Requests Results of Investigation of Allegations by Contractor Who Indicated Loss of Quality Exit Interview Notes Following Contract Termination & Concerns Re Orders by Supervisor Not to Follow Work Permit Procedures
ML20205M937
Person / Time
Site: Peach Bottom  
Issue date: 10/21/1988
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Corbin McNeil
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
References
NUDOCS 8811030363
Download: ML20205M937 (2)


Text

-

r

'f-(,J a-

-\\

i 2100T 1988 l

6 i

i

.h Docket Nos.

50-277 50-278 j

m

. Philadelphia Electric _ Company ATTN: Mr. C. A. M<;Neill Executive Vice President-Nuclear Correspondence Control Desk l

P. O. Box 7520 t

Philadelphia, Pennsylvania 19101 i

Gentlemen:

Subject:

Allegation Review Request As discussed during the telephone conversation between Mr. James Linville of the f

Nuclear Regulatory Commission and Mr. Dickinson Smith of the Peach Bottom Atomic Power Station on October 18, 1988, we request that you investigate the allegations regarding a UE&C-Catalytic contractor who indicated that his quality exit interview notes were lost following his termination, and about concerns he raised in that interview regarding orders not to follow Radiation Work Permit c

procedures by his supervisor.

Please provide this office the results of your investigation within 30 days of receipt of this letter.

[

L We appreciate your cooperation in this matter.

l i

Sincerely, WML SSNED BY I

)

t E. C. Waaringer, Chief f

Projects Branch No. 2 I

Division of Reactor Projects l

i i

1 i

[

l

$@MO$$$bkb!O.

7 O

0FFICIAL RECORD COPY ALLEGATION REVIEW REQUEST

(

0001.0.0

^

i 10/20/88 i g

~

n i

,,. i..

j..... -

~

Philadelphia Electric Company 2

2100T 1988 a u :.

cc John S.-Kemper, Sr., Senior Vice President-Nuclear J. W. Gallagher, Vice President, Nuclear Services E. C. Kistner, Chairman, Nuclear Review Board Dickinson M. Smith, Vice President, Peach Bottom Atomic Power Station Jack Urban, General Manager, Fuels Department, Delmarva Power & Light Co.

John F. Franz, Plant Manager, Peach Bottom Atomic' Power Station l

Troy B. Conner, Jr., Esquire t

W. H. Hirst, Director, Joint Generation Projects Department, Atlantic Electric Bryan W. Gorman, Manager, External Affairs Eugene J. Bradley, Esquire, Assistant General Counsel (Without Report)

Raymond L. Hovis, Esquire Thomas Magette, Power Plant Siting, Nuclear Evaluations l

W. M. Alden. Director, Licensing Section Doris Poulsen, Secretary of Harford County Council l

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector Commonwealth of Pennsylvania I

bec:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o enc 1) e Section Chief, ORP PA0 (2) SALP and All Inspection Reports Robert J. Bores, DRSS R. Martin, NRR B. Clayton, EDO 1

I l

i L

?

RI:0 RI RP R

i Gadz rh1 Li ille ger 10/d#/88 10/)j/88 10h/88

(

i 0FFICIAL RECORD COPY ALLEGATION REVIEW REQUEST -

i 0002.0.0 f

10/20/88 J

!