Amend 233 to License DPR-65,removing TS 3/4.6.4.3 from TS & Allowing Downgrading Sys to non-safety-related Sys
ML20205N352
Person / Time
Site: Millstone Dominion icon.png
Issue date: 04/12/1999
From: Clifford J
NRC (Affiliation Not Assigned)
To:
Shared Package
ML20205N358 List:
References
NUDOCS 9904160253
Download: ML20205N352 (6)


Text

e

=

n ntcy

["

}*4 UNITED STATES j

j NUCLEAR REGULATORY COMMISSION

't WASHINGTON, D.C. 20555-4001 8

.... 4 NORTHEAST NUCLEAR ENERGY COMPANY THE CONNECTICUT LIGHT AND POWER COMPANY THE WESTERN MASSACHUSETTS ELECTRIC COMPANY DOCKET NO. 50-336 MILLSTONE NUCLEAR POWER STATION. UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 233 License No. DPR-65

1. The Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment by Northeast Nuclear Energy Company, et al. (the licensee) dated January 18,1999, as supplemented February 3 and March 17,1999, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the hea!th and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

9904160253 990412 PDR ADOCK 05000336 P

PDR uo n;

. 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) / Facility Operating License No. DPR-65 is hereby amended to read as follows:

(2) TechnicalSpecifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 233, are hereby incorporated in the finnse. The licensee shall operate the facility in accordance with the Technical.epecifications.

3. This license amendment is effective as of the date of isst ance, to be implemented within 60 days of issuance.

FOR THE NUCLEAR RF JULATORY COMMISSION OV/YL James W. Clifford, Chief, Section 2 Project Directorate i Division of Licensing Project Management Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance: April 12,1999

ATTACHMENT TO LICENSE AMENDMENT NO.733 FACILITY OPERATING LICENSE NO. DPR-65 DOCKET NO. 50-336 Replace the following pages of the Appendix A, Technical Specifications, with the attached pages. The revised pages are identified by amendment number and contain verticallines indicating the areas of change.

Remove insert Vil Vil 3/4 6-23 3/4 6-23 B 3/4 6-4 8 3/4 6-4

INDEX LINITING CONDITION FOR OPERATION AND SURVEILLANCE REQUIREMENTS SECTION f1GE 3/4.6 CONTAINMENT SYSTEH1 3/4.6.1 PRIMARY CONTAINMENT.................

3/4 6-1 Containment Integrity................

3/4 6-1 Containment leakage.................

3/4 6-2 Containment Air Locks 3/4 6-6 Internal Pressure 3/4 6-8 Air Temperature...................

3/4 6-9 Containment Structural Integrity 3/4 6-10 3/4.6.2 DEPRESSURIZATION AND COOLING SYSTEMS 3/4 6-12 Containment Spray and Cooling Systems 3/4 6-12 DELETED 3/4.6.3 CONTAINMENT ISOLATION VALVES 3/4 6-15 Containment Ventilation System 3/4 6-19 3/4.6.4 COMBUSTIBLE GAS CONTROL 3/4 6-20 3/4 6-20 Hydrogen Monitors Electric Hydrogen Recombiners - W.......... 3/4 6-21 DELETED l

Post-Incident Recirculation Systems 3/4 6-24 3/4.6.5 SECONDARY CONTAINMENT................ 3/4 6-25 Enclosure Building Filtration System 3/4 6-25 3/4 6-28 Enclosure Building NILLSTONE - UNIT 2 VII Amendment No. JPJ, J)/, 777,71),233 0435

)

l 1

I i

This Page Intentionally left Blank.

i 1

J 4

MILLSTONE - UNIT 2 3/4 6-23 Amendment No. 233 1

0436

e GONTAINMENT SYSTEMS BASES 3/4.6.4 COMBUSTIBLE GAS CONTROL The OPERABILITY of the equipment and systems required.for the detection and control of hydrogen gas ensures that this equipment will be available to maintain the hydrogen concentration within containment below its flammable limit during post-LOCA conditions.

Either recombiner unit is capable of controlling the expected hydrogen generation associated with 1) zirconium-water reactions, 2) radiolytic decomposition of water, and 3) corrosion of metals within containment.

This hydrogen control system is consistent with I the recommendations of Regulatory Guide 1.7,

" Control of Combustible Gas Concentrations in Containment Following a LOCA."

The post-incident recirculation systems are provided to ensure adequate mixing of the containment atmosphere following a LOCA. This mixing action will prevent localized accumulations of hydrogen from exceeding the flammable limit.

NILLSTONE - UNIT 2 B 3/4 6-4 Amendment No. P33 0437