ML20205M298

From kanterella
Jump to navigation Jump to search
Forwards Application for Amend to License NPF-73,consisting of Change Request 17,extending Certain 18-month Tech Spec Surveillance Requirements Intervals for First Fuel Cycle to Completion of First Refueling Outage
ML20205M298
Person / Time
Site: Beaver Valley
Issue date: 10/24/1988
From: Sieber J
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20205M300 List:
References
NUDOCS 8811030026
Download: ML20205M298 (2)


Text

'

L * '

l ,

My PtM9f $taten

$*4$vvy. ort, PA 150774004 i

701,% .cs, unm October 24, 1988 U. S. Nuclear Regulatory Commission Attn Document control Desk Washington, DC 20555

Reference:

Beaver Valley Power Station, Unit .7. 2 Docket No. 50-412, License No. NPF-73 Proposed operating License Change Request No. 17 Gentlemen:

ifnclosed are:

1. An Application for Nuendment to the above operating license to extend certain 18-month Technical Specification surveillance requirements intervals for the first fuel cycle to the completion of the first refueling outage.
2. Documents designated Attachments A, B and C which set forth the change in Technical Specifications, the safety analysis and the no significant hazards evaluation. This change was reviewed by the OSC and ORC and determined to be safe and does not involve an unreviewed safety question.

The proposed surveillance requirements extensions requested per this amendment include surveillance times which may exceed their allowed surveillance interval, when adding in the 25% allowable extension per Specification 4.0.2, prior to the first refueling outage. These surveillance requirements can not be performed during plant operation and would therefore require an otherwise unnecessary plant shutdosn to complete. Duri.sg a short outage in January, 1988, many of tL.

required 18-month surveillances were completed as scheduled restraints permitted. Should an unscheduled outage occur of sufficient lenqth, Duquesne Light company will make every effort to complete the required 18-month surveillances, our currently scheduled first refueling outage cate for Unit 2 is March 17, 1989.

This outage date will not be exter.ded beyond April 1, 1989 if the required 18-month surveillance requirements extended per this amendment request have not been completed by this date. This will ensure that these 18-month survoillance intervals are not extended beyond a reasonable time.

,Ob fg1030026891o24 h p ADOCK 050004 a PD

B'Jovar Vallov Powar Station, Unit No. 2 Docket No. 3s-412, License No. NPF-73 Page 2 This amendment request is required prior to December 22, 1988 to avoid a plant shutdown te complete the required surveillances. Your prompt attention to this application is appreciart*,

A check in, the amount of $150.00 will be forw. 1 nder separate cover as payment of the license amendment app c. f.on fee in accordance with 10CFR170.

Very truay yours, l f

Vice President Nuclear Group cc: Mr. J. Beall, Sr. Resident Inspector Mr. W. T. Russell, NRC Region I Administra -or Mr. P. Tam, Project Manager

. Director, Safety Evaluation & Control (VEPCO)

Mr. T. M. Gerusky, Director 3RP/ DER Mr. R. Janati, BRP/ DER h

i i

l >

t I

-_-.__-..._ _ _ - , _ _ _ _ _ _ - ~ . -