ML20205N904

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-348/86-09 & 50-364/86-09 on 860421-24.No Violations or Deviations Noted
ML20205N904
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 05/09/1986
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML20205N907 List:
References
NUDOCS 8605210003
Download: ML20205N904 (2)


See also: IR 05000348/1986009

Text

I

-

\ \ c, '

/

-!

,

.

t1AY 0 9 W36

Alabama Power Company

/TTN: Mr. R. P. Mcdonald

Senior Vice President

P. O. Box 2641

Birmingham, AL 35291

Gentlemen:

SUBJECT: REPORT NOS. 50-348/36-09 AND 50-364/86-09 .

On April 21-24, 1986, NRC inspected activities authorized by NRC Operating

License Nos. NPF-2 and NPF-8 for your Farley Nuclear Plant facility. At the

conclusion of the inspection, the findings were discussed with those members of

your staff icentified in the enclosed inspection report.

Areas cxamined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

Within the scope of the inspection, 'o violations or deviations were identified.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations a copy of this letter and its enclosure

will be placed in the NRC's Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

Original Signed by

H. C. Dance /for

David M. Verrelli, Chief

Reactor Projects Branch 2

Division of Reactor Projects

Enciosure:

Inspection Report Nos. 50-348/86-09

and 50-364/86-09

cp w/ encl:

% 0. Whitt, Executive Vice President l

d. D. Woodard, General Manager -

k.NuclearPlant

G. Hairston, III, General Manager -

, Nuclear Support

v0. W. McGowan, Manager-Safety Audit

vd.andEngineeringReview

K. Osterholtz, Supervisor-Safety

, Audit and Engineering Review

bcc w/ encl: (See page 2)

8605210003 860509

PDR ADOCK 05000348

G PDR 1( ()h

.

..

t

.

Alabama Power Company 2

bec w/ encl:

  1. RC Resident Inspector

(Z Reeves, Project Manager, NRR

Document Control Desk

State of Alabama

RII RII RII RII

C. .

) dmk hD

TR ollins:cdg CM os@ DMCollins HDance

W/ /86 05/]/86 05/1/86 04/f /86

h

-_ - - - - - - . -