Forwards Insp Rept 50-424/85-31 on 850722-26 & 0805-09.NRC Completed Detailed Review,Insp & Verification of App I Re QA Organization.Commitments,Program & Implementation Acceptable
ML20205F311
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 10/25/1985
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Kelly R
GEORGIA POWER CO.
Shared Package
ML20205F316 List:
References
NUDOCS 8511050312
Download: ML20205F311 (4)


See also: IR 05000424/1985031

Text

y9,(lo

~

D

.

,

.

October 25, 1985

Georgia Power Company

ATN: Mr. R. J. Kelly

Executive Vice President

P. O. Box 4545

Atlanta, GA 30302

Gentlemen:

SUBJECT:

NRC REVIEW OF V0GTLE READINESS REVIEW PROGRAM, APPENDIX I, PROJECT

QUALITY ASSURANCE ORGANIZATION - REPORT N0. 50-424/85-31

The NRC has completed a detailed review, inspection and verification of the

subject appendix which was submitted to the NRC on May 24, 1985.

Inspections

were conducted at the Vogtle site and our findings were discussed with members of

your staff at the conclusion of these. inspections.

Areas contained in the appendix which were reviewed, examined, and verified are

identified in the enclosed report.

Within these areas, the inspection and

verification consisted of selected examinations of procedures and representative

records, discussions with personnel, observations of activities in progress, and

review of your licensing commitments.

The results of Appendix I reviews and inspections are categorized in the enclosed

report as deficiencies or unresolved items.

Your attention is invited to these

matters which will be pursued during future licensing reviews and inspections.

Based on the NRC review and inspections of these activities identified in the

appendix, we have determined that your commitments, program, and implementation

are acceptable with the exceptions of those items or areas identified in the

report summary.

This decision was based upon information currently available to

the inspectors and reviewers.

Should information subsequently become available

which was not considered during this review or which conflicts with earlier

information, it will be evaluated to determine what effects it may have on the

above conclusion.

Should you have any questions concerning this letter, please contact us.

Sincerely,

(Original signed by JA01shinski for/)

J. Nelson Grace

Regional Administrator

Enclosure:

Report No. 50-424/85-31

cc w/ encl:

(See page 2)

8511050312 851025

PDR

ADOCK 05000424

I

G

PDR

e t

.rEcl

f

.

.

o

.

Georgia Power Company

2

October 25, 1985

cc w/ encl:

f.E.Conway,SeniorVicePresident

Nuclear Power

f.O. Foster,VicePresident.

and General Manager Vogtle Project

p)f. H. Gregory, III, General

Manager, Vogtle Nuclear Construction

f.Bockhold,Jr.,Vogtle

Plant Manager-

'

y T. Gucwa, Chief

Nuclear Engineer

gbleA. Thomas,

Vice President-Licensing Vogtle

Project

4 d Groover, Quality

Assurance Site Manager

tA".-W. Hayes, QA Manager

p#. T. Beckham, Vice President

& General Manager - Operations

A.A. Bailey,ProjectLicensing

Manager

George F. Trowbridge, Esq.

p

Shaw, Pittman, Potts and Trowbridge

vilruceW. Churchill,Esq.

Shaw, Pittman, Potts and Trowbridge

tgrnest L. Blake, Jr., Esq.

- Jhaw, Pittman, Potts and Trowbridge

. (ames E. Joiner, Troutman, Sanders,

Lockerman and Ashmore

games G. Ledbetter, Comissioner

Department of Human Resources

JharlesH. Badger,Officeof

Planning and Budget, Management

'

Review Division

gppishKirkland,III, Counsel

Office of the Consumer's Utility

Council

A glas C. Teper, Georgians Against

Nuclear Energy

_L>aurie Fowler, Esq., Legal Environmental

. Assistance Foundation

uT1.i Johnson, Executive Director

6ducational Campaign for a Prosperous

'

. Gaorcia

.#rtor d. Margulies, Esq., Chairman

M,nicistrative Judge, Atomic Safety

and !icensing Board Panel

v6r. Oscar H. Paris, Administrative Judge

Atomic Safety and Licensing Board Panel

6Estave A.-Linenberger, Jr., Administrative

y

Judge, Atomic Safety and Licensing Board

panel

drillie P. Garde, Citizens Clinic

Director, Government Accountability Project

bcc w/ encl: (See page 3)

1

r~

-

,

..

..

-

.

.

Georgia Power Company

3

October 25, 1985

bec w/ encl:-

A Reis, ELD'

M. Sinkule, RII

-pCResidentInspector

Document Control Desk

State of Georgia

,

  • SEE PREVIOUS C0hCURRENCE PAGE

-

RII

RII

RII

RII

RII

. * LHJackson:pph * RWWright

  • GABelisle
  • CAJulian

AFGibson

WHRankin

,

10/ /85

10/ /85

10/ /85

10/ /85

10M/85

10/23/85

RII

RII

RI:

R

IE

RII

.

g

)

MVSinkule-

VLBrownlee

RDWalker

JA

inski

HThompson

BGrimes

10/p/85

10/tN85

10/p/85

10

/85

10/rA/85

10/24/85

'

.

b-

..

.

..

. Georgia Power Company

3

-bcc w/ encl:

E. Reis, ELD

M. Sinkule, RII

NRC Resident Inspector

Document Control Desk

State of Georgia

,

,

.

{,

RII

RII

RII

RI

RII

RII

ddo/v .

Fad /v

(-dt

LHJackson:pph RWright

GABelisle

CAulian

AFGibson

WHRankin

10///f/85.-

10//+ /85 -

10//4/85

10//f/85

10/ /85

10/ /85

9

RII

RII~

RII

RII

.NRR-

IE

~

MVSinkule

VLBrownlee

R0 Walker

JA01shinski

HThompson

BGrimes

10/ /,85

10/ /85

10/ /85

10/ /85

10/ /85-

10/ /85'

.

.

.