Forwards MORs for Mar 1999 for Songs,Units 2 & 3.There Were No Challenges to Pressurizer Safety Valves for Either Unit 2 or 3
ML20205Q092
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 04/15/1999
From: Scherer A
SOUTHERN CALIFORNIA EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20205Q094 List:
References
NUDOCS 9904210097
Download: ML20205Q092 (2)


Text

-

'h 50U1Hf RN CAlliORNIA A. I:dward Scherer i B EDISON ML.  !

An f.Dl50N lA71R%47/OML"" Gnnpany April 15,1999 I l

l U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555

Subject:

Docket Nos. 50-361 and 50-362 Monthly Operating Reports for March 1999 San Onofre Nuclear Generating Station, Units 2 and 3 l Gentlemen:

Technical Specification 5.7.1.4 of Facility Operating Licenses NPF-10 and NPF-15 for the San Onofre Nuclear Generating Station, Units 2 and 3, respectively, requires Southem California Edison to provide a Monthly Operating Report (MOR) of operating statistics and shutdown experience, including documentation of all challenges to pressurizer safety valves, for each unit. Attachments 1 and 2 provide the subject Monthly Operating Reports for Units 2 and 3, respectively. There were no challenges to pressurizer safety valves for either Unit 2 or 3.

If you have any questions, please contact Mr. Clay E. Williams at (949) 368-6707.

Sincerely, 1

l Attachments I & 2

/

ll cc: E. W. Merschoff, Regional Administrator, NRC Region IV _b;L9 L. Raghaven, NRC Project Manager, San Onofre Units 2 & 3 .

J. A. Sloan, NRC Senior Resident inspector, San Onofre Unit 2 & 3 -

~

9904210097 990415 PDR ADOCK 05000361 R PDR P. O.lkn 128 San Clemente. CA 92674 0128 949-368-7501 Fax 949-368-7575

Attachment 1 NRC Monthly Operating Report, March 1999 San Onofre Nuclear Generating Station, Unit 2 1

l l