ML20205N937
| ML20205N937 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 05/05/1986 |
| From: | Olshinski J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | White S TENNESSEE VALLEY AUTHORITY |
| References | |
| NUDOCS 8605210016 | |
| Download: ML20205N937 (2) | |
Text
L((llnd MAY 0 51986 1
9 5
Tennesspe Valley Authority ATTN:/Mr. S. A. White Manager of Nuclear Power 6N 38A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Gentlemen:
SUBJECT:
POSTPONEMENT OF SEQU0YAH OPERATOR AND SENIOR OPERATOR LICENSING EXAMINATIONS The purpose of this correspondence is to confirm the telephone conversation of April 14, 1986, between W. M. Dean, of this office, and C. O. Brewer, Sequoyah Nuclear Plant.
Arrangements to conduct operator and senior operator examinations at the Tennessee Valley Authority, Sequoyah Nuclear Plant, were originally scheduled for the week of May 19, 1986.
Due to the unavailability of a sufficient number of licensed examiners that week, the examinations have been rescheduled for the week of May 26, 1986.
We do not anticipate any further changes to Sequoyah's examination schedule.
Thank you for your attention in this matter.
If you have any questions, please contact Mr. John Munro at 404/331-5544 or Mr. Bill Dean at 404/331-1178.
Sincerely, OR!GINAL SIGNED BY JOHN A. OLSHINSKI John A. 01shinski Deputy Regional Administrator for TVA cc:
R. Wallace, Plant Manager M. H. Noe, Supervisor, Operations
/ Training VH. L. Abercrombie, Sequoyah Site Director bec:
RC Resident Inspector ocument Control Desk State of Tennessee
/jLR.Denton,NRR V).L. Thompson,NRR ay r, E
~
. B. Hayes, 0I e605210016 860505 PDR ADOCK 05000327
. R. Connelly, 0IA V
PDR J. N. Grace, RII
- RII
- RII
- RII
- RII
- RII
- RII
- See Previcus PRShaw:sh BDean JFMunro CAJulian BTDebs SWeise 5/ /86 5/ /86 5/ /86 5/ /86 5/ /86 5/ /86 WYSL i
I
MAY 0 51986 Tennessee Valley Authority ATTN: Mr. S. A. White Manager of Nuclear Power 6N 38A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Gentlemen:
SUBJECT:
POSTPONEMENT OF SEQUOYAH OPERATOR AND SENIOR OPERATOR LICENSING EXAMINATIONS The purpose of this correspondence is to confirm the telephone conversation of April 14, 1986, between W. M. Dean, of this office, and C. O. Brewer, Sequoyah Nuclear Plant.
Arrangements to conduct operator and senior operator examinations at the Tennessee Valley Authority, Sequoyah Nuclear Plant, were originally schedoled for the week of May 19, 1986.
Due to the unavailability of a sufficient number of licensed examiners that week, the examinations have been rescheduled for the week of May 26, 1986.
We do not anticipate any further changes to Sequoyah's examination schedule.
Thank you for your attention in this matter.
If you have any questions, please contact Mr. John Munro at 404/331-5544 or Mr. Bill Dean at 404/331-4178.
Sincerely, ORIGINAL. SIGNED BY JOHN A. OLSHINSKI John A. 01shinski Deputy Regional Administrator for TVA cc:
P. R. Wallace, Plant Manacer C. H. Noe, Supervisor, Operations Training bec: NRC Resident Inspector De ument Control Desk State of Tennessee H. R. Denton, NRR H. L. Thompson, NRR J. M. Taylor, IE B. B. Hayes, 01 i
S.
P.. Connelly, 01A J. N. Grace, RII I
RIIp; f R
RII RII RI RII
\\
R aw:sh B
JFMunro C
an BTDebs Swejse 6 86 4/g/86 4/yj/86 5/I /86 4/2f/86 4
/86 4/
/
+
1 I
,