Forwards Jl Danek Supplemental 860221 Affidavit Correcting 860121 Affidavit Supporting Licensee Motion for Summary Disposition of Contention 7.Correction Changes Actual Exposure Incurred in Reracking to 13.20 person-rem
ML20205K514
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 02/25/1986
From: Fallon M
FLORIDA POWER & LIGHT CO., NEWMAN & HOLTZINGER
To: Cole R, Lazo R, Luebke E
Atomic Safety and Licensing Board Panel
Shared Package
ML20205K519 List:
References
CON-#186-221 OLA-2, NUDOCS 8602270480
Download: ML20205K514 (3)


Text

.

4' -

/7h p- NEwxAN & HOLTZINGER, E C.

ISIS L STREET. N.W. DOCHETED

  • JACm # NCwMAN WASHINGTON. O.C. 20036 untuAM t mAtm.Jn JOMN E MOLTZINGCR.JR MANOLD F REiS DOUGLASL.3(S(SrQRD j teAum'CE AstLnAD 3AmeAaA A Oue.comest 2O2*955 6600 JANETr s tenen J. A SOURN4MT.JA
  • i

,h segmLt w ,ALLON

%,"c" A. February 25, 1986 *"",",,"'",^"l2 MATMLEEN M. SME A SfhAN N GISM DAWD G POWELL

,,,",","f,f""",,

QQ =MLL E GaANT UUCMEIm G a/,yj * * ^ '

/v",*o',, mag,,

JOMN T. STOUGM. JR james e v4Sitt -

OkAkN FRAmm a UNOM navNJ ueSoM eseChAEL A SAUSCR OAWD 9 RASeum ALvtN M. GUTTtmesAN JANCI #YAN KEviN p GALLEN DONALD J 58LvtRMase TMonsAS A SCMMUT2 JACOLYN A S*Me*ONS NTt TC JO $ S S SCOTT A. MARMAN ,1 moetRT LowtNSTEste 8eoemeAN A FL ANINGAM OF CouseSE 6 Dr. Robert M. Lazo, Chairman Dr. Lumeth A. Luebke Dr. Richard F. Cole Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Washington, D.C. 20555 'i Re: Florida Power & Light Co. (Turkey Point Plant, Units 3 and 4), Nos. 50-250 OLA-2 and 50-251 OLA-2 (Spent Fuel Pool Expansion)

Dear Licensing Board Members:

The purpose of this letter is to inform the Board and the parties of a correction to one of the statements in the affidavits filed in support of Licensee's Motion for Summary Disposition of Intervenors' Contentions 1(January 23, 1986). On page 15, paragraph 32 of the Affidavit of Joseph L. Danek on Contention No. 7, Mr. Danek stated that

"[t]he actual exposure incurred during the reracking was 13.17 person-rem." 'As is explained in the attached Supplemental Affidavit of Joseph L. Danek on Contention No. 7, the actual exposure was 13.20 person-rem, not 13.17 person-rem.

The 13.17 person-rem exposure total was calcula_ted by an ALARA engineer who incorrectly transcribcd a computer j generated Radiation Work Permit (RWP) person-rem exposure figure as .01 when the actual figure was .04. At the time Mr. Danek signed his previous affidavit, neither he nor FP&L was aware of thic~ error. The mistake by the ALARA engineerfwas discovered by FP&L, after Mr. Danek had executed his previous affidavit, when the NRC reviewed the exposure reported by FP&L and calculated a total exposure level of

, 13.20 person-rem. t 8602270480 860225 PDR ADOCK 05000254 h G f

[ NawmAw & Hoxxzzw:m:2, P. C.

In order to provide the Board and the parties with the correct information Mr. Danek has executed a new affidavit and has explained how the mistake occurred and how it was discovered. Use of the 13.20 person-rem exposure level does not materially affect the substance and conclusions of Mr. Danek's previous affidavit.

The 13.17 person-rem exposure level figure was also used,-with citations to Mr. Danek's affidavit, in the Affidavit of Rebecca K. Carr on Contention No. 7, in Licensee's Motion for Summary Disposition of Intervenors Contentions and in Licensee's Statement of Material Facts as to Which There is no Genuine Issue to be Heard with Respect to Intervenors' Contentions. For the Board's convenience, I have attached, as Appendix A, a list of all citations to the 13.17 figure in documents submitted to the Board.

I apologize for the inconvenience this has caused the Board and the parties.

Respectfully submitted, r

974f h)hlk, Merle W. Fallon Co-Counsel for Florida Power & Light Company Enclosure cc (w/ enc.): Service List I

APPENDIX A CITATIONS TO 13.17 PERSON-REM THAT SHOULD BE CHANGED TO 13.20 PERSON-REM IN SPENT FUEL POOL EXPANSION (OLA-2) PROCEEDING A. LICENSEE'S MOTION FOR

SUMMARY

DISPOSITION OF INTERVENORS CONTENTIONS

1. Page 33 at line 27
2. Page 37 at line 16
3. Page 38 at.line 10 B. LICENSEE'S STATEMENT OF MATERIAL FACTS AS TO WHICH THERE IS NO GENUINE ISSUE TO BE HEARD WITH RESPECT TO INTERVENORS' CONTENTIONS
1. Page 17 at line 3 C. AFFIDAVIT OF REBECCA K. CARR ON CONTENTION NO. 7
1. Page 9, table 2 - In " Actual Uait 3 Exposure" column, change the " Person-rem" figure for " Removal of Old Racks" from 4.99 to 5.02 and change the " Total" for the column from 13.17 to 13.20.
2. Page 14 at line 5 D. AFFIDAVIT OF JOSEPH L. DANEK ON CONTENTION NO. 7
1. Page 15 at line 13
2. Page 16 at line 10
3. Page 18, table 2 - new table provided i

l