Responds to Violations Noted in Insp Repts 50-295/85-05 & 50-304/85-05.Corrective Actions:Agreements Re Performance of Control Room Ductwork Leakage Test Reached During 860204 Telcon.Procedure Encl
ML20205F791
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 07/25/1986
From: Leblond P
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20205F796 List:
References
1903K, NUDOCS 8608190328
Download: ML20205F791 (1)


Text

'

. /

') Commonwealth Edison E

~ 7 , 4 One First National Plaza, Chicago, Illinois

\Nd Chicago, Ulinois 60690 - 0767 "7_ / Address Reply to: Post Offic2 Box 767 July 25, 1986 Mr. James G. Keppler Regional Administrator U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137

Subject:

Zion Nuclear Power Station Units 1 and 2 Response to I&E Inspection Report Nos.

50-295/85-005 and 50-304/85-005 NRC Docket Nos. 50-295 and 50-304

Reference:

March 6, 1986 letter from W. D. Shafer to Cordell Reed.

Dear Mr. Keppler:

The referenced letter confirmed the results of a conference call held on February 4, 1986 with representatives of NRR, Region III, and Commonwealth Edison Company. In addition to reaching agreement cn the performance of a leakage test of the control room ductwork, Commonwealth Edison Company committed to providing NRC with a copy of the test procedure.

This procedure is enclosed with this letter.

The currently scheduled time period for the test's performance is during the middle of August. The specific date will be finalized.through this office in the near future.

If any further questions arise concerning this matter, please contact this office.

Very truly yours,

\p P. C. LeBlond Nuclear Licensing Administrator i 1 l 1m Enclosure cc: NRC Resident Inspector - Zion C. F. Gill - Region III J. J. Hayes - NRR J. A. Norris - NRR 8608190328 860725 PDR 1903K G ADOCK 05000295 PDR

_ _ _ _ _ _ _ _