Forwards Safety Insp Rept 50-346/88-34 on 880912-16 & 1003-05.Violations Noted.Certain Allegations of Improper Work Practices Involved nonsafety-related Duct Work in Boric Acid Room.Licensee Should Review Accuracy of Concern
ML20205J665
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 10/26/1988
From: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Shelton D
TOLEDO EDISON CO.
Shared Package
ML20205J669 List:
References
NUDOCS 8810310455
Download: ML20205J665 (2)


See also: IR 05000346/1988034

Text

.

.

,1%

,o . . .

.

.

OCT 2 61988

Docket No. 50-346

Toledo Edison Company

ATTN: Mr. Donald Shelton

Vice President

Nuclear

Edison Plaza

'300 Madison Avenue

Toledo, OH 43652

Gentlemen:

This refers to the special safety inspection of activities related to Allegation

RIII-88-A-0057, conducted by Messrs. J. F. Schapker, J. M. Ulfe, and

J. R. Kniceley of this office on September 12-16, and October 3-5, 1988, of

activities at the Davis-Besse Nuclear Power Station authorized by NRC Operating

License No. NPF-3 and to the~ discussion of our findings with Mr. L. Ramsett at

the conclusion of the inspection. This allegation involved the improper

installation of fire dampers and stainless steel duct work in the containment,

violations of security barriers, and fire watch patrol activities.

The enclosed copy of our inspection report identifies areas examined during

the inspection concerning allegations of Quality and Safeguards violations.

Within these areas, the inspection consisted of a selective examination of

procedures and representative records, observations, and interviews with

personnel.

No violations of NRC requirements were identified during the course of this

inspection; however, the licensee's Ombudsman Program was not successful in

resolv.ing the concerns of an individual who had presented the same concerns to

the licensee. This weakness in the licensee's Ombudsman Program could have

contributed to the individual contacting the NRC concerning these issues.

1he NRC inspectors determined that certain allegations of improper work

practices involved nonsafety-related duct work in the Boric Acid Room. Due to

the inaccessibility of the ducts in this room, the NRC inspector was not able

to perform a thorough inspection to verify the validity of the allegation.

This concern was made to the licensee through the Ombudsman Program, but was

not adequately investigated to detennine the validity of the concern.

Although the duct work in the Boric Acid Room is nonsafety-related the

licensee should review the accuracy of the concern and if substantiated,

verify that like activities did not occur on safety-related ducts during work

performed by this contractor. Upon completion of this review, the licensee

- should advise this office of the results.

t

g

8810310455 891026 \

PDR ADOCK 05000346

O PDC

W o/

- -

.

-

,.

.

. .

.

Toledo Edison Company 2 OCT 2 61988

In accordance with 10 CFR 2.790 of the Comnission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

,- - ' : j c. J. ': ..a

J. J. Harrison, Chief

Engineering Branch

Enclosure: Inspection

Report No. 50-346/88034(DRS)

cc w/ enclosure:

L. Storz, Plant Manager

DCD/DCB(RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Harold W. Kohn, Ohio EPA

James W. Harris, State of Ohio

Robert M. Quillin, Ohio

Department of Health

State of Ohio, Public

Utilities Commission

ti

RIII RI!I RIII I RI'I III '

//v5'c apker/jk 1e Kn ce y . Da e n r son

[ 10/24/88 10/n /88 10/tA/88 10gj/88 100{/88 10/2//88 10/2V88