Forwards Request for Addl Info Re Util Responses to Generic Ltr 83-28,Items 2.1,2.2,3.1.3,3.2.3,4.4 & 4.5.Response Requested within 60 Days of Ltr Receipt
ML20205C209
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 09/12/1985
From: Butcher E
Office of Nuclear Reactor Regulation
To: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
References
GL-83-28, NUDOCS 8509200195
Download: ML20205C209 (3)


Text

.

r Y'

[h b

September 12, 1985

\\

Docket No. 50-338 DISTRIBUTION:

and 50-339 DOCKET FILE ACRS (10)

NRC PDR Gray File Local PDR J. A. Stevens Mr. W. L. Stewart ORBf3 Rdg Vice President - Nuclear Operations HThompson Virginia Electric and Power Company OELD Post Office Box 26666 Edordan Richmond, Virginia 23261 BGrimes LEngle

Dear Mr. Stewart:

-PMKreutzer i

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION; RESPONSE TO GENERIC LETTER 83-28 ITEMS 2.1, 2.2, 3.1.3, 3.2.3, 4.4 AND 4.5 - NORTH ANNA POWER STATION, UNITS N0.1 MD N0. 2 (NA-1&2)

We have completed our review for assessing the completeness and adequacy of your responses to the subject items as noted above. Our review indicates

~

that your responses are incomplete or inadequate in some cases.

The enclosure to this letter specifies those items for which your response was found to be either incomplete or inadequate. For each such item, a brief description of the deficiency is provided as a guide for corrective action.

i It is noted that efforts by Owners Groups, INP0 and NSSS vendors have been or are being made to produce generic responses that may be useful in meeting the requirements of Generic Letter 83-28, Items 2.1, 2.2, 4.4, 4.5.2 and 4.5.3.

You may wish to contact the appropriate Owners Group or INP0 regarding the applicability of such generic responses for NA-1&2.

We request that your response to the items specified in the enclosure be submitted for our continuing review within 60 days of your receipt of this letter.

This request for information affects fewer than 10 respondents; therefore, OMB clearance is not required under P.L.96-511.

Sincerely, 850920019585go92m

/s/

Am O gDR PDR Edward J. Butcher, Acting Chief Operating Reactors Branch #3 Division of Licensing

Enclosure:

Request for Additional Information cc w/ enclosure ORB #3 0 OR b

0 #

DL P

r LEntTe:'dd Euf:her 8

/85 8/jl/85 g//2,/85

1 Mr. W. L. Stewart North Anna Power Station Virginia Electric & Power Company Richard M. Foster, Esq.

Atomic Safety and Licensing Appeal Musick, Williamson, Schwartz, Board Panel Leavenworth & Cope, P.C.

U.S. Nuclear Regulatory Comission P. O. Box 4579 Washington, DC 20555 Boulder, Colorado 80306 Regional Administrator Michael W. Maupin, Esq.

USNRC, Region II Hunton, Williams, Gay and Gibson Office of Executive Director P. O. Box 153S for Operations Richmond, Virginia 23212 101 Marietta Street N.W., Suite 2900 Atlanta, Georgia 30323 Mr. W. T. Lough Virginia Corporation Commission Mr. E. W. Harrell Division of Energy Regulation P. O. Box 402 P. O. Box 1197 Mineral, Virginia 23117 Richmond, Virginia 23209 Old Dominion Electric Cooperative Ellyn R. Weiss, Esq.

c/o Executive Vice President Sheldon, Mannan, Roisman and Weiss Innsbrook Corporate Center 1725 I Street, N.W., Suite 506 4222 Cox Road, Suite 102 Washington, DC 20006 Glen Allen, Virginia 23060 Mr. J. H. Ferguson Mr. Richard C. Klepper Executive Vice President - Power Board of Supervisors Virginia Electric and Power Co.

Louisa County Courthouse Post Office Box 26666 P. O. Box 27 Richmond, Virginia 23261 Louisa, Virginia 23093 Mr. Anthony Gambardella Office of the Attorney General Supreme Court Building 101 North 8th Street Richmond, Virginia 23219 Resident Inspector / North Anna c/o U.S. NRC Senior Resident Inspector Route 2, Box 78 Mineral, Virginia 23117 Mrs. Margaret Dietrich Route 2, Box 568 Gordonsville, Virginia 22042 Mr. Paul W. Purdom Environmental Studies Institute Drexel University 32nd and Chestnut Streets Philadelphia, Pennsylvania 19104

REQUEST FOR ADDITIONAL INFORMATION NORTH ANNA POWER STATION, UNIT 5 NO. 1 AND 2 GENERIC LtIIER 83-28, Items 2.1, 2.2.1, 2.2.2, 4.5.2 AND 4.5.3 i

NORTH ANNA 1&2 Item 2.1(part2)-Incomplete Licensee needs to submit detailed information describing his vendor interface program for reactor trip system components.

Infomation supplied should state i

how the program assures that vendor technical infomation is kept complete, current and controlled throughout the life of the plant and should also indicate how the program will be implemented at NORTH ANNA 162.

Item 2.2.1 - Incomplete Responded to items 2.2.1.1 to 2.2.1.5 but need to submit a response to item 2.2.1.6.

Item 2.2.2 - Incomplete Licensee needs to submit detailed infonnation describing his vendor interface program for all safety-related components. Information supplied should state how the program assures that vendor technical information is kept complete, current and controlled throughout the life of the plant and should also indicate how the program will be implemented at NORTH ANNA 1&2.

Item 4.5.2 - Incomplete Licensee needs to state if his plant is currently designed to pemit on-line testing of the RTS. If not either design modifications that will pemit such testing shall be described along with an implementation schedule or justification for not providing on-line testing capability shall be provided.

i Item 4.5.3 - Incomplete Licensee needs to submit a description of the ' imp'lementat' ion o'f tihose prov'is' ions of WCAp-10271 and Supplement I which have been approved in the NRC's SER issued in March, 1985. Also, the licensee needs to describe the additional provisions and implementation that may be developed by the WOG for the actuation logic and activated devices.

i

-