b' c.
gsuun "sPo
~
SACRAMENTO MUNICIPAL UTluTY DISTRICT O P. o. Box 15830, Sacramento CA 95852-1830,(916) 452-3211 AN ELECTRIC SYSTEM SERVING TQH T F CALIFORNIA M 10: 33 JEW 87-374
'D/Q March 16, 1987 J.
B. Martin, Regional Administrator U.S. Nuclear Regulatory Commission Region V, Office of Inspection & Enforcement 1450 Maria Lane, Suite 210 Walnut Creek, CA 94596 Docket No. 50-312 Rancho Seco Nuclear Generating Station License No. DPR-54 SPECIAL REPORT NO. 87-03, FIRE PROTECTION SYSTEM INOPERABLE IN ZONES 81, 82, AND 84
Dear Mr. Martin:
The Sacramento Municipal Utility District hereby submits Special Report No. 87-03 in accordance with Technical Specifications, Section 3.14 and 6.9.5.E.
During Cold Shutdown conditions on February 6, 1987, at 11:00 AM, the fire loop was isolated between PIV-27 and PIV-29 because of a suspected leak in the system piping at a flango connection to hydrant 26.
That deficiency affected the following fire protection sub-systems:
1)
Fire loop piping 99020-10-HE3 between PIV-27 and PIV-29.
The fire loop piping remained out-of-service for greater than the seven days specified in Technical Specification Section 3.14.2.
2)
Firo Hydrant 26 This hydrant was out-of-service for greator than the 14 days specified in Technical Specification SecCion 3.14.5.
3)
Zone 81, 82 and 84 Suppression These water suppression sub-systems were out-of-service for greator than the 14 days specified in Technical Specification Section 3.14.3.
0703300607 070316 PDH ADOCK 0D000312 1
N 1 0 G
PDH
\\
RANCHO SECO NUCLEAR GENERATING STATION ! 14440 Twin Cities Road, Herald, CA 95038 9799;(209) 333 2035
_k J.
B. Martin March 16, 1987 Work Request No. 118428 was initiated on February 6, 1987 to repair the leaking pipe.
That work request was completed and the sub-systems listed above were returned to service on March 11, 1987.
Compensatory measures to establish fire watches and lay-out hoses were performed in accordance with Section 3.14.3 and 3.14.5 of the Technical Specifications for each of the above listed fire protection sub-systems between February 6, 1987, and March 11, 1987.
If there are any questions concerning this report, please contact Mr. Ron W. Colombo at (916) 452-3211, extension 4236.
Sincerely,
/
w
~
I(r' 29
. Ward Deputy General Manag r, Nuclear Attachment cct A. D'Angelo S. Miner INPO
,