Text
-
.
MAR 2 31987
Docket No.
50-29
License No. OPR-3
Yankee Atomic Electric Company
ATTN: Mr. L. H. Heider
Vice President of Operations
1671 Worcester Road
Framingham, Massachusetts 01701
Gentlemen:
Subject:
Inspection No. 50-029/87-01
This letter refers to the special inspection conducted by Mr. A. Varela of this
office on January 27-30, 1987 at Yankee Nuclear Power Station. Mr. Varela
discussed the findings of the inspection with Mr. J. DeVincentis at the
conclusion of the inspection.
Subsequent telephone discussions occurred
between A. Varela and B. Holmgren on February 6 and J. R. Strosnider and L.
Heider on February 19, 1987.
Areas examined during this inspection are described in the NRC Region I
Inspection Report which is enclosed with this letter. Within these areas, the
inspection consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspector.
Based on the results of this inspection, it appears that one of your activities
was not conducted in full compliance with NRC requirements, as set forth in the
Notice of Violation, enclosed herewith as Appendix A.
This violation has been
categorized by severity level in accordance with the " General Statement of
Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C
(Enforcement Policy). You are required to respond to this letter and in
preparing your response, you should follow the instructions in Appendix A.
The responses directed by this letter and the accompanying Notice are not
subject to the clearance procedures of the Office of Management and Budget
as required by the Paperwork Reduction Act of 1980, PL 96-511.
Your cooperation with us in this matter is appreciated.
Sincerely,
C r k ' ' 1 " 91 E' 8
Jacq1.s P. D rt
0703310300 G70323
ADOCK 05000029
[V.
,
O
Stewart D. Ebneter, Director
o
Olvision of Reactor Safety g-
g ,
& 0s
I
Enclosures:
'
1.
Appendix A, Notice of Violation
th
2.
NRC Region I Inspection Report No. 50-029/S7-01
\\
OFFICIAL RECORD COPY
IR YR 87-01 - 0001.0.0
03/18/87
-
-
- -
-
-
-
-
-
- -
-
-
__
-
o
Yankee Atomic Electric Company
2
cc w/ encl:
N. N. St. Laurent, Plant Superintendent
J. E. Tribble, President
G. J. Papanic, Jr. , Senior Project Engineer - Licensing
Public Document Room (PDR)
local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
'
NRC Resident Inspector
Commonwealth of Massachusetts (2)
bec w/ encl:
Region I Docket Room (with concurrences)
Management Assistant, ORMA (w/o encl)
ORP Section Chief
M. McBride, RI, Pilgrim
W. Raymond, SRI, Vermont Yankee
J. Clifford, LPM, NRR
Robert J. Bores, DRSS
J. Strosnider, ORP
A. Varela, DRP
i
.
C
C
pv
L
<
RI:0RS
RI:0RS
RI:DRS
V
1 ca
Strosnider
Ourr
03//f/87
03//'l/87
03//'f/87
0FFICIAL RECORD COPY
IR YR 87-01 - 0002.0.0
03/18/87
.
w
y
.m---.,-v---->
- . - , . . - ,
-.--,---,--.-w
- - - - . .
-w--
-y--y,_m-m,-,
--e,
g-
- . - ---- - - - - - -
-r--
, -