ML20205H597
| ML20205H597 | |
| Person / Time | |
|---|---|
| Site: | Fort Saint Vrain |
| Issue date: | 08/15/1986 |
| From: | Warembourg D PUBLIC SERVICE CO. OF COLORADO |
| To: | Berkow H Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20205H603 | List: |
| References | |
| P-86522, TAC-62198, NUDOCS 8608200119 | |
| Download: ML20205H597 (2) | |
Text
O OPublic Service ~
Company of Colorado 2420 W. 26th Avenue, Suite 100D, Denver, Colorado 80211 August 15, 1986 Fort St. Vrain Unit No. 1 P-86522 Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D.C.
20555 Attention: Mr. H. N. Berkow, Director Standardization and Special Projects Directorate Docket No. 50-267
SUBJECT:
Fort St. Vrain Rod Position Instrumentation Integrated Systems Study
REFERENCE:
NRC Letter, Denton to Walker, dated 10/16/84 (G-84392)
Dear Mr. Berkow Attached please find the Fort St. Vrain Control Rod Position Instrumentation (RPI) integrated Systems Study (PSC document Engineering E*aluation EE-12-0013).
This study was specified as a long term action item in the referenced letter directed towards resolving unreliable performance of the RPI.
i As indicated in our report, we plan to install upgraded indication
(
instrumentation for a selected number of control rod pairs during the next refueling outage.
We will monitor the performance of the l
instrumentation and if results are favorable, an action plan will be developed fcr upgrading the control rod drive position indication equipment consistent with the overall control rod drive maintenance program.
l e60820011{$IOS$67 l
DR ADOC PDR
[
l spo
=_
P-86522 Page 2 August 15, 1986 If you have any questions on this subject, please contact Mr. M.H.
Holmesat(303)480-6960.
Very truly yours,
)0 W. lYkJq i
D. W. Warembout g, Marf6ger n
Nuclear Engineering Division DW/JV:jmt
Attachment:
EE-12-0013 Issue A I
f i
I
-,, - -., _ _ -,. _..... - -. -,.