Monthly Operating Rept for Jul 1986
ML20205E184
Person / Time
Site: Salem PSEG icon.png
Issue date: 07/31/1986
From: White P, Zupko J
Public Service Enterprise Group
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
NUDOCS 8608180262
Download: ML20205E184 (10)


Text

.-

AVERAGE DAILY UNIT POWER LEVEL Docket No.

50-272 Unit Name Salem # 1 Date August 10,1986 Completed by Pell White Telephone 609-935-6000 Extension 4451 Month July 1986 Day Average Daily Power Level Day Average Daily Power Level (MWe-NET)

(MWe-NET) 1 1016 17 1115 2

1002 18 1102 3

997 19 1076 4

1008 20 1050 5

1002 21 721 6

986 22 0

7 1014 23 0

8 1000 24 0

9 1025 25 0

10 987 26 0

11 1074 27 0

12 1148 28 394 13 1100 29 1069 14 1115 30 1084 15 1114 31 1089 l

_1_6 1112 l

P. 8.1-7 R1 l

8608180262 860731 yh#

FDR ADOCK 05000272 R

PDR t

l OPERATING DATA REPORT Docket No.50-272 Date August 10,1986 Telephone 935-6000 Completed by Pell White Extension 4451 Operating Status 1.

Unit Name Salem No. 1 Notes 2.-

Reporting Period July 1986 3.

Licensed Thermal Power (MWt) 3411 4.

Nameplate Rating (Gross MWe) 1170 5.

Design Electrical Rating (Net MWe) 1115 6.

Maximum Dependable Capacity (Gross MWe)1149 7.

Maximum Dependable Capacity (Net MWe) 1106 8.

If Changes Occur in Capacity Ratings (items 3 through 7) since Last Report, Give Reason Upgraded Output to equal Unit #2 9.

Power Level to Which Restricted, if any (Net MWe)

N/A

10. Reasons for Restrictions, if any N/A This Month Year to Date Cumulative
11. Hours in Reporting Period 744 5087 79656
12. No. of Hrs. Reactor was Critical 595.4 3741.7 47927.1
13. Reactor Reserve Shutdown Hrs.

0 0

3088.4

14. Hours Generator On-Line 589.0 3585.1 46089.9
15. Unit Reserve Shutdown Hours 0

0 0

16. Gross Thermal Energy Generated (MHW) 1897838 11221037 141705066
17. Gross Elec. Energy Generated (MWH) 63.3030 3715970 47011980
18. Net Elec. Energy Generated (MWH) 603687 3538662 44644154
19. Unit Service Factor 79.2 70.5 57.9
20. Unit Availability Factor 79.2 70.5 57.9
21. Unit Capacity Factor (using MDC Net) 73.4 62.9 50.7
22. Unit Capacity Factor (using DER Net) 72.8 62.4 50.3
23. Unit Forced Outage Rate 20.8 9.8 27.5
24. Shutdowns scheduled over next 6 months (type, date and duration of each)

N/A

25. If shutdown at end of Report Period, Estimated Date of Startup:

N/A

26. Units in Test Status (Prior to Commercial Operation) :

Forecast Achieved Initial Criticality 9/30/76 12/11/76 Initial Electricity 11/1/76 12/25/76 Commercial Operation 12/20/76 6/30/77 l

8-1-7.R2 I

UNIT SHUTDOWN AND POWER REDUCTIONS Dockst No.50-272 REPORT MONTH JULY 1986 Unit Name Sclem N A1 Date August 10,1986 Completed by Pell White Telephone 609-935-6000 Extension 4451 Method of Duration Shutting License Cause and Corrective No.

Date Type Hours Reason Down Event System Component Action to 1

2 Reactor Report Code 4 Code 5 Prevent Recurrence i

594 0721 F

155 A

1 ZZ GENERA H2 Leak on Generator i

i J

I j

l l

1 2 Reason 3 Method 4 Exhibit G 5 Exhibit.1 F: Forced A-Equipment Failure-explain 1-Manual Instructions Salem as S: Scheduled B-Maintenance or Test 2-Manual Scram.

for Prepara-Source C-Refr.eling 3-Automatic Scram. tion of Data D-Regulatory Restriction 4-Continuation of Entry Sheets E-Operator Training & Licensing Exam Previous Outage for Licensee F-Administrative 5-Load Reduction Event Report G-Operational Error-explain 9-Other (LER) File H-Other-explain (NUREG 0161)

MAJOR PLANT MODIFICATIONS DOCKET NO.:

50-272 REPORT MONTH July 1986 UNIT NAME:

Salem 1 DATE:

August 11, 1986 COMPLETED BY:

J.

Ronafalvy TELEPHONE:

609/339-4455

  • DCR NO.

PRINCIPAL SYSTEM SUBJECT 1EC-1897 Safeguards Equip Cntrl Install shielding around wiring from Input relays to Electrical cord File of the SEC.

Move line filters closer to the DC power supplies.

  • DCR - Design Change Request f

_ ~ _,, _. _ _... _.,.. _ _ _ _.

MAJOR PLANT MODIFICATIONS DOCKET NO.:

50-272 REPORT MONTH JULY 1986 UNIT NAME:

Salem 1 DATE:

August 11, 1986 COMPLETED BY:

J.

Ronafalvy TELEPHONE:

609/339-4455

Line filters were relocated and cable shielding was added in order to increase the immunity from electrical transients.

No plant process or discharge is af fected by this design change.

No unreviewed safety or environmental questions are involved.

  • Design Change Request

.~ _ _ _ _.

PSE&G SALEM GENERATING STATION SAFETY RELATED WORK ORDER LOG 1

{

SALEM UNIT 1 WO NO UNIT EQUIPMENT IDENTIFICATION 8607213041 1

STEAM DUMPS AUTO / MANUAL CONTROL l

FAILURE DESCRIPTION:

STEAM DUMPS DO NOT STAY IN AUTO IN ANY MODE OF OPERATION.

CORRECTIVE ACTION:

REPLACED SERVO AMP ON SERVO SETPOINT STATION I

1HC-5078.

EDLf669.

REPLACED PLASTIC GEAR WITH ONE FROM A SPARE MODULE.

GEAR WAS CHIPPED l

CAUSING BINDING. EDLf670 READ PRESSURE TRANSMITTER AT 1TP-507 1.055V INDICATOR 20 PSI.

8607060104 4

1

  1. 14 PENETRATION EXHAUST FA!! BREAKER FAILURE DESCRIPTION:

230V BREAKER REPEATEDLY TRIPS ON OVERLOAD i

}

CORRECTIVE ACTION:

TIGHTENED LOOSE CONNECTIONS ON OVERLOAD.

l l

8606250759 1

11 RHR SUMP PUMP i

FAILURE DESCRIPTION:

THE PUMP WILL NOT SHUT OFF.

IT STARTED IN AUTO AND RAN FOR SEVERAL HOURS.

OPERATORS ATTEMPTED TO AGITATE LEVEL CONTROLS BUT THE PUMP WILL NOT SHUT OFF.

THE BREAKER IS OFF AND IN " MANUAL" CONTROL.

LEVEL DEVICE 63-1A WAS NOT BREAKING AT LOW SUMP LEVEL.

I i

CORRECTIVE ACTION:

ADJUSTED SET SCREW ON CONTACT ACTUATOR FOR MORE POSITIVE CONTACT.

i

SALEM UNIT 1 WO NO UNIT EQUIPMENT IDENTIFICATION 8605061375 1

12MS178 FAILURE DESCRIPTION:

CHECK VALVE, 12MS179, ITS FLANGE IS BLOWING STEAM.

CORRECTIVE ACTION:

REPLACED BONNET GASKET.

8603040648 1

AUX FEEDWATER ISOLATION INTERLOCK BYPA;iS-FAILURE DESCRIPTION:

THE OHA E-44 IS ILLUMINATED AND WILL NOT CLEAR.

CORRECTIVE ACTION:

FOUND DEFECTIVE CARD.

REPLACED CARD.

0099131959 1

PRESSURIZER RELIEF VALVE FAILURE DESCRIPTION:

WHILE PERFORMING 4.0.5-V-MISC., VALVE FAILED TO GIVE CONTROL PANEL AN OPEN INDICATION.

CORRECTIVE ACTION:

INVESTIGATED AND FOUND AIR LEAKING AROUND DIAPHRAGM.

TIGHTENED ALL BOLTS AND HAD CONTROL ROOM OPEN VALVE.

VERIFIED NO LEAKS AND VALVE FULL OPENED.

VERIFIED OPEN INDICATION IN CONTROL ROOM.

l

SALEM GENERATING STATION MONTHLY OPERATING

SUMMARY

- UNIT NO. 1 JULY 1986 SALEM NO. 1 The Unit began the period operating at 90% power.

On 7/10/86, #11 Condensate Pump was placed in service and at 2208 hours0.0256 days <br />0.613 hours <br />0.00365 weeks <br />8.40144e-4 months <br />, Unit load increase to 100% was initiated.

The pump is receiving power from Unit 2 2H Group Bus until the return to service of the #1 Auxiliary Power Transformer.

On 7/19/86 at 2100 hours0.0243 days <br />0.583 hours <br />0.00347 weeks <br />7.9905e-4 months <br />, Unit load was reduced to 90% in order to repair the mechanical seal of #11 Condensate Pump.

With the completion of repairs, the Unit was returned to full power operation on 7/20/86 at 1030 hours0.0119 days <br />0.286 hours <br />0.0017 weeks <br />3.91915e-4 months <br />.

On 7/21/86 at 1115 hours0.0129 days <br />0.31 hours <br />0.00184 weeks <br />4.242575e-4 months <br />, a controlled shutdown to Mode 3 (Hot Standby) was initiated to repair hydrogen leakage from the Main Generator.

Investigation revealed that the leakage was from the equalizing line (cracked pipe) between the two stator water cooling manifolds.

With the completion of Main Generator repairs Unit startup commenced on 7/28/86 at 0058 hours6.712963e-4 days <br />0.0161 hours <br />9.589947e-5 weeks <br />2.2069e-5 months <br /> and at 0649 hours0.00751 days <br />0.18 hours <br />0.00107 weeks <br />2.469445e-4 months <br /> the Unit was synchronized and brought to full power operation where it remained for the rest of the period.

l l

1 d

l

s REFUELING INFORMATION

+

DOCKET NO.:

50-272 s

COMPLETED BY:

J. Ronafalvy UNIT NAME:

Salem 1 DATE:

August 11, 1986 TELEPHONE:

609/935-6000 EXTENSION:

4455 Month July 1986 1.

Refueling information has changed from last month:

YES X

NO 2.

Scheduled date for next refueling:

September 12, 1987 3

3.

Scheduled date for restart following refueling: November 26, 1987 4.

A)

Will Technical Specification changes or other license amendments be required?

YES NO NOT DETERMINED TO DATE X

B)

Has the reload fuel design been reviewed by the Station Operating Review Committee?

YES NO X

If no, when is it' scheduled?

August 1987 5.

Scheduled date (s) for submitting hroposed' licensing. action:

August 1987 if required 6.

Important licensing considerations associated with refueling:

NONE 7.

Number of Fuel Assemblies:

A)

Incore 193 B)

In Spent Fuel Storage 380 8.

Present licensed spent fuel storage capacity:

1170 Future spent fuel storage capacity:

1170 9.

Date of last refueling that can be discharged to spent fuel pool assuming the present licensed capacity:

September 2001 8-1-7.R4

s.

  • s O PSEG Public Service Electric and Gas Company P.O. Box E Hancocks Bridge, New Jersey 08038 S lem Generating Station August 11, 1986 Director, Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555

Dear Sir:

MONTHLY OPERATING REPORT SALEM NO. 1 DOCKET NO. 50-272 In compliance with Section 6.9, Reporting Requirements for the Salem Technical Specifications, 10 copies of the following monthly operating reports for the month of July 1986 are being sent to you.

Average Daily Unit Powar Level Operating Data Report Unit Shutdowns and Power Reductions Major Plant Modification Safety Related Work Orders Operating Summary Refueling Information Sincerely yours,

b sf D J. M.

Zupko, Jr.

General Manager - Salem Operations JR:sl cc:

Dr. Thomas E. Murley Regional Administrator USNRC Region I 631 Park Avenue King of Prussia, PA 19406

,t Director, Office of Management U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Enclosures 8-1-7.R4 g

4 1

\\

g The Energy People evn w