f[go c:x.
'h UNITED STATES G
+
i NUCLEAR REGULATORY COMMISSION 3m q.
W ASHINGTO N. D. C. 20655 a
October 20, 1988 Cocket Nos.
50-321 50-3 Mr. W. G. Hairston, I!!
Sentur Vice Presidert - Nuclear Operations Georgia Power Company P.O. Box 4545 Atlanta, Georgia 30302
Dear Mr. Hairston:
SUBJECT:
EMERGENCY PLAN REQUIREMENTS FOR AFTER-HOURS EXERCISE, PLANT HATCH Your letter of September 6, 1988 noted that the Hatch Emergency Plan requires that two after-hours exercises be conducted during a five-year period, and that one of these after-hours exercises was due to be conducted in 1988. You also informed us that the Georgia Emergency Management Rency (GEMA) is required co participate in an af ter-hours exercise for which an eYaluation by the Federal Emergancy Management Agency (FE!!A) is required. The FEMA evaluation of the GEMA participation is not scheduled until 1989.
Accordirgly, you requested an exemption from the Hatch Emergency Plan requirement of conductir.g an ofter-hours exercise until 1989, so that the one exercise could be used to satisfy both the Plant Hatch and the GEMA requirements.
Since the requirement for the after-hours exercise is not set by regulation, an eremption from the requirement is not needed.
Rather, allowing the exerrii;c to be conducted in 1989 instead of 1988 would constitute an exception to the commitment in the Hatch Emergency Plan which was previously accepted by the st4ff. The appropriate relief thus is an exception to /our cetmitment instead of an igemption.
Our latest information indicates that the annual emergency exercise for Phn*,
Hatch for 1988 is scheduled to be conducted on November 16, 1988. We fthd yov request to conduct on af ter-hours exercise in l989 rather than 1988, in order to coordinate with GEhA, to be acceptable and consistent with the energency planning oujective of integrating onsite and of fsite response capabilities.
1 e
GS1027o433 AJ1020 f
ADOCK 05000121 PT C
\\\\0
W. G. Heirston, III October 20, 1988 l
t Accordingly, an exception is grented to the cosunitmnt in the Hatch Emergency Plan to conduct an after-hours exercise in-1988, with the understanding that such an exercise will be conducted in 1989.
Please advise us of the schedule
[
for the 1989 exercise, when known.
i j
Please contact ne if you have any questions regarding this matter.
I S ncerely.
[
u M4A l
Lawrence P. Crocker, Project M4 nager Project Directurate !!-3 i
j Division of Reactor Projects I/11
[
I i
cc: See next page t
f l
t i
i I
I i
l L
l 1
t i
I i
I
)
i 4
j i
l d
l f
e 1
s W. C. Hairston, 111 October 20, 1988 Accordingly, an exception is granted to the commitsient in the Hatch Emergency Plan to conduct an after-hours exercise in 1988, with the understanding that such an exercise will be conducted in 1989.
Please advise us of the schedule for the 1989 exercise, when known.
Please contact me if you have any questions regarding this matter.
Sincerely, octetani.n peabri Lawrence P. Crocker, Project Manager Project Directorate 11-3 Division of Reactor Projects I/II cc: See next page
_ DISTRIBUTION:
DoctSt file T. Decker, R!l NRC PDR Local PDR PDIl-3 Reading S. Varga 14-E-4 G. Lainos 14-H-3 D. Matthews 14-H-25 H. Rood 14-H-25 Project Manager 14-H-25 OGC 15-B-18 E. Jordsn HNBB-3302 B. Grines 9-A-2 ACRS(10)
H-1016 Hatch Plant file i
WTravers PDIJ-y F511-3 PEP RG'NII Opb!!-3 8Rdld LCrocker:Is WT s
TDecker DHatthews 10////88 10//Nd8 10/j)/8d 10/.h/88 10/qt/88 l
WpuJ T
n,e/
N** p Mjl&*
p, 4
g
/4
',k e
y
)
Mr. W. G. Hairston, !!!
Edwin I. Hatch Nuclear Plant, Georgis Power Company Units Nos. I and 2 i
cc:
G. F. Trowbridge, Esq.
Hr. R. P. Mcdonald Shaw, Pittman, Potts and Trowbridge Executive Vice President -
2300 N Street, N. W.
Nuclear Operations Washington, D.C.
20037 Georgia Power Company t
P.O. Box 4545 Mr. L. T. Gucwa Atlanta, Georgia 30302 i
Engineering Department i
Georgia Power Company P. O. Box 4545 i
Atlanta, Georgia 30302 Nuclear Safety and Compliance Manager Edwin !. Hatch Nuclear Plent Georgia Power Company
[
P. O. Box 442 i
Baxlvy, Georgia 31513
]
Mr. Louis B. Long Southern' Company Services, Inc.
P. O. Box 2625 i
Birmingham, Alabama 35202 f
Resident Inspector U.S. Nuclear Regulatory Comission Route 1. Box 725 Baxley, Georgia 31513 Regional Administrator, Region !!
U.S. Nuclear Regulatory Comission 101 Marietta Street, Suite 2900 Atlanta, Georige 30323 Mr. Charles H. Badger Office of Platning and Budget Room 610 270 Washington Street, S.W.
Atlanta, Georgia 30334 Mr. J. Leonard Ledbetter, Comissioner Departswnt of Natural Resources 270 Washington Street, N.W.
Atlanta, Georgta 30334 Chairsion Appling County Comisstoners County Courthouse Baxley, Georgia 31513 O