Summary of 870304 Meeting W/Util in Lacrosse,Wi to Discuss Corrective Actions for Problems Observed in Last Emergency Preparedness Exercise.Util Listing of Items Developed from Review of Emergency Exercise Rept 50-409/86-11 Encl
ML20205P609
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 03/26/1987
From: Foster J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Snell W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 8704030322
Download: ML20205P609 (7)


See also: IR 05000409/1986011

Text

_.

,

MAR 2 61987.

i

.

MEMORANDUM FOR: Docket File, LACBWR 50-409

THRU: William Snell, Chief, Emergency Preparedness Section

FROM: James E. Foster, Senior Emergency Preparedness Analyst

SUBJECT: MEETING AT DAIRYLAND POWER COOPEPATIVE ON MARCH 4, 1987

On March 4,1987, Wayne Shafer, William Snell and I ret with representatives of

DairylaM Pcwer Cooperative at their headquarters in Lacrosse, Wisconsin, to

discuss corrective ections for the problems observed in their last en.ergency

preparedness exercise. A list of the attendees is enclosed. Prior to the

meeting, we visited the plant site, talked to the Resident Inspector, toured

the plant, and held informal discussions with the licensee Emergency

Preparedness Coordinator and Plant Manager.

Licensee personnel provided a listing of items developed from a review of the

most recent emergency exercise report (50-409/86011(DRSS)). This listing

(enclosed) included not only those problems characterized as Open Items, but

any item where irprovement was needed. Corrective actions for these items were

discussed.

Licensee personnel were aware that a number of the problems were viewed not

from the standpoint of their relative significance, but from the standpoint

that they represented problems which had gone lere uncorrected. They were also

2

aware that two areas, that of comunication, and training in the area of Health

,

Physics, were the primary areas of concern.

4

Corrective actions in the area of comunications included the ac'dition of an  ;

'

"open line" which will provide three-way communications between the states of '

Wisconsin and Minnesota, and the Emergency Operations Facility.  ;

Corrective actions in the area of Health Physics included a new Health Physics

training program, reportedly in place.

'l

4

8704030322 870326

PDR /

F ADOCK 05000409 '? '

PDR _ // 1

1 I

l

i

l

____ __. _ _ . _ _ . -- _ --. , _ - - --

. -- -- - -J

-

.

W. D. Shafer -?-

MAR 2 61987

It appeared from the presentation that the licensee is focusing attention to

the areas in r.eed of correction / enhancement, and that progress is adequate. We

will continue to monitor the licensee's progress through normal and eurmented

inspection effort.

James E. Foster

Senior Emergency Preparendess Analyst

Enclosures: As stated

"

cc w/ enclosures:

J. A. Hind

W. Snell

.

d

4

RIII, g RIII

(lW LCGS

Snell

Foster /as

03/24/87 3/37/37

$ /"

_ . - -

- .

-- . -_ -

. -

.- . -

- . _. . . --

..

ENCLOSURE 1

ATTENDEES

t'uclear Pegulatory Comission

William Snell

I. Villava

James Foster

W. Shafer

Dairyland Power Cooperative

Dan Weiss

John Parkyn

J. W. Taylor

Lynne Goodrnan

Rich Cota

Larry L. Nelson

P. W. Shafer

Scb Cherry

Pager Christians

I

i

.

i

i

__.

_. . . . _ _ . _ -

- -

.

- . .

, . ,

_

'

.'

~

' -

- -

-

ENCLOSURE-2

. 4

- .

,- .

4 -

,

EMERGENCY PREPAREDNESS PROGRESS' REPORT )

a

_

~; .. ' '- _

l

_

ltem from Inspection

Report No. 50-409/860ll(DRSS) Status

1. Extremity monitoring. EPP-6 has been revised and now requires

extremity monitoring for BOTH hands.

2. Failure at site area Projecting offsite dose-rates before

emergency to project what containment failure will be included-

offsite dose rates would in the next TSC training session.

be if containment failed.

3. NRC notification was late at EPP-2 is being revised to include the

site area emergency. the words, "This notification must be

completed as soon as possible after

state and local notifications and not

later.than 30 minutes after declaration

of EAL."

4. Better status boards Two new status boards have been

i

should be considered for fabricated and the computer printouts

the TSC/OSC. will be posted as they are produced.

5. Survey results were not New and better maps have been added to

recorded on survey maps. EPP-7 and a new status board map of the

site has been added in the TSC.

Training will emphasize logging the

survey results on these maps. The RAD

will remind surveyors before they leave-

the TSC to log readings.

6. Shielded transport cask A locking device has been installed-

came open in transit to that will prevent a reoccurrence of this

the laboratory. problem.

7. High rad areas should be The RAD will post and control.those

posted and controlled as high' rad areas that are needed to be

soon as practicable. posted.

8. Key to emergency kit was EPP-8 has been revised and now

forgotten. includes, obtaining the key to the

emergency kit storage area before

leaving the TSC.

9. Tweezer missing from the A tweezer has been added to the kit and

offsite kit. its inventory list.

l

10. Use of "THIS IS A DRILL" A meno has been issued to all potential

wasn't always used on the radio talkers reminding them of proper -

radio. exercise techniques. Also, future

training will emphasize proper radio

techniques.

pc2-3.4 1

1

- -

.

- -

- - -

.

., _

.

.. .

. .

, ~

_

.

.

_-

.-

Item from Inspection

8

Report No. 50-409/86011 (DRSS) Status -

. _

~

~

-

11. .. IIP inadequacies in offiste A completely new IIP training- program

performance. ~

has been generated and is in place that

-

includes offsite performance.

,

12. Status boards were A new larger EPZ map is being produced

'

inadequate in EOF. on which survey results and plume

tracking information can be written.

Information on plant status will be

available on computer which will also

provide hard copy information. The

necessity for other status boards will

be reviewed.

13. NRC notification information The LACBWR status sheet, jointly

may be inadequate. developed by DPC and NRC, has been

posted at each red phone and will be

used to provide necessary information.

If an open line is necessary, extra

personnel will be called in to man the

phone.

14. Enhance training of JPIC The JPIC technical representatives have

personnel to better cope been briefed on this subject and have

with providing technical been' informed that they. should take

information to media, part in the discussions and correct any

false information.

15. Communications problems A meeting was held on January 27 with

with the states. the states of Wisconsin and Minnesota

and an NRC representative. From this

meeting and follow-up discussions with

those present, several proposals to

enhance communications have been

suggested. Those improvements which

will definitely be enacted include j

maintaining an open line between the

states of Minnesota and Wisconsin and U

the EOF and decreasing the number of

calls to be made at Site Area Emergency

and General Emergency. Other

suggestions for improving

communications are being reviewed by

both states. A new telephone with new

number is being added to EOF to be used '

for the three way open line.

16. Evacuation time estimate EPP-2 is currently under revision and

information wasn't the evacuation time estimate table

included in EPP-2. from the Emergency Plan is being

included.

17. Investigate methods of In progress.

getting hard copy of

press releases to ECD.

pc2-3.4 2

'

.

. _- -

-

.

-

. . .

.'* _

,

,

.

. 'o .

-

_

_

_- . - - -

-

,

_-

.

. -

Miscelaneous Items from DPC

, observations, Past Inspections, etc. - Status- -

1. ECD Should be encouraged to- This;will be e'mphasized'in_ future .

-

call in extra people for training sessions.at TSC and EOF. ,

communications duties, etc.

2. Copy machine outside EOF A sign has been fabricated that will

should be dedicated to be placed at the machine during an

exercise / emergency. exercise / emergency to notify personnel

of this.

3. Metric unit on computer The computer program is being revised

caused some confusion. to output the information in miles.

4. Evacuees were sent to G-1 when In upcoming training, the wind

the wind was from the South direction and how it affects

(evacuated into the potential evacuation will be emphasized.

plume).

5. Valve lineup wasn't The procedure for obtaining a

necessary for PASS sample. containment building PASS sample has

PASS sample, therefore, was been changed to eliminate any

unnecessarily slow. confusion on prerequisite.

I

i

7

i

i

,

1

l

!

- . _ .

.pc2-3.4 3

.--

. . _ . . . - - . .