Text
.
.~.
Mailing AddreCs Alabama Power Company 600 Wrth 18th Street i
Post Office Bon 2641 Birmingham, Alabama 35291 t
Te' phone 205 783-6090 4
R. P. Mcdonald 1
Senior Vice President Fhntridge Building y yyyj) y Q)g September 16, 1985 i
Docket Nos. 50-348 1
50-364 e
i Director, Nuclear Reactor Regulation U. S. Nuclear Regulatory Comission i
Washington, D.C.
2055b Attention: Mr. S. A. i irga i
Joseph M. Farley Nuclear Plant - Units 1 and 2 j
Refueling Water Storage Tank Check Valve Inservice Testing l
Gentlemen
- i By letter dated November 15, 1984, the NRC transmitted u Safety Evaluation for performing the inservice testing of the Refueling Water Storage Tank (RWST) Containment Spray suction check valve for each unit.
i The NRC safety evaluation provided a clear description of the required
[
j frequency of the disassembly test method, but Alabama Power Company is
}
j uncertain whether the relief included the required frequency of the i
equivalent flow test method.
l l
It is Alabama Power Company's understanding that relief was granted to either 1) disassemble the RWST check valve or 2) perform a test which will demonstrate equivaler.t flow through the check valve.
This relief was provided on a refueling outage basis and not every cold shutdown as stated in the ASME Section XI Code Section IWV-3522.
Alabama Power Company requests written confirmation of the aforementioned position by December 1,1985 in order to facilitate planning for an equivalent flow test during the upcoming Unit 1 and 2 refueling j
outages.
1 l
If there are any q"estions, please advise, f
{
Yours very tr NY 9
f i-R. P. Mcdonald t
RPM /BHW:gri-042 l
- k i: de by7 j
Hr. E. A. Reeves Mr. W. H. Bradford l
-