ML20205N900

From kanterella
Jump to navigation Jump to search
Confirms 860416 Telcon Between Gf Trudeau & Ef Christnot Re Mgt Meeting on 860505 at Region II Ofc to Present Util Modules 18A, HVAC & 20, Instrumentation & Controls & App J, Equipment Qualification. Proposed Agenda Encl
ML20205N900
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 04/21/1986
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Kelly R
GEORGIA POWER CO.
References
NUDOCS 8605210002
Download: ML20205N900 (4)


Text

CM i cc3 -(-d.s i,PR 21.1986 Georgia-Power Company ATTN: Mr. R. J. Kelly Executive Vice President P. O. Box 4545 Atlanta, GA 30302 Gentlemen:

4

SUBJECT:

CONFIRMATION OF MEETING ARRANGEMENTS - V0GTLE - DOCKET N0. 50-424 This confirms the telephone conversation between Mr. G. F. Trudeau of your staff and Mr. E. F. Christnot of my staff on April 16, 1986, concerning a management meeting to be conducted at the Region II Office on May 5,1986, at 12:30 p.m.

Mr. Trudeau requested this meeting to present the following Georgia Power Company's Module No.18A, " Heating, Ventilation and Air-Conditioning"; Module No. 20, " Instrumentation and Controls"; and Appendix J, " Equipment Qualification" for your Vogtle facility to the NRC for review.

A proposed meeting agenda is enclosed.

Should you have any questions regarding these arrangements, we will be pleased to discuss them.

Sincerely, ORIGINAL SIGNED BY3 J. NELSON GRACE J. Nelson Grace Regional Administrator

Enclosure:

Proposed Meeting Agenda

{ccw/ encl:

VR. E. Conway, Senior Vice President &

/. Project Director D

O. Foster, Vice President, Project Support

/ P. D. Rice, Vice President, Project

. Engineering VR. H. Pinson, Vice President, Project Construction VJ. T. Beckham, Vice President &

General Manager - Operations V R. A. Thomas, Vice President, Licensing (cc w/ encl: Cont'd page 2) 8605210002 e60421 PDR ADOCK 0500 4

A

)

APR 2 1 gggs Georgia Power Company 2

.(cc w/ encl:. Cont'd)

VC. ' W. Hayes, Vogtle Quality Assurance Manager V W. C. Ramsey, Manager -

. Readiness Review VG. B. Bockhold, General Manager, Nuclear Operations

/L. Gucwa, Manager, Nuclear Safety and Licensing y'M. H. Googe, Project Construction Manager V E. D. Groover, Quality Assurance Site Manager -

Construction vJ. A. Bailey, Project Licensing Manager LG. F. Trowbridge, Esq., Shaw,

,.Pittman, Potts and Trowbridge VB. W. Churchill, Esq., Shaw, Pittman, Potts and Trowbridge vE. L. Blake, Jr., Esq., Shaw,

. Pittman, Potts and Trowbridge v'J. E. Joiner, Troutman, Sanders, Lockerman and Ashmore vJ. G. Ledbetter, Commissioner, Department of Human Resources VC. H. Badger, Office of Planning and Budget PD. Kirkland, III, Counsel, Office of the Consumer's Utility Council p D. C. Teper, Georgians Against Nuclear Energy v M. B. Margulies, Esq., Chairman, Atomic Safety and Licensing Board Panel vDr. O. H. Paris, Administrative Judge Atomic Safety and Licensing Board Panel VG. A. Linenberger, Jr., Administrative Judge Atomic Safety and Licensing Board Panel V. P. Garde, Citizens Clinic, Director B

Government Accountability Project bec w/ enc 1:

(See page 3) i i

APR 2 1 fW Georgia Power Company 3

d.c w/ encl:

be f Reis, ELD VW. M. Hill, IE vM

d. Miller,NRR

..Brach, ED0 M. Sinkule, RII

.E.

Christnot, RII VNRC Resident Inspector Document Control Desk State of Georgia RII RII RII RII RII 4'f' EChristnot:dm MSi ule VLB niee j

eye a ker 4/17/86 4/gd/86 4/gg/86 4//7 /86 4//7/86

APR 211986 ENCLOSURE PROPOSED MEETING AGENDA GEORGIA POWER COMPANY May 5, 1986, 12:30 p.m. - 4:00 p.m.

I.

Opening Remarks L. A. Reyes II.

Summary of Program Status / Schedule W. C. Ramsey III.

Georgia Power Company Presentation of the W. C. Ramsey Readiness Review Module and Appendix to and Staff the NRC IV.

Discussion of the Readiness Review Attendees Modules and Appendix V.

Closing Remarks L. A. Reyes

- -.