Forwards Safety Insp Repts 50-277/88-28 & 50-278/88-28 on 880829-0902.No Violations Noted.Observed That Auxiliary Operator Did Not Follow Explicit Instructions of Routine Test Procedure
ML20205J804
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 10/21/1988
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Corbin McNeil
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20205J806 List:
References
NUDOCS 8810310489
Download: ML20205J804 (2)


See also: IR 05000277/1988028

Text

.

.

'

!

.

WI21198g

Docket Nos. 50-277

License Nos. DPR-44

50-278

DPR-56

Philadelphia Electric Company

ATTN: Mr. C. A. McNeill

Executive Vice President-Nuclear

2301 Market Street

Philadelphia, Pennsylvania 19101

Gentlemen:

Subject:

Routine Safety Inspection Nos. 50-277/88-28 and 50-278/88-28

This letter refers to the routine safety inspection conducted by Mr. M. Dev of

this office on August 29 - September 2, 1988, at the Peach Bottom Atomic Power

station, Delta, Pennsylvar ta of activities authorized by NRC License Nos.

DPR-44 and OPR-56, and to the discussions of our findings held by Mr. Dev with

Mr. D. Smith, Vice President, Peach Bottom Atomic Power Station, and other

members of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the NRC Region !

Inspection .eport which is enclosed with this letter. Within these areas, the

inspection consisted of selective examinations of procedures and representative

records, interviews with personnel and observations by the inspectors.

Within the scope of this inspection, no violations were identified. However,

your attention is warranted to the observations and concerns stated in

applicable paragraphs of this report.

In particular, as discussed in paragraph

3.2.2.C of the attached report, an inspector determined that an auxiliary

operator did not follow the explicit instructions of a routine test procedure,

nor did he notify the chief operator of the deviation in the routine test.

Previously, in the PBAPS shutdown order, the NRC cited similar concerns ielated

to failure of the operations personnel to adhe 9 to procedural requirements,

and poor comunication among different plant e :ities.

The Plant Manager's instruction of September 1,1988 to plant operations

personnel was an immediate and positive management response to the NRC

concerns. However, we request that you respond further iri writing to the NRC

describing your long term actions to address this concern.

The response requested by this letter is not subject to the clearance

procedure of the Office of Management and Budget as required by the Paperwork

Reduction Action of 1980, PL 96-511

f'OI

0FFICIAL RECORD COPY

CIR PB 88-28 - 0001.0.0

10/18/88

8810310489 SS1021

PDR

ADOCK 05000277

0

PDC

.

.

.

D.

'.

Philadelphia Electric Company

2

Your cooperation with us in this matter is appreciated.

Since' rely,

Original Signed By:

Thomas T. Martin

Thomas T. Martin, Director

'

Division of Reactor Safety

Enclosure: NRC Region I Combined Inspection Report Nos. 50-277/88-28 and

50-278/88-28

cc w/ encl:

John S. Kemper, Sr. , Senior Vice President-Nuclear

J. W. Gallagher, Vice President, Nuclear Services

E. C. Kistner, Chairman, Nuclear Review Board

Dickinson M. Smith, Vice President, Peach Bottom Atomic Power Station

Jack Urban, General Manaser, Fuels Department, Delmarva Power & Light Co.

John F. Franz, Plant Manager, Peach Bottom Atomic Power Station

Troy B. Conner, Jr. , Esquire

W. H. Harst, Director, Joint Generation Projects Department, Atlantic Electric

Bryan W. Gorman, Manager, External Affairs

Eugene J. Bradley, Esquire, Assistant General Counsel (Without Report)

Raymond L. Hovis, Esquire

Thomas Hagette, Power Plant Siting, Nuclear Evaluations

W. M. Alden, Director, licensing Section

Doris Poulsen, Secretary of Harford County Council

Public Document Room (POR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

Comonwealth of PENNSYLVANI A

bec w/ enclosure:

Management Assistant, ORMA (w/o enc 1)

Section Chief, DRP

K. Abraham, PA0 (2)

Robert J. Bores, DRSS

R. Martin, NRR

B. Clayton, E00

NRC Resident inspector

. ' ,1

/ RI:0R

RI:0RS

hl:0RS

9/ty

<

Dev ^ '

Blumberg

Gal 19

$

/f/27[/

g)[

10/4/f.8

10/)/88

10//u/88

OFFICIAL RECORD COPY