Forwards Insp Repts 50-250/86-29 & 50-251/86-29 on 860428- 0502.No Violations or Deviations Noted.Attention Invited to Unresolved Item Identified in Rept
ML20205D772
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 07/29/1986
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Woody C
FLORIDA POWER & LIGHT CO.
Shared Package
ML20205D778 List:
References
NUDOCS 8608180171
Download: ML20205D772 (2)


See also: IR 05000250/1986029

Text

- ) 4l%

- .

.

l

M19906 )

1

Docket Nos. SC-250, 50-251

License Nos. DPR-31, DPR-41

Florida Power and Light Company

LATTN: Mr. C. O. Woody

Group Vice President j

Nuclear Energy Department

P. O. Box 14000

Juno Beach, FL 33408

Gentlemen:

SUBJECT: NRC INSPECTION REPORT NOS. 50-250/86-29 AND 50-251/86-29

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

M. D. Hunt on April 28 - May 2,1986. The inspection included a review of

activities authorized for your Turkey Point facility. At the conclusion of the

inspection, the findings were discussed with those members of your staff identi-

fied in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

Within the scope of the inspection, no violations or deviations were identified.

Your attention is invited to the unresolved item identified in the inspection

report. This matter will be pursued during future inspections.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

Should you have any que:tions concerning this letter, please contact us.

Sincerely,

\SL

David M. Verrelli, Chief

Reactor Projects Branch 2

Division of Reactor Projects

Enclosure:

NRC Inspection Report

cc w/ encl: (See page 2)

8608180171 860729

PDR ADOCK 05000250 i

G PDR \

b

s D

.

.

Florida Power and Light Company 2

M29N

cg w/ encl:

<. M. Wethy, Vice President i

Turkey Point Nuclear Plant  !

I,C. J. Baker, Plant Manager j

Turkey Point Nuclear Plant i

i

g/.W.Bladow,PlantQASuperintendent

Arias, Jr., Regulatory and Compliance l

Supervisor i