OPERATING DATA REPORT DOCKET NO. 50-409 DATE 02/06/87 COMPLETED BY L. Malin TELEPHONE 608-689-2331 OPERATING STATUS 1.
Unit Name:
La Crosse Boilina Water Reactor l Notes l
2..
Report Period:
0000, 01/01/87 to 2400, 01/31/87 l
l 3.
Licensed Thermal Power (MWt):
165 l
l 4.
Nameplate rating (Grosc MWe):
65.3 l
l 5.
Design Electrical Rating (Net MWe):
50 l
l 6.
Maximum Dependable Capacity (Gross MWe):
50 l
l 7.
Maximum Dependable Capacity (Net MWe):
48 l
l 8..
If Changes Occur in Capacity Ratings (Items 3 Through 7) Since Last Report, Give Reasons:
9.
Power Level to Which Restricted, If Any (Net MWe):
10.
Reasons for Restrictions, If Any:
This Month Year-to-Date Cumulative
-11.
Hours In Reporting Period 744 744 151.227 12.
Number of Hours Reactor Was Critical 706.2 706.2 101.188.2
- 13. Reactor Reserve Shutdown Hours 0
0 517.2
- 14. Hours Generator On-Line 685.6 685.6 94.184.6 15.
Unit Reserve Shutdown Hours 0
0 120.5 16.
Gross Thermal Energy Generated (MWH) 106.555.7 106.555.7 13.123.776.7 17.
Gross Electrical Energy Generated (MWH) -33.198 33.198 3.943.689
- 18. - Net Electrical Energy Generated (MWH) 31.396 31.396 3.657.320 i
19.
Unit Service Factor 92.1 92.1 62.3
'20.
Unit Availability Factor 92.1 92.1 62.4
- 21.. Unit Capacity Factor (Using MDC-Net) 87.9 87.9 50.4 22.
Unit Capacity Factor (Using DER Net) 84.4 84.4 48.4 j
23.
Unit Forced Outage Rate 7.9 7.9 11.9
.24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
25.
If Shut Down At End Of Report Period, Estimated Date of Startup:
26.
Units In Test Status (Prior to Commercial Operation):
Forecast Achieved i
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 8703300167 B70131 PDR ADOCK 05000409 R
ppg If
w-
.L AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-409 UNIT LACBWR DATE 02/06/87 COMPLETED BY L.S. Goodman TELEPHONE 608-689-2331 MONTH January 1987 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 48 17 48 s
2 48 18 48 I
3 48 19 47 4
48 20 47 5
48 21 47 6
48 22 48 7
14 23 47 8
0 24 47 9
2 25 48 10 23 26 48 11 36 27 48 12 46 28 48 13 48 29 48 14 48 30 48 15 48 31 48 16 48
- Instruction On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
4
---m,.--._..-.-.,,..-,,-y
,c-w.m,---,-.e.---,-w
---,--w,,,--,y--.,-,,-..,
-m.
-.,--w--
-w, we-.,--e
A UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-409 UNIT NAME LACBWR DATE 02/06/87 REPORT MONTH JANUARY 1987 COMPLETED BY L.S. Goodman TELEPHONE 608-689-2331 l
l l
l l
l l
l l
l
-l l
l l
l l
l Method of l Licensee l l
l Cause & Corrective l
2 l Shutting Dgwn!
Event l Systeg l Compongnt!
Action to l
1 ll Duration l l
l l
(Hours) l Reason l
Reactor l Report # l Code l
Code l
Prevent Recurrence l
l No. l Date l Type l
l l
l l
l l
l l
l l
l l
l l
l l
l l
l87-1 l01/07/87l F l 58.4 l
H l
3 l
87-01 l HB l VALVEX l Reactor automatically shut down l l
l l
l l
l l
l l
l when the turbine stop valve l
l l
l l
l l
l l
l l partially closed during per-
.l l
l l
l l
l l
l l
l formance of the weekly turbine l
l l
l l
l l
l l
l l simulated overspeed test.
l l
l l
l l
l l
l l
l Repeated testing was performed. l l
l l
l l
l l
l l
l l
l l
l l
l l
l l
l l
l l
l l
l l
l l
l l
l l
l l
l l
l l
l l
l l
l l
l l
l l
l l
l l
l l
l l
l l
l l
l l
l l
l l
l l
l l
l l
l l
l l
l l
l l
l l
l l
l l
l l
l l
l l
l l
l l
l l
l l
l l
l l
l l
l l
l l
l l
l l
l l
l l
l l
l l
l l
1 2
3 4
Reason Method Exhibit G-Instrustionse for F: Forced A-Equipment Failure (Explain) 1-Manual Preparation of Data Entry Sheets S: Scheduled B-Maintenance or Test 2-Manual Scram for Licensee Event Report (LER)
C-Refueling 3-Automatic Scram File (NUREG-0161)
D-Regulatory Restriction 4-Other (Explain)
E-Operator Training & License Examination F-Administrative 5
G-Operational Error (Explain)
Exhibit 1 - Same Source H-Other (Explain)
(
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE JANUARY 1987 At the onset of the January reporting period, power generation continued at approximately 96% Rated Thermal Power (48 MWe-net).
At 0650 on January 7, 1987, the reactor automatically shut down when the turbine stop valve went partially closed during performance of the weekly turbine simulated overspeed test.
At 0651, the turbine was tripped. Extensive testing was performed to determine the cause of the stop valve partial closure. The cause could not be conclusively determined.
The reactor was taken critical at 2040 on January 8.
The turbine generator was synchronized to the DPC grid at 1718 on January 9.
Power escalation continued until January 15, when 97% power (48 MWe-net) was achieved.
Power generation continued at approximately this level for the remainder of the reporting period.
A
a D DA/RYLAND hhk[ COOPERATlVE eO box 8i7 26isEAST AVE.SO LACROSSE. WISCONSIN 54602-08i7 (608) 788-4000 JAMES W. TAYLOR General Manager February 6, 1987 In reply, please refer to LAC-12100 DOCKET NO. 50-409 Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, DC 20555
SUBJECT:
DAIRYLAND POWER COOPERATIVE LA CROSSE BOILING WATER REACTOR (LACBWR)
PROVISIONAL OPERATING LICENSE NO. DPR-45 MONTHLY OPERATING DATA FOR JANUARY 1987
REFERENCES:
- 1) NRC Letter, Reid to Madgett, dated September 19, 1977.
- 2) NRC Letter, Reid to Madgett, dated December 29, 1977.
1 Gentlemen:
In accordance with instructions contained in Reference (1) and Technical Specification Amendments contained in Reference (2), we are submitting information concerning operability and availability of the La Crosse Boiling Water Reactor (LACBWR) for the Month of January 1987.
Please contact us if there are any questions concerning this report.
Sincerely, f
JWT LSG sks i
l cc J. G. Keppler, Regional Administrator, NRC-DRO-III i
Roby Bevan, LACBWR Project Manager NRC Resident Inspector D. Sherman (ANI Library)
(((
l t