ML20205G827

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Rev 2 to Emergency Plan Implementing Procedure EPIP 1.3, Offsite Agency Notification
ML20205G827
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 07/30/1986
From: Britt R
WISCONSIN ELECTRIC POWER CO.
To: Harold Denton, Lear G
Office of Nuclear Reactor Regulation
Shared Package
ML20205G831 List:
References
NUDOCS 8608190631
Download: ML20205G827 (1)


Text

-

t s .

l Wisconsin Electnc rom couem ,

231 W. MICHIGAN, P.O. BOX 2046, MILWAUKEE, WI 53201

  • July 30, 1986 .

Mr. H. R. Denton, Director -

Office of Nuclear Reactor Regulation U. S. NUCLEAR REGULATORY COMMISSION Washington, DC 20555 Attention: Mr.~G. Lear, Project Director PWR Project Directorate No. 1 Gentlemen:

EMERGENCY PLAN IMPLEMENTING PROCEDURES TELEPHONE NUMBERS DELETED FROM EPIP 1.3 In our recent distribution of revisions to the Point Beach Nuclear Plant Emergency Plan Implementing Procedures (letter dated June 27, 1986) we neglected to include copies of the procedures with phone numbers deleted.

Please replace your copies of EPIP 1.3 (Revision 2) with the enclosed copy marked "NRC ONLY, Not For Public Disclosure."

The unmarked copies enclosed have names and telephone numbers ,

deleted and are provided to facilitate your distribution to public document rooms.

Very truly yours, k .'[' , d '

N

/

R. W. Britt President Enclosure cc: NRC Resident Inspector Incident Response Center, Region III ,

i

)

ee - _- n e u nnnnnmas PDR F

ADOCK 05000266 PDR ,

r l