GPU Nuclear UQ Qf 100 Interpace Parkway Parsippany, New Jersey 07054 201 263-6500 TELEX 136-482 March 20, 1987 Writer's Direct Dial Number:
U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555
Dear Sirs:
Subject:
Oyster Creek Nuclear Generating Station Docket No. 50-219 Request for Postponement of Regulatory Effectiveness Review The Oyster Creek Nuclear Generating Station is currently scheduled for a visit by the " Regulatory Effectiveness Review Team" (RER) in May of this year.
The Oyster Creek Station is presently addressing two long standing security issues and it is our conclusion that a more meaningful review of the station's security effectiveness would result after these two issues are resolved.
This matter has been discussed between M. Laggart of our Licensing staff and J.
Donohew and R. Keimig of the NRC staff.
As a result of the discussions with your staff members, additional information was requested and is provided in this response.
The first security issue needing resolution is the upgrade of the Protected Area Intrusion Detection System. This project is currently on schedule.
Final installation and testing is currently scheduled for the first quarter of 1988. Attached is a milestone schedule of this project. As discussed with your staff, we will formally resubmit this schedule if milestones are missed and/or the schedule slips. We have also agreed to notify your staff if there is any change in the types of detection systems that will be utilized in the upgrade project.
The other issue nearing resolution is the degree of compliance of the Oyster Creek Nuclear Generating Station with 10CFR73.55(c)(6) which states "The walls, doors, ceiling, floor, and any windows in the walls and in the doors of the reactor control room shall be bullet-resisting."
It is our conclusion that a technically adequate alternative solution has been developed to address this issue. This solution was discussed with Mr. J. Donohew during his visit to Oyster Creek in February 1987. A formal submittal will be made to the NRC by May 30,1987, requesting approval of our proposed solution.
8703310431 B7032o DR ADOCK 05000219 I
PDR j
GPU Nuclear is a part of the General Pubhc Utilities System
b l
. J 4
It is our opinion that the resolution of these issues will significantly enhance the security at Oyster Creek and more meaningful RER team review j
will result. We therefore request that the RER team visit be postponed until after the first quarter of 1988.
i Very truly yours, i
,e R. P. Fasulo Vice President & Director
]
Administration RPF:MH: dam Attachment (0268A) cc: Mr. Jack N. Donohew, Jr.
U.S. Nuclear Regulatory Commission 7920 Norfolk Avenue, Phillips Bldg.
Bethesda, MD-20014 Mail Stop No. 314 lI i
Mr. R. R. Keimig Region I j
U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406 Dr. Thomas E. Murley, Administrator (2 copies)
Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406 l
J
[
t e
I
ATTACHMENT I PROTECTED AREA INTRUSION DETECTION SYSTEM UPGRADE MILESTONE SCHEDULE March 1987 Preliminary Engineering Design Review (PEDR)
June 1987 Operability, Maintainability, Constructability Review (0MCR)
July 1987 Release for Construction August 1987 Start of Construction 1st Quarter-1988 Completion, Test and Turnover
.+
-