Text
-
'h 50U1Hf RN CAlliORNIA A. I:dward Scherer i
B EDISON ML.
An f.Dl50N lA71R%47/OML"" Gnnpany April 15,1999 l
U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555
Subject:
Docket Nos. 50-361 and 50-362 Monthly Operating Reports for March 1999 San Onofre Nuclear Generating Station, Units 2 and 3 Gentlemen:
Technical Specification 5.7.1.4 of Facility Operating Licenses NPF-10 and NPF-15 for the San Onofre Nuclear Generating Station, Units 2 and 3, respectively, requires Southem California Edison to provide a Monthly Operating Report (MOR) of operating statistics and shutdown experience, including documentation of all challenges to pressurizer safety valves, for each unit. Attachments 1 and 2 provide the subject Monthly Operating Reports for Units 2 and 3, respectively. There were no challenges to pressurizer safety valves for either Unit 2 or 3.
If you have any questions, please contact Mr. Clay E. Williams at (949) 368-6707.
Sincerely,
/
Attachments I & 2 l
cc:
E. W. Merschoff, Regional Administrator, NRC Region IV
_b;L9 L. Raghaven, NRC Project Manager, San Onofre Units 2 & 3 J. A. Sloan, NRC Senior Resident inspector, San Onofre Unit 2 & 3 9904210097 990415
~
PDR ADOCK 05000361 R
PDR P. O.lkn 128 San Clemente. CA 92674 0128 949-368-7501 Fax 949-368-7575
NRC Monthly Operating Report, March 1999 San Onofre Nuclear Generating Station, Unit 2 1