ML20205H487

From kanterella
Jump to navigation Jump to search
Forwards Application for Amend to License NPF-3,revising Tech Spec Section 3/4.3.2.2,Table 3.3-13 Re Steam & Feedwater Rupture Control Sys Response Times & Bases Sections 3/4.3.1 & 3/4.3.2.Fee Paid
ML20205H487
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 03/23/1987
From: Shelton D
TOLEDO EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20205H491 List:
References
RTR-NUREG-1177 1354, NUDOCS 8704010073
Download: ML20205H487 (2)


Text

g q 4

TOLEDO EDISON Docket No. 50-346 DONALD C. SHELTON vo. w - a rmur teS1249 2399 License No. NPF-3 Serial No. 1354 March 23, 1987 United States Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:

Under separate cover, we are transmitting an application for an Amendment to Facility Operating License No. NPF-3 for the Davis-Besse Nuclear Power Station, Unit No. 1.

The attached application requests that the Davis-Besse Nuclear Power Station, Unit No. 1 Operating License, Appendix A, Technical Specifica-tions and Bases be revised to reflect the changes attached. The proposed changes involve Section 3/4.3.2.2, Table 3.3-13, Steam and Feedwater Rupture Control System Response Times, and Bases Sections 3/4.3.1 and 3/4.3.2, Reactor Protection System and Safety System Instrumentation.

The proposed changes, as discussed in the attached Safety Evaluation, are being submitted in accordance with Toledo Edison's commitment in its letter to the NRC, dated June 6, 1986 (Serial No. 1280) to propose, not later than 90 days after restart, an amendment to the Technical Specific-ations requiring a turbine stop valve closure time of no greater than one second.

This commitment was also included in the NRC's Safety Evaluation Report Related to the Restart of Davis-Besse Nuclear Power Station, Unit No. 1, Following the Event of June 9, 1985, NUREG-1177 and License Action Commitments, Commitment No. 41 (Log No. 2062).

Toledo Edison requests that this amendment be approved and issued by '

September 30, 1987. This change is to be effective 30 days after issuance of the License Amendment. i lL i l 4p5 [ 6

,ol 8704010073 870323 PDR d ADOCK 05000346 I P PDR I THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MAOISON AVENUE TOLEDO. OHIO 43652 x

Docket No. 50-346 License No. NPF-3 Serial ~No. 1354 Page 2 Enclosed is a check for $150 as required by 10CFR170.12(c) for a license amendment application.

Very truly ours,-

DCS:KCP: CAB:p1f Attachments cc: DB-1 NRC Resident Inspector A. B. Davis, Acting Regional Administrator (2 copies)

State of Ohio A. W. DeAgazio, NRC/NRR Davis-Besse Project Manager l

l l

i

- ._- ._. -_ _ - - _ ,