March 19, 1987
Docket Nos. 50-348, 50-364
Alabama Power Company
ATTN: Mr. R. P. Mcdonald
Senior Vice President
P. O. Box 2641
Birmingham, AL 35291-0400
Gentlemen:
SUBJECT: NOTICE OF VIOLATION
(NRC INSPECTION REPORT NOS. 50-348/87-03 AND 50-364/87-03
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
M. A. Scott on January 26-30, 1987.
The inspection included a review of
activities authorized for your Farley facility.
At the conclusion of the
inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
The inspection findings indicate that certain activities appeared to violate NRC
requirements.
The violation, references to pertinent requirements, and elements
to be included in your response are described in the enclosed Notice of Viola-
tion.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosures
I
will be placed in the NRC Public Document Room.
The responses directed by this letter and its enclosures are not subject to the
clearance procedures of the Office of Management and Budget as required by the
'
Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this letter, please contact us.
j
Sincerely,
(Original signed by D. Verrelli)
h87031905000348
87040
PDR
-
G
David M. Verrelli, Chief
Reactor Projects Branch No. 1
Division of Reactor Projects
Enclosures:
(See page 2)
S
Stol
. . _ _
_
.
_
_
..
_
_ _ .
_
-
.
-
,
,
l
.
_ Alabama Power Company
2
' March 19, 1987
Enclosures:
1.
2.
NRC Inspection heport
,
i
cc w/encls:
i
W. O. Whitt, Executive Vice President
i
J. D. Woodard, General Manager -
l
Nuclear Plant
W. G. Hairston, III, General Manager -
Nuclear-Support
.,
J. W. McGowan, Manager-Safety Audit
'-
and Engineering Review
J. K. Osterholtz, Supervisor-Safety
1
i
Audit and Engineering Review
j
bec w/encls:
E. Reeves, Project Manager, NRR
r
NRC Resident Inspector
l
Document Control Desk
j
State of Alabama
i
I
-
l
!
1
!
!
!
i
i
!
!
!
!
!
l
4
/
/
j
N
!'
RII
RII
'
RII
RII "
RII
II
'
f
Y
UD
\\/
,
i
E
t:es
GABelisle
CAdul an
A
HCDance
DMVerrelli
!
f/ /87
2
&
2/ /87
2/ - 87' 2// /S7
3fh
)/-/87
y/G[4]
1
8
/
\\
'
./
1
/
i
,
.- -
.
- - - .
. - .
-
. .
- .
.
---
. 2-
--- ---- : -
-