October 25, 1985
Georgia Power Company
ATN: Mr. R. J. Kelly
Executive Vice President
P. O. Box 4545
Atlanta, GA 30302
Gentlemen:
SUBJECT:
NRC REVIEW OF V0GTLE READINESS REVIEW PROGRAM, APPENDIX I, PROJECT
QUALITY ASSURANCE ORGANIZATION - REPORT N0. 50-424/85-31
The NRC has completed a detailed review, inspection and verification of the
subject appendix which was submitted to the NRC on May 24, 1985.
Inspections
were conducted at the Vogtle site and our findings were discussed with members of
your staff at the conclusion of these. inspections.
Areas contained in the appendix which were reviewed, examined, and verified are
identified in the enclosed report.
Within these areas, the inspection and
verification consisted of selected examinations of procedures and representative
records, discussions with personnel, observations of activities in progress, and
review of your licensing commitments.
The results of Appendix I reviews and inspections are categorized in the enclosed
report as deficiencies or unresolved items.
Your attention is invited to these
matters which will be pursued during future licensing reviews and inspections.
Based on the NRC review and inspections of these activities identified in the
appendix, we have determined that your commitments, program, and implementation
are acceptable with the exceptions of those items or areas identified in the
report summary.
This decision was based upon information currently available to
the inspectors and reviewers.
Should information subsequently become available
which was not considered during this review or which conflicts with earlier
information, it will be evaluated to determine what effects it may have on the
above conclusion.
Should you have any questions concerning this letter, please contact us.
Sincerely,
(Original signed by JA01shinski for/)
J. Nelson Grace
Regional Administrator
Enclosure:
Report No. 50-424/85-31
cc w/ encl:
(See page 2)
8511050312 851025
ADOCK 05000424
I
G
e t
.rEcl
f
.
.
o
.
Georgia Power Company
2
October 25, 1985
cc w/ encl:
f.E.Conway,SeniorVicePresident
Nuclear Power
f.O. Foster,VicePresident.
and General Manager Vogtle Project
p)f. H. Gregory, III, General
Manager, Vogtle Nuclear Construction
f.Bockhold,Jr.,Vogtle
Plant Manager-
'
y T. Gucwa, Chief
Nuclear Engineer
gbleA. Thomas,
Vice President-Licensing Vogtle
Project
4 d Groover, Quality
Assurance Site Manager
tA".-W. Hayes, QA Manager
p#. T. Beckham, Vice President
& General Manager - Operations
A.A. Bailey,ProjectLicensing
Manager
George F. Trowbridge, Esq.
p
Shaw, Pittman, Potts and Trowbridge
vilruceW. Churchill,Esq.
Shaw, Pittman, Potts and Trowbridge
tgrnest L. Blake, Jr., Esq.
- Jhaw, Pittman, Potts and Trowbridge
. (ames E. Joiner, Troutman, Sanders,
Lockerman and Ashmore
games G. Ledbetter, Comissioner
Department of Human Resources
JharlesH. Badger,Officeof
Planning and Budget, Management
'
Review Division
gppishKirkland,III, Counsel
Office of the Consumer's Utility
Council
A glas C. Teper, Georgians Against
Nuclear Energy
_L>aurie Fowler, Esq., Legal Environmental
. Assistance Foundation
uT1.i Johnson, Executive Director
6ducational Campaign for a Prosperous
'
. Gaorcia
- .#rtor d. Margulies, Esq., Chairman
M,nicistrative Judge, Atomic Safety
and !icensing Board Panel
v6r. Oscar H. Paris, Administrative Judge
Atomic Safety and Licensing Board Panel
6Estave A.-Linenberger, Jr., Administrative
y
Judge, Atomic Safety and Licensing Board
panel
drillie P. Garde, Citizens Clinic
Director, Government Accountability Project
bcc w/ encl: (See page 3)
1
r~
-
,
..
..
-
.
.
Georgia Power Company
3
October 25, 1985
bec w/ encl:-
A Reis, ELD'
M. Sinkule, RII
-pCResidentInspector
Document Control Desk
State of Georgia
,
- SEE PREVIOUS C0hCURRENCE PAGE
-
RII
RII
RII
RII
RII
. * LHJackson:pph * RWWright
- GABelisle
- CAJulian
AFGibson
WHRankin
,
10/ /85
10/ /85
10/ /85
10/ /85
10M/85
10/23/85
RII
RII
RI:
R
RII
.
g
)
MVSinkule-
VLBrownlee
RDWalker
JA
inski
HThompson
BGrimes
10/p/85
10/tN85
10/p/85
10
/85
10/rA/85
10/24/85
'
.
b-
..
.
..
. Georgia Power Company
3
-bcc w/ encl:
E. Reis, ELD
M. Sinkule, RII
NRC Resident Inspector
Document Control Desk
State of Georgia
,
,
.
{,
RII
RII
RII
RI
RII
RII
ddo/v .
Fad /v
(-dt
LHJackson:pph RWright
GABelisle
CAulian
AFGibson
WHRankin
10///f/85.-
10//+ /85 -
10//4/85
10//f/85
10/ /85
10/ /85
9
RII
RII~
RII
RII
.NRR-
~
MVSinkule
VLBrownlee
R0 Walker
JA01shinski
HThompson
BGrimes
10/ /,85
10/ /85
10/ /85
10/ /85
10/ /85-
10/ /85'
.
.
.