Forwards Equipment Qualification Insp Rept 50-298/88-26 on 880606-0921 & Notice of Violation
ML20205C449
Person / Time
Site: Cooper Entergy icon.png
Issue date: 10/19/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Trevors G
NEBRASKA PUBLIC POWER DISTRICT
Shared Package
ML20205C453 List:
References
NUDOCS 8810260502
Download: ML20205C449 (2)


See also: IR 05000298/1988026

Text

. . . _

/

'

l , J, . . OCT I 91988

u

In Reply Refer to:

Docket: 50-298/88-26

Nebraska Public Power District

' ATTN: George A. Trevors

Division Manager - Nuclear Support

l. P.O. Box 499

Columbus, NE 68601

i

SUBJECT: EQUleMENT QUALIFICATION (EQ) INSPECTION - COOPER NUCLEAR STATION

INSPECTION REPORT 50-298/88-26

l

l Gentlemen:

1

L This refers to a special EQ followup inspection to review compliance with

10 CFR 50.49 of activities authorized by License No. DPR-45 conducted by

Mr. A. R. Johnson during the period June 6 through July 22 August 14-26, and

l September 19-21,1988, :t the NRC Region IV <1ffice for the Cooper Nuclear

l

Station.

Areas examined during ti - inspection were your actions on previously

'

,

'

identified items regardi quipment qualification as documented ir. NRC

Inspection Report 50-298, ?8 which was fontarded to you previously by our

letter dated April 1,198)

We have examined your actions taken with regard tu these findings as discussed

with you and other members of your staff during the enforcement meeting held on i

! June 20, 1988, at the NRC Region IV office, and as outlined in your response 1

l letter to NRC Region IV on July 13, 1988. The inspection findings are  !

documented in the enclosed NRC Inspection Report 50-298/88-26.

During the followup inspection, it was found that certain of your activities 1

which occurred subsequent to Nonmber 30, 1985, were in violation of NRC

requirements. You are required to respond to the violation, in writing,

in accordance with the provisions of Section 2.201 of the NRC's "Ruids of

Practice," Part 2, Title 10. Code cf Frderal Regulations. Your response

should be based on the specifi' o.:' "1d in the Notice of Violation enclosed

with this letter.

Four unresolved items were identifica of which three have been closed out

requiring no further action and one has been redesignated as an open item.

l These items were previously identified ai potential enfcreement/ unresolved

!

items in NRC Inspection Report 50-298/86-23. Six remaining previously I

identified potential enforcement / unresolved items are being considered for

l escalated enforcement under the Modified Enforcement Policy that was outlined

L in Generic Letter 88-07. These items will be send to you under separate cover.

RIV:PSS* r.:PSS*M 0:DRS* .D: h h

ARJohnson/tw TFStetka JLH11hoan LMllan

l / /88 1./6/88 / /88 to/li /88

l *previously concurred i

I

,

p

e -

L *bDm mege p

l

.

.

, ,. .

Nebraska Public Power District -2- l

!

!

Should you have any questions, we will be pleased to discuss them with you. [

Sincerely,

!

.

L. J. Callan, Director  !

'

Division of Reactor Projects i

!

Enclosures: , i

1. Appendix A - Notice of Violation .i

2. Appendix B - NRC Inspection Report

50-298/88-26 j

.l

cc w/ enclosures:

Cooper Nuclear Station

AiTN: Guy Horn, Division Manager

of Nuclear Operations

P.O. Box 98 .

'

Brownville, Nebraska 68321

Kansas Radiation Control Program Director

Nebraska Radiation Control Program Director j

bectoDMB(IE-01) (

bec distrib, by RIV: l

  • RRI *R. D. Martin, RA
  • 5ectionChief(DRP/C) ,Lisa Shea RM/ ALT  :

'

'RPB-DRSS * MIS System

  • RIV File * Project Engineer DRP/C
  • RSTS Operator *W. Long, NRR Project Manager j

,

  • DRS *DRP. 1

2

  • T. Stetka *A. Johnson, DRS/PSS l

4

U. Pc arovs, Section Chief, Vendor Inspection Branch j

,

  • w/h - }

<

!

l

.

i

i

i  !

~l

- - - _ , - , . . - - . . , _ - - - , . ,,- , .. ..