ML20205G073

From kanterella
Jump to navigation Jump to search
Notifies of 860819 Working Meeting Between IE & Util Readiness Review Personnel in Philadelphia,Pa to Provide Opportunity for NRC to Interview Team Members Reviewing Civil/Structural Design Module E3-02
ML20205G073
Person / Time
Site: Satsop
Issue date: 08/06/1986
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
GO3-86-433, NUDOCS 8608190396
Download: ML20205G073 (3)


Text

7 h)

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968

  • 3000 George \\\\'ashington \\\\'ay
  • Richland, \\t'ashington 99352 m S

R M

a 76 8 4

eg s

!2 e

^*

,. =:

Docket No. 50-508 g

August 6, 1986 G03-86-433 Mr. J. B. Martin Regional Administrator U. S. Nuclear Regulatory Commission Region V 1450 Maria Lane, Suite 210 Walnut Creek, California 94596

Dear Mr. Martin:

Subject:

I&E/ SUPPLY SYSTEM WNP-3 READINESS REVIEW MEETING This letter is to advise you that a working meeting between I&E and Supply System WNP-3 Readiness Review personnel has been scheduled for August 19, 1986, at 10:00 a.m. at the offices of United Engineers and Constructors, Inc.

at 30 S.17th St., Philadelphia, PA.

The purpose of the meeting is to provide an opportunity for the NRC to interview the Team members of the WNP-3 Civil / Structural Design Review Module (E3-02), and to receive comments from the NRC on preliminary civil / structural review checklists previously provided to ISE for information.

Participants representing the Supply System will include:

George A. Block Supply System Manager, Engr. Assurance Navroze D. Amaria UE&C Review Team Leader Noshir C. Karanjia UE&C Review Team Member Joseph J. Ucciferro UE&C Review Team Consultant (Mr. Tarlok S. Hundal (UE&C), also a Review Team member, will not attend this meeting; however a copy of his resume will be available for inspection, and an opportunity to interview him will be provided at a later date.)

bh kB DO l

hLLO\\

i

JB Martin IAE/ Supply System WNP-2 Readiness Review Meeting Page 2 Please advise George Block at (509)372-5181 s'lould you or a representative of Region V plan to attend.

We understand that this meeting will provide the basis for a portion of an I&E Inspection Report.

Should you have any connents or questions, or desire further detail, please contact Mr. Block.

Very truly yours, lC rw G. C. Sorensen, Manager Regulatory Programs cc: See next page.

s cc: Mr. J. A. Adams, NESCO Mr. G. T. Ankrum, Nuclear Regulatory Commission Ms. N. Bell, Nuclear Information & Resource Services Mr. T. W. Bishop, O'Brien-Kreitzberg & Associates, Inc.

j Mr. R. B. Boucher, Pacific Power & Light Company Mr. E. W. Brach, Nuclear Regulatory Commission Mr. W. L. Bryan, Washington Water Power Company Mr. S. H. Bush, Ph.D., Review & Synthesis Associates Mr. H. R. Denton, Nuclear Regulatory Connission Mr. C. Eschels, EFSEC Chairman Mr. R. F. Heishman, Nuclear Regulatory Commission Mr. W. M. Hill, Nuclear Regulatory Commission Mr. G. W. Knighton, Nuclear Regulatory Comraission Mr. R. V. Laney, Consultant Mr. G. Dick, Nuclear Regulatory Commission Mr. E. V. Imbro, Nuclear Regulatory Commission Mr. F. J. Miraglia, Nuclear Regulatory Connission 1

Mr. W. J. Finnegan, Puget Sound Power & Light Company Mr. N. S. Reynolds (Bishop, Liberman, Cook, Purcell & Reynolds)

Mr. E. Rosolie, Director of Coalition for Safe Power Mr. B. K. Singh, Nuclear Regulatory Commission Mr. D. Smithpeter, Bonneville Power Administration Mr. J. M. Taylor, Nuclear Regulatory Commission Mr. D. Williams, Bonneville Power Administration Mr. B. C. Withers, Portland General Electric Company Document Control Desk - U.S. NRC 1

i i

f 4

i f

~

,