Forwards Insp Rept 50-424/86-42 on 860505-07.No Violations or Deviations Noted.Independent Design Review for Module 13C Performed Competently & Effectively
ML20205D379
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 07/25/1986
From: Brownlee V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML20205D385 List:
References
NUDOCS 8608150346
Download: ML20205D379 (3)


See also: IR 05000424/1986042

Text

,

. Chi l% Wp

, .

Jt)L 2 51986

Docket Nos. 50-424, 50-425

License Nos. CPPR-108, CPPR-109 -

Georgigaower Company

ATTN: Mr. J. H. Miller, Jr.

President

P. O. Box 4545

Atlanta, GA 30302

Gentlemen:

SUBJECT: NRC INSPECTION REFORT NO. 50-424/86-42

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

R. W. Parkhill on May 5-7, 1986 of activities authorized at your Vogtle facility.

The inspection included a review of Readiness Review Module 13C - Chapter 7.0

" Independent Design Review." At the conclusion of the inspection, the findings

were discussed with those members of your staff identified in the enclosed

inspection report.

The objective of the inspection was to ensure that Stone and Webster Engineering

Corporation (SWEC), the Independent Design Review (IDR) contractor, had performed

a thorough review of the Readiness Review module chapter, as well as to ensure

that appropriate corrective action had been implemented by Georgia Power Company

(GPC), where necessary. 1he results of this inspection are documented in the

enclosed inspection report and have been discussed with your staff during our

inspection exit briefing.

Based on this inspection, we believe that the IDR for Module 13C was performed

competently and effectively. Minor comments are presented in the enclosed

inspection report. Your resolution of IDR Findings 1,2, and 7 will be examined

during the next inspection of the IDR portion of your Readiness Review Program.

Within the scope of the inspection, ne violations or deviations were identified.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

t

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

ORIGINAL SIGNED BY

VIRGIL L. BROWNLEE

t 8608150346 860725

gDR ADOCK 0500 4 Virgil L. Brownlee, Chief

i Reactor Projects Branch 3

Division of Reactor Projects

Enclosure: (See page 2)

lEbI%

'

.

s "

Ge:rgia P;wsr Company 2

Enclosure:

NRC Inspection Report

cc w/ encl: ,

J g . O'Reilly, Senior Vice President

Nuclear Operations

R,-4!. Conway, Senior Vice President &

Project Director

IL.-0. Foster, Vice President, Project

Support

& D. Rice, Vice President, Project

Engineering

M . Pinson, Vice President, Project

Construction

J - T. Beckham, Vice President &

General Manager - Operations

F A. Thomas, Vice President,

Licensing

p S. Read, General Manager,

Quality Assurance

p W. Hayes, Vogtle Quality

Assurance Manager

bleC. Ramsey, Manager -

Readiness Review

AV B. Bockhold, General Manager,

Nuclear Operations

Q< Gucwa, Manager, Nuclear Safety

and Licensing

& H. Googe, Project

Construction Manager

L D. Groover, Quality

j

Assurance Site Manager -

Construction

LL A. Bailey, Project Licensing

i Manager

]

i

(G/ F. Trowbridge, Esq., Shaw,

Pittman, Potts and Trowbridge

B A . Churchill, Esq., Shaw,

Pittman, Potts and Trowbridge

-Ed. Blake, Jr. , Esq. , Shaw,

,

Pittman, Potts and Trowbridge

! d -E. Joiner, Troutman, Sanders,

Lockerman and Ashmore

P G. Ledbetter, Commissioner,

i

P.DepartmentofHumanResources

H. Badger, Office of Planning

and Budget

(cc w/enci cont'd see page 3)

i

!

- - - - , - . - _. . . - . . - _ _ _ _ __ -

(

.

} ."

Georgia Power Company 3

h 2 51986

.(cc w/ encl cont'd)

Mirkland, III, Counsel,

Office of the Consumer's Utility

Council

g,4.Teper,GeorgiansAgainst

Nuclear Energy

l

M/.. Margulies, Esq., Chairman,

Atomic Safety and Licensing Board

Panel

WO. H. Paris, Administrative Judge

Atomic Safety and Licensing Board

Panel

G. 3. Linenberger, Jr. , Administrative Judge

.

'Ktomic Safety and Licensing Board-

Panel

it,4 . Garde, Citizens Clinic, Director

Government Accountability Project

bec w/ encl:

& Reis, ELD

R M. Hill, IE

L -Miller, NRR

E -Brach, EDO

E.-Imbro, IE

M Sinkule, RII

Christnot, RII

i

NR6 Resident Inspector

Document Control Desk

State of Georgia

.

RII

,

RIIg5

EChrist[ot:dm MSinkule

7/ /86 7/96/86

. .

.. -- ._ - . -- _ .- .- _