ML20205G352

From kanterella
Jump to navigation Jump to search
Ack Receipt of Re Changes to Emergency Plan. Proposed Changes Acceptable
ML20205G352
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 03/26/1987
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Campbell G
ARKANSAS POWER & LIGHT CO.
References
NUDOCS 8703310437
Download: ML20205G352 (2)


Text

_

MAR 2 61987 In Reply Refer To:

Dockets:

50-313 50-368 Arkansas Power & Light Company ATTN: Mr. Gene Campbell Vice President, Nuclear Operations P. O. Box 551 Little Rock, Arkansas 72203 Gentlemen:

This letter is to acknowledge the receipt and review of changes to your emergency plan that were sent to this office by letter dated January 16, 1987.

The revisions to your plan were reviewed by our emergency preparedness staff and the proposed changes to the emergency plan appear to be acceptable.

If you have any further questions or comments, please contact Mr. Nemen M. Terc (817) 860-8129.

Sincerely Original Signed Dy E. H. Jchnwn J. E. Gagliardo, Chief Reactor Projects Branch cc:

J. M. Levine, Director Site Nuclear Operations Arkansas Nuclear One P. O. Box 608 Russellville, Arkansas 72801 Arkansas Radiation Control Program Director bec: (see next page)

_IV:Ek C:EP&Sb.

3/p/fSP!l87 [

L _ 7 j.:,sh.,

g3)/g/87sC:RE' R

a C R&SPB C PB/B AI 87-036

.,do

$/p/87

/a4/87 3 /a,8/87

$E'9A808N85888l;a f

8

o Arkansas Power and Light bec to DMB (A045) bec distrib. by RIV:

RPB Resident Inspector l

R. D. Martin, RA R&SPB Section Chief (RPB/B)

D. Weiss, RM/ALF RIV File l

DRSP RSB i

MIS SYSTEM RITS Operator Inspector Section Chief W. L. Fisher l

R. L. Bangart l

R. E. Hall l

Project Inspector, RPB l

D, B. Matthews, IE i

N. R. Gardner l

-