e s 'a s UNION ELECTRIC COMPANY 1901 Grotiot Street St. Louis April 8,
1986 Donald E Schnell Vice President Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D. C.
20555
Dear Mr. Denton:
ULNRC-1288 DOCKET NUMBER 50-483 CALLAWAY PLANT i
LICENSE CONDITION C(7) (b)
Reference:
1)SLNRC-83-19 dated 4/15/83 2)SLNRC-86-04 dated 2/27/86 License Condition C (7) (b) of Callaway Facility Operating License, NPF-30 requires a fully functional Technical Support Center (TSC) and Emergency Operations Facility (EOF) and a fully operable Emergency Response Facilities Information System (ERFIS) prior to startup following the first refueling outage.
The purpose of this letter is to provide the current status of these facilities and system and to confirm our commitment that these will be completed, as required by the license condition.
In order to assess the operability of the emergency response facilities for Callaway, an Emergency Response Facility Assessment Program has been established.
This program assess 5s the readiness of the TSC and EOF and is based on a draft of the 1
NRC IE Inspection Procedure for Emergency Preparedness.
The assessment evaluated the physical facilities, the computer based information management systems and equipment 1 (including model and system reliability and validity), radiological equipment and supplies, dose assessment capabilities, communications equipment, and necessary plant records and drawings.
This program utilized engineering evaluation and walk throughs to verify functional capabilities of the emergency response facilities and information systems.
With this program we have determined that the subject facilities and information systems are fully functional.
4
}
Additionally, in response to Generic Letter 82-33 concerning Supplement 1 to NUREG-0737, Requirement for Emergency Response capability, UE committed in Reference 1 to completion of the Safety Parameter Display System (SPDS) by the first refueling.
Reference 2 documents that the SNUPPS SPDS Verification and Validation Program has been completed and that the system hardware and software requirements are complete at Callaway.
Since the SPDS is a part of the ERFIS, the previously discussed program also concluded that the SPDS is fully functional.
8604150186 860408 PDR ADOCK 05000483 PDR a
p Mailing Address: RQ Box 149, St. Louis, MO 63166 Ifg
Training on the SPDS for operating crews and shift technical advisors has been completed.
Training of emergency response personnel on the SPDS and ERFIS is currently being conducted and will be completed on April 9, 1986.
Based on the preceding discussion, the emergency response facilities and.information system are. complete with the exception of training which will be complete on April 9.
The. activities associated with close-out of this license condition are available for on-site review.
If there are any questions please contact us.
Very truly yours, Donald F.
Schnell DS/bjk L
.m
i STATE OF MISSOURI )
)
Donald F.
Schnell, of lawful age,..being first duly sworn upon oath says that he is Vice President - Nuclear for Union Electric Company; that he has read the foregoing document and knows the content thereof; that he has executed the same for and on the behalf of said company with full power and authority to do so; and that the facts therein stated are true and correct to the best of his knowledge, information and belief.
By Donald F.
Schnell Vice President - Nuclear SUBSCRIBED and sworn to before me this day of
, 1986-L 0 96u J PF 8F M8 l
BARBAR NOTARY PUBu0, STATE OF MISSOURI NY COMMISSION EXPLRES APRIL 22,1983 ST. LOUIS COUNTY i
n u
"a"ald Charnoff, Esq.
Shaw, Pittman, Potts,& Trowbridge 1800 M.
- Street, N.W.
Washington, D.C.
20036 Nicholas A.~
Petrick Executive Director SNUPPS 5 Choke Cherry Road Rockville, Maryland. 20850 C. U. Hehl
. Division of Projects and Resident Programs, Chief, Section lA U.S.
Nuclear Regulatory Commission.
Region III 799 Roosevelt Road Glen Ellyn, I111nois 60137 Bruce Little Callaway Resident Office
.U.S.
Nuclear Regulatory Commission RRil Steedman, Missouri 65077 Paul O'Connor Office of Nuclear' Reactor Regulation U.S.
Nuclear Regulatory Commission Mail.Stop 316-7920 Norfolk. Avenue Bethesda, MD 20014 Manager, Electric Department Missouri Public Service Commission P. O.
Box 360 Jefferson City, MO 65102 m.
--m...