Monthly Operating Rept for Jan 1987
ML20205C986
Person / Time
Site: Ginna Constellation icon.png
Issue date: 01/31/1987
From: Kober R, Mcnamara A
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NUDOCS 8703300306
Download: ML20205C986 (6)


Text

e

  • /

-I-OPERATlHG DATA REPORT DOCKET NO.

50-244 DATE Jbbruary 16, 1987

8. M W

- w COMPLETED BY Andrew E. McN$5 ara TELEPHONE 315-524-4446 Ext. 301 OPERATING STATUS Ginna Station

~_.

1. Unit Name:

R.E. GINNA NUCLEAR POWER PLANT Notes

2. RePortinA Period.

January, 1987 The unit reactor power level 1520

3. Licensed Thermal Power (MW:):

was maintained at 100% until

~

490

4. Nameplate Rating (Gross MWe):

January 4.

Additional 470 detailn are stmnarized on.

5. Design Electrical Rating (Net MWe):

490 page 4.

6. Maximum Dependable Capacity (Gross MWe):

470

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

J

9. Power Level to Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Yr. to-Date Cumulative

11. Ilours in Reporting Period 744 744 150.624.00 744 744 116,747.97
12. Number of Ilours Reactor Was Critical 0

0 1,687.55*

13. Reactor Reserve Shutdown llours 744 744 114.428.38
14. Ifours Generator On.Line 0

0 8.5*

15. Unit Reserve Shutdown llours 1,088,064 1,088,064 160,138,113
16. Gross Thermal Energy Generated (MWil) 362,561 362,561 52,451,173
17. Gross Electrical Energy Generated (MWil)
18. Net Electrical Energy Generated (MWil) 344,594 344.594 49.758.177

~

100%

100%

75.97%

19. Unit Service Factor 100%

100%

75.98%

20. Unit Availability Factor 98.55%

98.55%

71.82%

21. Unit Capacity Factor (Using MDC Net) 98.55%

98.55%

71.82%

22. Unit Capacity Factor (Using DER Net) 0%

0%

6.9%

23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

$e Fbbruary 7, 1987 - Annual Refueling and Maintenance

-ru o Mo0 oo

25. If Shur Down At End Of Report. Period, Estimated Date of Startup:

So

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved M

INITIAL CRITICALITY Q@

INITIAL ELECTRICITY

'04 COMMERCIAL OPERATION nom "EV A" **

'k gg *Ctrrtanlative Total Cornmncing January 1,1975 i

. AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-244 UNIT R.E.

Ginna Nuclear Power Plant DATE February 16. :.987 COMPLETED BY W b h8 W Andrew E7 McNamara TELEPHONE 1 (315) 524-4446 Ext. 301 at Ginna MONTH January, 1987 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1.

482 17.

466 2.

482 18.

464 3.

481 19.

463 4.

480 20.

461 t

5.

480 21.

458 6.

480 22.

454 7.

480 23.

454 8.

480 24.

452 9.

480 25.

448 10.

480 26.

443 11.

480 27.

440 12.

475 28.

435 13.

473 29.

429 14.

469 30.

428 15.

475 31.

423 16.

469 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in'the reporting month.

Compute to the nearest whole megawatt.

IXX:KET NO.

50-244 IINITNAMI'. R E. ENNA NUCLEAR POWER PLANTf UNIT SHUTDOWN AND POWER REDUCTIONS DATE N = 7 16 19 7,____

. COMPLETED BY - bee d-W i

t-REPORT MONTH JANUARY. 1987 TELEPilONE 3 k4 301 Ginna Station n

N ee-p g,

lia Couse & Corrective E '2 Licensee

}.c w*j e

No.

Dow

{

j'g Event -

gj Action w R* Port #

Au

!u Prevent Recurrence dE e

e as 2

g u

o No shutdowns or significant' power reductions to report.

1 l

l l

1 2

3 4

F: Forced Reason:

Method:

Exhibit G - Instructions Sr Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manni Scram.

Entry Sheets for Licensee C-Refueling 3-Automatic Scram.

' Event Report (LER) File (NUREG-D-Regulatory Restriction' 4-Other (Explain) '

0161)

E-Operator Traini::g & License Examination '

F-Administrative.

5 G-Operational Enor (Explain) w nty, e o.n H-Other (Explain)

Exhibit 1 '- Same Somee f

e S

m%

m e

@,ty < -

". p f N -

'-7

~y

,r.

2 - '

g,s p ' i.

i w

.s 7

_g_

f gf ${

e

- b\\

f'

,b C F.

j..

1 n'

v y

h W.,

i i,!

4 V, T '.

NARRATIVE SIDDIARY OF OPERATINT( EXPERIENCE s

i.

l y1' __ \\

i

~

y(p r

s

.\\

. DOCKET NOi 50-?44 UNIT R.E. Ginna Nuclear Power Plant-

/

DATE February 1G, 1987 sM CGYiPLETED BY d hE - hiW - > >

t l'

/;

- (,

Andrew E. McNamara s

i lfELEPHONE 1 (315) 524-4446 y

EXT. 301 at Ginna i

1 NOkTH nTanuarv. 1987,,,

s 3

- The? reactor' power level has maintained atl10d4 until January 4'.

e Frop January 4 to JaLuary 21 the reactorspower level was decreased to maintain \\.nain feedwater pumps suction' pressure greater then

',~

. 190 psig, dus to higher differentialipressures across the low nressure fecdwater heaters caused'bysfouling of the tubes.

From v.

January 21 until the's end of the month, power was reduced per the coastdown procedure.

k g.

s Y

L.

N

~

(

{ 's.\\q

(.

\\

s v

r 4

i g

l t'

(

(

s

~

N.,

(

%4 3

s.

r

\\

x t

t

\\

I s'

\\

q i

C

~

t b

{

y st-(

1 y

\\

t'

's i L l

'\\

/

\\'.

s; W

s g (

'c, wg

\\

/

\\

s

\\

l l

I

,b....-..........,-...------

1 GINNA STATION g,

MAINTENANCb REPORT

SUMMARY

JANUARY, 1987 During the month of January, routine maintenance and inspections were completed.

Major safety related work included:

a.

Rebuild Spare Service Fater Pump 4

b.

Spent Fuel Pit Recirc Pump - P.M.

Inspection c.

"R-10A" Rad. Monitor - P.M.

Inspection d.

"A" Containment Spray Pump P.M.

Inspection e.

"B" Containment Spray Pump - P.M. Inspection i

f.

"A" RHR Pump - P.M. Inspaction 5

g.

"B" RHR Pump - P.M. Inspection h.

Snubber Inspection - M-40 i

'I s a

\\

\\

\\

e 1

l

- -- -~

t~

'f,* '

'(

?

j-

/

g.,3 3

s.

$$f$j???U?

fy&h==k)

KCI s =* m: =.-

y

~

s;R1

_ &@=d h%$ LUM M

w ;g ROCHESTER GAS AND ELECTR!C CORPORA 110N e 89 -EAST AVENUE, ROCHESTER, N.Y. 14649-0001

'4 ROGER W KODER

'd" *c","gL.

.= caos n. 546-2 700 s.Y c

GINNA STATION

\\

February 16', 1987

\\

\\

Director, Office of Management Information and Program Analysis U.S. NUCLEAR REGULATORY COMMISSION 1

Washington, DC 20555

Subject:

Monthly Report for January, 1987 Operating Status Information R. E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Sir:

Pursuant to our Technical Specification 6.9.1, attached l

herewith is the monthly operating status report for Ginna Station l.;

for the month.of January, 1987.

I j

V truly yours, Y

o l

Ro er W.

Kober RWK/eeh Attachmenbs cc: