ML20205H951

From kanterella
Jump to navigation Jump to search
Forwards Rev 5 to SAR for Chem-Nuclear Sys,Inc Model CNS 8-120B Type B Radwaste Shipping Cask. Revs Accommodate Matl Availability & Fabrication Details.Rev Instructions & Summary of Drawing C-110-E-0007 Changes Encl
ML20205H951
Person / Time
Site: 07109168
Issue date: 12/09/1985
From: Richard Anderson
CHEM-NUCLEAR SYSTEMS, INC.
To: Macdonald C
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
Shared Package
ML20205H954 List:
References
0839V, 26158, 839V, C8511-09, C8511-9, NUDOCS 8601300041
Download: ML20205H951 (3)


Text

.

l/-f/b5 r.

CHEM -NUCLEAR SYSTEMS, INC.

135 Darling Drive

.T / ?X.dW u.- -..v.e.r.O... l.

Q, i%FW.

. Qlq./]t..QkSf

[ g 89 December 9, 1985

,[~

[

a.I 58$

.m. p, U.Fel1Q2Qhe up n e Ls C8511 -09 Q.W-W.d

- CIWe~f 3 Mr. Charles E. INDonald Transportaticn Certification Branch Division of Fuel Cycla and Material Safety, 'NSS d"

United States Nuclear Regulatory Commission A

6]$

Washington, D. C.

20555 Rg

?4 R

Subj ect:

Revision 5 to SAR for CNS 8-1208 Shipping Cask 4 E

G.e NRC Docket 71-9168 2?

Reference:

(1) CNSI letter (C8508-27) dated August 26, 1985; HRC ocket 71-9168.

rv

Dear Mr. MacDonald:

The proposed ratchet binder closure system transmitted by Reference (1) is hereby withdrawn. Enclosed please find eight copies of revised pages for the CNSI 8-120B Safety Analysis Report which supersedes the Reference (1) proposed-amendment in its entirety. The present approved status of the SAR is revision 4, March 1985. The enclosed revised pages are designated as revision 5, November 1985. This-transmittal also includes a revision to the package drawing, C-110-E-0007 The changes made are summarized on Attachment One. for your convenience. The changes incorporated in the SAR and drawing are needed to accomodate material availability and fabrication details.

None of these changes affect the conclusions of ~the Safety Analysis. Certain editorial corrections have also been made to the SAR, to reflect-the previously approved use of 20 primary lid closure bolts.

Please note that the drawing submitted for incorporation in the SAR, C-110-E-0007 (NP), is non-proprietary and includes all information of importance to the safety analysis.

wit is our understanding that the application fee forwarded with Reference (1) may be used to initiate review of this amendment.

Please feel free-to contact me or Kevin Kingsley of my staff, with any ouestions, g

{

w w

Very truly yours, O

A 6

GENERAL NUCLEAP. SYSTEMS, INC.

Doc e 3j usNac

-o

/.

A

(

DEC 101985 5 5 3 Robert T. Anderson W ss 6

"l[SyQ Director, Cask and Transportation Systems t

s

-J x

/gfs 9601300041 E51209 L

s, r.

y

[g ADOCK 0710 8

0839V

{DR

j ATTACHMENT ONE TO C8511-09 SUMf!ARY OF CHANGES FOR CNSI DRAWING C-110-E-0007 LOCATION WAS'(Rev B)

CHANGED T0 (Rev C)

COMMENT Item #1, 2, 3, ASTri A414A ASTit A570 Gr 45 (A) 4, 8, 10, 13, Overpack shell 40 Item #21 2-1/2" ASTM A516-70 3" ASTM A514 or A517 Bolt ring (1.)

Item #37, 38

-100*F to +500*F

-65*F to 450*F (2.)

55, 56 Item #43, 46, Parker P/N 600-6201 Parker P/N, Series 6242 48 Sections:

Z-Z, W-W, V-V, Miscellaneous changes _ to (3.)

S-S, 0-0 and optimize fabrication tolerances

. Detail s: A, B, and incorporate Item #21 change C, E where appropriate 1.

~ The revised item #21 is thicker and fabricated frcit a stronger material.

A516:

Sy = 38 ksi Su = 70 ksi A514/517: Sy = 90 ksi Su = 105 ksi Therefore, the structural. safety analysis which presently shows acceptable results for the 2-1/2" - A516 will also be satisfied by the 3" - A514/517.

2.

New temperature range continues to_ satisfy safety analysis requirements (SAR page~ 3-4) 3.

Certain fabrication details are not incf 4% on the HP version of C-110-E-0007.

i

)

INSTRUCTIONS FOR REVISION 5 UPDATE TO CNS 8-120B SAR REMOVE INSERT-Title Page Revision 4 Title Page rev 5

p. 2-16 rev 2
p. 2-16 rev 5 2-17 rev 1 2-17 rev-5
p. 2-63 rev 5
p. 2-63 2-64 rev 3 2-64 rev 3
p. 2-69 rev 3-
p. 2-69 rev 3 2-70 2-70 rev 5
p. 4-1/2 rev 1
p. 4-1/2 rev 5 Appendix 1.3; Appendix 1.3; Drawing C-110-E-0007 Rev B Drawing C-110-E-0007 (NP) Rev C sheets 1 and 2 sheets 1 and 2-y__