-348/87-05 AND 50-364/87-05

'

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

W. H. Bradford on February 11 - March 10, 1987. The inspection included a

review of activities authorized for your Farley facility. At the conclusion of

the inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection repot t.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

Within the scope of the inspection, no violations or deviations were

identified.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

onlGINAL stGHID W

DAVID M. WU

b

G

!D 5 0 348

PDR

David M. Verrelli, Chief

Reactor Projects Branch 1

j

1

Division of Reactor Projects

I

Enclosure:

NRC Inspection Report l

cc: (See page 2)

i

1

1

I

l 1

ZC ol

o-. E

,

Alabama Power Company 2

/c'w/ enc 1:

/ y. O. Whitt, Executive Vice President

VJ. D. Woodard, General Manager -

/NuclearPlant

A.G.Hairston,III,GeneralManager-

j Nuclear Support

VJ. W. McGowan, Manager-Safety Audit

/andEngineeringReview

J. K. Osterholtz, Supervisor-Safety

Audit and Engineering Review

cc w/ enc 1:

N)CResidentInspector

vt. Reeves, Project Manager, NRR

Document Control Desk

State of Alabama

1

R RII

LPModenos:cc HQance:cc

3/lf/87 3/ 87

ns tJV

_