Notice of Violation from Insp on 860623-27
ML20205D315
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 07/29/1986
From: Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20205D313 List:
References
50-321-86-18, 50-366-86-18, NUDOCS 8608150329
Download: ML20205D315 (2)


Text

.

ENCLOSURE 1 NOTICE OF VIOLATION Georgia Power Corporation Docket Nos. 50-321 and 50-366 E. I. Hatch License Nos. DPR-57 and NPF-5 Baxley, Georgia During the Nuclear Regulatory Commission (NRC) inspection conducted on June 23-27, 1986, a violation of NRC requirements was identified. The violation involved the failure to survey materials prior to release from the radiation controlled area, and failure to adequately survey items being removed from the radiation controlled area. In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1985), the violation is listed below:

Technical Specification 6.8.1.a requires the licensee to establish, implement and maintain written procedures covering the applicable activities in Appendix A of Regulatory Guide 1.33, Revision 2, February 1978.

Regulatory Guide 1.33, Revision 2, February 1978, recommends the licensee have procedures for radiation surveys and contamination control.

Plant Procedure 60AC-HPX-07-0, Control of Radioactive Materials, Section 8.6.1 requires that all materials leaving the radiation controlled area (RCA) be treated as radioactive material and not be released for unrestricted use until health physics has monitored and authorized the release.

Plant Procedure 62RP-RAD-017-0, Release Surveys for Trash and Materials Leaving Operating Buildings, requires that radiation levels at one inch from the surface of the material must be less than 100 counts per minute (cpm) above background using a G.M. detector. This procedure further requires that materials removed from the operating buildings be surveyed by a Health Physics Technician.

Contrary to the above, the requirement that material be surveyed prior to removal from the RCA/ operating buildings was not met in that on June 23-25, 1986:

1. Materials were released from the RCA for unrestricted use without being monitored and authorized for such release. The materials included lunchboxes, radios, and flashlights removed by approximately 25 individuals.
2. Materials were removed from an operating building past Control Point C-52 without having a survey performed sufficient to detect radioactivity levels of 100 counts per minute above background. The detector was being moved over the material too rapidly to detect the specific release level.

8608150329 860729 PDR ADOCK 05000321 Q PDR

Georgia Power Company 2 Docket Nos. 50-321 and 50-366 E. I. Hatch License Nos. DPR-57 and NPF-5 This is a Severity Level IV violation (Supplement IV).

Pursuant to the provisions of 10 CFR 2.201, GPC is hereby required to submit to this Office within 30 days of the date of the letter transmitting this Notice a written statement or explanation in reply including: (1) admission or denial of the violation, (2) the reason for the violation if admitted, (3) the corrective steps which have been- take'n and the results achieved, (4) the corrective steps which will be taken to avoid further violations, and (5) the date when full compliance will be achieved. Where good cause is shown, consideration will be given to extending the response time.

FOR THE NUCLEAR REGULATORY COMMISSION

/

  • /

as/1 1 Luis A. Re e , Acting Director Division o eactor Projects Dated at Atlanta, Georgia this 29th day of July 1986

.