Forwards Questions & Comments Based on Initial Review of Module 13A Re Foundation Matls & Backfill Submitted on 860109.Response Requested by 860516
ML20205P665
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 05/07/1986
From: Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Foster D
GEORGIA POWER CO.
References
NUDOCS 8605210512
Download: ML20205P665 (5)


Text

.

(T+icat M le MAY 0 7 Hl86 GeorgiafowerCompany ATTN / Mr. D. O. Foster 4

Vice President and General Manager Route 2 Box 299A Waynesboro, GA 30830 j

Dear Mr. Foster:

SUBJECT:

V0GTLE READINESS REVIEW - INTERIM REVIEW QUESTIONS - MODULE N0. 13A, "F0UNDATIONS MATERIALS AND BACKFILL" We have completed our initial review of Module 13A, which you submitted to us on January 9,1986, for evaluation.

As a result of the review, the enclosure lists 4

i questions and comments which need clarification and a written response.

Please review these comments and questions and provide a written response. Your input is requested to be received on or before May 16, 1986, i

Your assistance in responding to this request for additional information is appreciated.

Sincerely, ORIGINAL SIGNED BY VIRGIL L. BROWNLEE for Luis A. Reyes, Acting Director Division of Reactor Projects r

J

Enclosure:

Vogtle Readiness Review Program -

Module No. 13A, Questions and Comments cp w/ encl:

vR. J. Kelley, Executive Vice President I E. Conway, Senior Vice President &

Project Director j,

d D. Rice, Vice President, Project Engineering I H. Pinson, Vice President, Project

]

Construction (cc w/ encl: Con't page 2) i a

kDj 2 g K 05000424 2 860507 1

A PDR

\\

\\.\\

Y 0l 1

3 3

NAY 0 71986 s-

~

Georgia Power Company 2

j<:c w/ encl: Cont'd)'

VJ. T. Beckham, Vice President &

General Manager - Operations jR.A. Thomas,VicePresident, Licensing yd.W. Hayes,VogtleQuality Assurance Manager J. C. Ramsey, Manager -

Readiness Review

/G.B.Bockhold,GeneralManager, I.NuclearOperations Gucwa, Manager, Nuclear Safety and Licensing sdi.H.Googe, Project Construction Manager

/E.D.Groo'ver, Quality Assurance Site Manager -

/ Construction VJ. A. Bailey, Project Licensing I. Manager F. Trowbridge, Esq., Shaw, j Pittman, Potts and Trowbridge

/B. W. Churchill, Esq., Shaw, Pittman, Potts and Trowbridge

. L. Blake, Jr., Esq., Shaw, Pittman, Potts and Trowbridge d E. Joiner, Troutman, Sanders, vf.LockermanandAshmore G. Ledbetter, Commissioner, vd.DepartmentofHumanResources H. Badger, Office of Planning and Budget d Kirkland, III, Counsel, Office of the Consumer's Utility Council vD. C. Teper, Georgians Against

/. Nuclear Energy M

B. Margulies, Esq., Chairman, Atomic Safety and Licensing Board v6r.anel P

O. H. Paris, Administrative Judge Atomic Safety and Licensing Board

/. Panel G

A. Linenberger, Jr., Administrative Judge Atomic Safety and Licensing Board

/ Panel (B. P. Garde, Citizens Clinic, Director Government Accountability Project

.. = _

u

.' S 0 7 1966.

Georgia Power Company 3

cc w/ encl:

. Reis, ELD 4

. M. Hill, IE

p. Miller,NRR'

.. Brach, EDO

. Sinkule, RII

. Christnot, RII i

RC Resident Inspector ocument Control Desk State of Georgia 3

1 i

i i

i I

I 4

1 j

I t

i i

j I

RII RII RI i

EChristnot:dm MSinkule VLTrownlee l

5/$/86 5/f/86 5/ '/86 5

i i

i i

,w-,,

e-.e--,

e e--

- - - -,-. -,..ceme,*-sy-e-w,-w--

p r c wi

<=cww e+rwwwnyt-n* m.

m 1

l J

i.

ENCLOSURE l

V0GTLE READINESS REVIEW PROGRAM - MODULE NO. 13A I

i QUESTIONS AND COMMENTS NRR has completed an initial review of Module No.13A, Foundation Materials and Backfill, which was presented to the NRC on January 9, 1986.

As a result of the initial review, two branched of the Office of Nuclear Reactor Regulation have generated questions and comments which need clarification and a written j

response from Georgia Power Company.

These questions and comments are as follows:

Engineering Branch i

1

~

The following commitments have been determined to be consistent with the FSAR, SER, and SRP.

j Hydrology issues:

705, 759, 768, 769, 775, and 923 Seismology issues:

771, 772, 1885, and 781 Geology issues:

1919, 1920, and 1921 i

We find these commitments satisfactory.

However, there is one item in the SER that is not included in these commitments.

Confirmatory item (4) in the SER refers to SER Section 2.4.11 which requires that the applicant perform a test to establish the seepage losses for mechanical draft cooling tower basins.

This requirement should be included in the commitment matrix 4

even if the seepage test was performed and carried out satisfactorily with the results below the accepted leak rate limits.

Engineering Issues Branch With the exception of reference numbers 774,1895, and 1941, all of the geotechnical engineering commitments have been determined to be consistent i

with the FSAR, SER, and the SRP.

The three exceptions are listed below as needing corrections.

s 1.) Reference 774 indicates backfill should have less than 25 percent fines, but backfill actually placed has less than 12 percent fines.

2.) Reference 1895 does not include acceptable lift thickness, type of equipment used for compacting the fill, and the number of passes.

3.) Reference 1941 indicated an undrained shear strength for the marl as 10 KSF but sometimes 4 KSF (Reference 1980)is used, i

Other sections of the Module were reviewed for relating engineering topics. The following comments and suggestions are keyed sequentially to the indicated pages and sections of the Module 13A document, i

T i

--- - -. m. -,

..~.,,,--,._,,---,-,.~m.-.,,,,,,__

,, -, -,,,,,, _,,,..., - -,,.., ~,, - - -, - - -, - -.. -, - - -

2 Executive Summary

- Page v, paragraph 4:

We note that a resume for the technical consultant is missing form section 8.6 of the module.

Page vii, paragraph 3:

Georgia Power is expected to report the results of their settlement studies at least three months before fuel is loaded.

Section 4.0, Program Description Page 4.1-1, paragraph 2:

Site investigations were conducted in 1974-1977, but' Reg. Guide 1.132 was issued in 1979.

Page 4.1-7, section 4.1.2.2: The word " educator" should read " eductor.

Page 4.1.2.12:

Last sentence should read "The backfill has been densely compacted in accordance with revisions to earlier licensing commitments and engineering design requirements".

Page 4.1-15: Note that ANSI /ANI 2.11 is not an accepted licensing standard.

Page 4.4-4, section 4.4.6:

Proof-rolling of the marl surface before placement of backfill is not mentioned.

We believe such rolling was accomplished to identify soft spots to be overexcavated and filled.

Section 5.0, Audits and Special Investigations Page 5.2-4; Tit last two paragraphs _on this page should be deleted because they do not relate to ~odule section 5.0 topics.

The subject matter of these two

,a igraphs is contained in module section 3.4 (References 1887 and 1903).

Section 6.0, Program Verification Page 6.1-15, section 6.1.5.3 This section should be revised of omitted because it does not relate to topic 6.1.

Section 7.0 Independent Design Review Page 7D-2; Mr. L. West should be listed as ----- Geologist (Bechtel).

Section 8.0, Program Assessment / Conclusions Page 8.6-4; Mr. Wright's present affiliation (employer) is not given.

Comment: The Independent Design Review effort in Section 7.0 is excellent and clearly the most productive part of this module.