ML20205N309
| ML20205N309 | |
| Person / Time | |
|---|---|
| Site: | Fort Saint Vrain |
| Issue date: | 04/28/1986 |
| From: | Gagliardo J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Walker R PUBLIC SERVICE CO. OF COLORADO |
| References | |
| NUDOCS 8605020087 | |
| Download: ML20205N309 (2) | |
Text
.
- 7
- ., d.
0 In Reply Refer To:
Docket: 50-267 Public Service Company of Colorado ATTN:
R. F. Walker, President P. O. Box 840 Denver, Colorado 80201-0840 Gentlemen:
This acknowledges the receipt of your letter of February 24, 1986, by which you transmitted changes to Physical Security Plan, Revision 16 for your facility.
We find the changes in the subject letter and the attachment thereto to be consistent with provisions of 10 CFR 50.54(p). Accordingly, they are acceptable for inclusion into the plan.
The enclosures to your letter contain Safeguards Information of a type specified in 10 CFR 73.32 and are being withheld from public disclosure.
Sincerely, Original Signed By.
J. E. Gagliardo J. E. Gagliardo, Chief Reactor Projects Branch cc:
J. W. Gahm, Manager, Nuclear Production Division Fort St. Vrain Nuclear Station 16805 WCR 1915 Platteville, Colorado 80651 L. Singleton, Manager, Quality Assurance Division (same address)
Colorado Radiation Control Program Director RIV-S C:EP&SP D:D I P A RPB f
l R ' ng' art JPJaudon JEGagl 60 ABE e
at LAYande 4/st(/86 h/91/86
$y/j)/86
- f/23/86
)/f/
Casework Number 50-267/04XA 8605020007 860428 i
l poa anocko5oo27 g@;
q i
s 'l..
Public Service Company of Colorado bec w/o. letter dated 2/24/86 DMB (RG01)
BCC distributed by RIV w/ letter from licensee:
RPB E. H. Johnson, DRS&P Resident Inspector.
R. D. Martin, RA Section Chief-RPS/A R. L. Bangart RIV Official File Chief. EP&SPS J. Gibson, SSPD/NkR G. McCorkle, NMSS A. B. Earnest 50.54(p) book NRR Docket File Physical Security File RITS R&SPB
I SAF a a' = *.
w.
m y
' f($ PublicService
,mm...
Company of Colorauo d
February 24, 1966 Fort St. Vrain Unit fo. 1 P-86148 Pegion IV Administratcr D@@@@$%
U.S.
Nuclear Regulatory &~riission 611 Ryan Plaza Drive. Suite 1000 Arlingten, Texas 76011 I
6E L
Attn:
Mr. L. Yandell DOCKET N0: 50-267
SUBJECT:
Security Plan Revision #16
REFERENCE:
1)
Public Service Letter, I
Gahm to Johnson, dated 06/04/85 (P-85183) 2)
NRC Letter, Johnson to
- Lee, dated 07/02/85 (G-85256)
Dear fir. Yandell:
In accordance with the provisions of 10CFR50.54 (p), Revision 16 of the Fort St. Vrain Physical Security Plan with Appendix "B",
" General Criteria for Security Personnel," are submitted for review and approval as the operational Security Plan for Fort St. Vrain.
In addition, Appendix "C",
" Safeguards Contingency Plan",
is included as Revision 16, with no changes and Appendix "A",
"Special Security fieasures During Refueling Operations" (Confidential). is being submitted as Revision 16, with no changes, under separate cover.
This Plan revision is in response to Reference (1) regarding proposed changes to the Security Plan and Reference (2), which refers to NRC acceptance of these proposed changes.
As a result of these letters, appropriate changes have been accomplished in the fort dt. Vrain Physical Security Plan and other noderate changes have been incorporated into the Security Plan, which are also documented in the Explanation of Changes (Attachments 1 and 3).
Inese changes are being s ubini t ted prior to and in anticipation of the completion of constructinn and upgrade of areas addressed by these changes.
We request that the enclosed information be withheld from public disclosure pursuant to the provisior.s of 10CFR2.790 (d) and 10CFR73.21.
E SURE CONTAINS S ArruUARDS INFORMATION 8 A ;..
p#
qg UPON SEPARATION 'IEIS l
T.
',,, g
~
PAGE IS DECONTROLLED 9G mAWal
>q
-nen
m[ege-
~ SAFF.P.Ft PDG
^
lNFOT..
- ., :::N u
',,b
! (V.
~If you.have any questior.s Mr. F.J. Novachek at (303) 571-7436,ccr.cerningthese natters, please contact extension 201.
Sincerely, ifd f cer.
.W.
Gahm Manager, Nuclear Production Fort St. Vrain Nuclear Generating Station JUG:BJB/mlt Attachments :
1 - Explanation of Changes - Physical Security Plan 2 - Physical Security Plan (Revision 16) 3 - Explanation of Changes - Appendix "B", " General Criteria ~ for Security Personnel" 4 - Appendix "B", ~" General Criteria for Security Personnel,"
Fort St. Vrain Security Plan (Revision 16) 5 - Appendix "C", " Safe Guards Contingency Plan" (Revision 16) 0 t
SURE C0!nAINS ARDS INI'ORMATION
![&
SEPARATION Tills SAFEGl..m.3.,:,
eacs is cacenem INFOR..
J.;.
)
e-
{
ft I t
gg;p
%f&WSSS
CD bW "O
~.
c*.
<e h 'PublicService
= g ; &,.a.
Februa ry 24, 1986 Fort St. Vrain Unit No. 1 P-06147 Region IV Administrator
) @ @ ['
U.S.
Nuclear Regulatory Connission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 I
O l$O Attn:
Mr. L. Yandell
^
DOCKET N0:
50-267
SUBJECT:
Security Plan Revision #16
REFERENCE:
1)
Public Service Letter, Gahn to Johnson, dated 06/04/85 (P-85183)
- 2) NRC Letter, Johnson to Lee, dated 07/02/85 (G-85256) w-
Dear Mr. Yandell:
In accordance with the provisions of 10CFR50.54 (p), Appendix "A",
"Special Security Measures During Refueling Operations" Revision 16 of the Fort St. Vrain Physical Security Plan is submitted for review and approval with no changes.
Revision 16 of the Fort St. Vrain Physical Security Plan with Appendix "B" and Appendix "C" have been submitted under separate cover.
With this transmittal, your organization will have a complete copy of the Fort St. Vrain Physical Security Plan, Revision 16.
We request that the enclosed information be withheld from public disclosure pursuant to the provisions of 10 CFR 2.790 (d) and 10 CFR 73.21.
Aument Trammitted
.'rowlih Co.Cns
- Ng'-"]^g^<5 _
6=na
@,$/
T!ONAL SECURITY INFORMATION t
07
..a J.L I,c6t.nj
' d N nT't}f>. "~"! $ :7v IN;:'
x = = fc. a w,
CONFIDEMTIAL p!
o 4 Gd>3.n t ec Cog
,.a
?
1!W If you have any questions concerning these ratters, please contact Mr. F.J. flovachek at (303) 571-7436, extension 201.
Sincerely, lNdf W' -
J.W. Gahd fianager, Nuclear Production Fort St. Vrain fluclear Generating Station JifG:BJB/mlt Attachmer.ts :
1 - Appendix "A", "Special Security Measures During Refueling Operations" (Revision 16).
J nn m Q" % p w -
l 4cP
- er
\\
g #rMA A "J MD-W#
s.sh Ab m N
,& fJ-nu& # j s,'. o. x 4 ou &9""
'Q~J.
9"9 #
i I
COMF" ~
.