_.
,
MAR 2 61987.
i
.
MEMORANDUM FOR: Docket File, LACBWR 50-409
THRU: William Snell, Chief, Emergency Preparedness Section
FROM: James E. Foster, Senior Emergency Preparedness Analyst
SUBJECT: MEETING AT DAIRYLAND POWER COOPEPATIVE ON MARCH 4, 1987
On March 4,1987, Wayne Shafer, William Snell and I ret with representatives of
DairylaM Pcwer Cooperative at their headquarters in Lacrosse, Wisconsin, to
discuss corrective ections for the problems observed in their last en.ergency
preparedness exercise. A list of the attendees is enclosed. Prior to the
meeting, we visited the plant site, talked to the Resident Inspector, toured
the plant, and held informal discussions with the licensee Emergency
Preparedness Coordinator and Plant Manager.
Licensee personnel provided a listing of items developed from a review of the
most recent emergency exercise report (50-409/86011(DRSS)). This listing
(enclosed) included not only those problems characterized as Open Items, but
any item where irprovement was needed. Corrective actions for these items were
discussed.
Licensee personnel were aware that a number of the problems were viewed not
from the standpoint of their relative significance, but from the standpoint
that they represented problems which had gone lere uncorrected. They were also
2
aware that two areas, that of comunication, and training in the area of Health
,
Physics, were the primary areas of concern.
4
Corrective actions in the area of comunications included the ac'dition of an ;
'
"open line" which will provide three-way communications between the states of '
Wisconsin and Minnesota, and the Emergency Operations Facility. ;
Corrective actions in the area of Health Physics included a new Health Physics
training program, reportedly in place.
'l
4
8704030322 870326
PDR /
F ADOCK 05000409 '? '
PDR _ // 1
1 I
l
i
l
____ __. _ _ . _ _ . -- _ --. , _ - - --
. -- -- - -J
-
.
W. D. Shafer -?-
MAR 2 61987
It appeared from the presentation that the licensee is focusing attention to
the areas in r.eed of correction / enhancement, and that progress is adequate. We
will continue to monitor the licensee's progress through normal and eurmented
inspection effort.
James E. Foster
Senior Emergency Preparendess Analyst
Enclosures: As stated
"
cc w/ enclosures:
J. A. Hind
W. Snell
.
d
4
RIII, g RIII
(lW LCGS
Snell
Foster /as
03/24/87 3/37/37
$ /"
_ . - -
- .
-- . -_ -
. -
.- . -
- . _. . . --
..
ENCLOSURE 1
ATTENDEES
t'uclear Pegulatory Comission
William Snell
I. Villava
James Foster
W. Shafer
Dairyland Power Cooperative
Dan Weiss
John Parkyn
J. W. Taylor
Lynne Goodrnan
Rich Cota
Larry L. Nelson
P. W. Shafer
Scb Cherry
Pager Christians
I
i
.
i
i
__.
_. . . . _ _ . _ -
- -
.
- . .
, . ,
_
'
.'
~
' -
- -
-
ENCLOSURE-2
. 4
- .
,- .
4 -
,
EMERGENCY PREPAREDNESS PROGRESS' REPORT )
a
_
~; .. ' '- _
l
_
ltem from Inspection
Report No. 50-409/860ll(DRSS) Status
1. Extremity monitoring. EPP-6 has been revised and now requires
extremity monitoring for BOTH hands.
2. Failure at site area Projecting offsite dose-rates before
emergency to project what containment failure will be included-
offsite dose rates would in the next TSC training session.
be if containment failed.
3. NRC notification was late at EPP-2 is being revised to include the
site area emergency. the words, "This notification must be
completed as soon as possible after
state and local notifications and not
later.than 30 minutes after declaration
of EAL."
4. Better status boards Two new status boards have been
i
should be considered for fabricated and the computer printouts
the TSC/OSC. will be posted as they are produced.
5. Survey results were not New and better maps have been added to
recorded on survey maps. EPP-7 and a new status board map of the
site has been added in the TSC.
Training will emphasize logging the
survey results on these maps. The RAD
will remind surveyors before they leave-
the TSC to log readings.
6. Shielded transport cask A locking device has been installed-
came open in transit to that will prevent a reoccurrence of this
the laboratory. problem.
7. High rad areas should be The RAD will post and control.those
posted and controlled as high' rad areas that are needed to be
soon as practicable. posted.
8. Key to emergency kit was EPP-8 has been revised and now
forgotten. includes, obtaining the key to the
emergency kit storage area before
leaving the TSC.
9. Tweezer missing from the A tweezer has been added to the kit and
offsite kit. its inventory list.
l
10. Use of "THIS IS A DRILL" A meno has been issued to all potential
wasn't always used on the radio talkers reminding them of proper -
radio. exercise techniques. Also, future
training will emphasize proper radio
techniques.
pc2-3.4 1
1
- -
.
- -
- - -
.
., _
.
.. .
. .
, ~
_
.
.
_-
.-
Item from Inspection
8
Report No. 50-409/86011 (DRSS) Status -
. _
~
~
-
11. .. IIP inadequacies in offiste A completely new IIP training- program
performance. ~
has been generated and is in place that
-
includes offsite performance.
,
12. Status boards were A new larger EPZ map is being produced
'
inadequate in EOF. on which survey results and plume
tracking information can be written.
Information on plant status will be
available on computer which will also
provide hard copy information. The
necessity for other status boards will
be reviewed.
13. NRC notification information The LACBWR status sheet, jointly
may be inadequate. developed by DPC and NRC, has been
posted at each red phone and will be
used to provide necessary information.
If an open line is necessary, extra
personnel will be called in to man the
phone.
14. Enhance training of JPIC The JPIC technical representatives have
personnel to better cope been briefed on this subject and have
with providing technical been' informed that they. should take
information to media, part in the discussions and correct any
false information.
15. Communications problems A meeting was held on January 27 with
with the states. the states of Wisconsin and Minnesota
and an NRC representative. From this
meeting and follow-up discussions with
those present, several proposals to
enhance communications have been
suggested. Those improvements which
will definitely be enacted include j
maintaining an open line between the
states of Minnesota and Wisconsin and U
the EOF and decreasing the number of
calls to be made at Site Area Emergency
and General Emergency. Other
suggestions for improving
communications are being reviewed by
both states. A new telephone with new
number is being added to EOF to be used '
for the three way open line.
16. Evacuation time estimate EPP-2 is currently under revision and
information wasn't the evacuation time estimate table
included in EPP-2. from the Emergency Plan is being
included.
17. Investigate methods of In progress.
getting hard copy of
press releases to ECD.
pc2-3.4 2
'
.
. _- -
-
.
-
. . .
- .'* _
,
,
.
. 'o .
-
_
_
_- . - - -
-
,
_-
.
. -
Miscelaneous Items from DPC
, observations, Past Inspections, etc. - Status- -
1. ECD Should be encouraged to- This;will be e'mphasized'in_ future .
-
call in extra people for training sessions.at TSC and EOF. ,
communications duties, etc.
2. Copy machine outside EOF A sign has been fabricated that will
should be dedicated to be placed at the machine during an
exercise / emergency. exercise / emergency to notify personnel
of this.
3. Metric unit on computer The computer program is being revised
caused some confusion. to output the information in miles.
- 4. Evacuees were sent to G-1 when In upcoming training, the wind
the wind was from the South direction and how it affects
(evacuated into the potential evacuation will be emphasized.
plume).
5. Valve lineup wasn't The procedure for obtaining a
necessary for PASS sample. containment building PASS sample has
PASS sample, therefore, was been changed to eliminate any
unnecessarily slow. confusion on prerequisite.