e e

'Af Telephone (412) 393-6000 Nuclear Group P.O. Som 4 SNppmgport PA 15077-0004 March 20, 1987 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Reference:

Beaver Valley Power Station Unit No.1 Docket NO. 50-334 License No. DPR-66 Semi-Annual Radioactive Effluent Release Report for the Second Six Months of 1986 Centlemen Under the Beaver Valley Power Station Unit No. 1 License DPR-66, and in accordance with the requirements of Specifications 6.9.1.12 and 6.9.1.13 of the Technical Specifications, this addendum to the Semi-Annual Radioactive Effluent Release Report is hereby submitted.

This addendum is issued to add the licensee initiated changes made to the Offsite Dose Calculation Manual (Issue 1, Revision 2) during the report period (See Attachment). These changes were inadvertantly omitted from the original report submitted to you by cover letter dated February 25, 1987.

A description of the changes incorporated on July 8,1986 are as follows:

1.

Provide a flow based monitor setpoint adjustment factor in ODCM Section 1.1.2.

This change makes ODCM Section 1.1.2 consistent with ODCM Section 1.1.1 and current procedures.

2.

Revise the 31-day dose projection limits and methodology in ODCM Sections 1.3.2, 2.3.1.2 and 2.3.2.2.

This change corrected the 31-day dose projection limits and changed the dose projection methodology to be consistent with proposed software.

50$h034 h

PDR

B cv r Velley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 Page Two 3.

Revise the ODCM Gaseous Effluent Monitor Setpoints in ODCM Sections 2.1.1 and 2.1.2.

They were revised due to pressure corrections determined for the detectors, changes in isotopic literature, and the addition of SPING Channel 5 alternate monitor data.

The calculations supporting this item are contained in Duquesne Light Company Internal Calculation Packages ERS-SFL-85-031 and ERS-ATL-86-008.

For information, the Unit 1 Offsite Dose Calculation Manual is currently being revised to reflect changes necessary for two unit operation.

For example, the rewrite will again revise the ODCM Gaseous Effluent Monitor Setpoints due to the BVPS-2-FSAR including revised source terms for BVPS-1 effluents (revised per PWR Gale Code; NUREG-0017).

Res ect.i l l y,

Carey Sr. Vice President Nuclear Group Attachment cc United States Nuclear Regulatory Commission (2)

Regional Administrator, Region 1 631 Park Avenue King of Prussia, PA 19406 United States Nuclear Regulatory Commission Resident Inspector Beaver Valley Power Station Dottie Sherman American Nuclear Insurers Library The Exchange Suite 245 270 Farmington Avenue Farmington, CT 06032 Thomas Gerusky Department of Environmental Resources Bureau of Radiation Protection l