Similar Documents at Byron |
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217P6171999-10-21021 October 1999 Forwards non-proprietary & Proprietary Versions of HI-982083, Licensing Rept for Byron & Braidwood Nuclear Stations. Proprietary Rept Withheld,Per 10CFR2.790(b)(4) ML20217M2871999-10-21021 October 1999 Refers to Rev 5 Submitted in May 1999 for Portions of Byron Nuclear Power Station Generating Stations Emergency Plan Site Annex.Informs That NRC Approval Not Required Based on Determination That Plan Effectiveness Not Decreased ML20217H4661999-10-18018 October 1999 Forwards Changes to EPIPs IAW 10CFR50.54(q) & 10CFR50,App E, Section V.Details of Changes Encl ML20217F7891999-10-0808 October 1999 Forwards Insp Repts 50-454/99-12 & 50-455/99-12 on 990803- 0916.One Violation Occurred Being Treated as NCV ML20217B6351999-10-0505 October 1999 Forwards for Info,Final Accident Sequence Precursor Analysis of Operational Event at Byron Station,Unit 1,reported in LER 454/98-018 & NRC Responses to Util Specific Comments Provided in ML20212L1791999-10-0505 October 1999 Informs That as Result of Staff Review of Util Responses to GL 92-01,rev 1,suppl 1 & Suppl 1 Rai,Staff Revised Info in Rvid & Is Releasing Rvid Version 2 ML20217B2991999-10-0101 October 1999 Forwards Insp Repts 50-454/99-16 & 50-455/99-16 on 990907-10.No Violations Noted.Water Chemisty Program Was Well Implemented,Resulted in Effective Control of Plant Water Chemistry ML20216J8241999-09-30030 September 1999 Notifies of Removal of NRC Headquarters & Region III Offices from Controlled Copy Distribution of Certain CE Documents. Specific Documents,Associated Controlled Copy Numbers & NRC Location Affected Are Shown on Attachment to Ltr ML20212J6751999-09-30030 September 1999 Forwards Replacement Pages Eight Through Eleven of Insp Repts 50-454/99-15 & 50-455/99-15.Several Inaccuracies with Docket Numbers & Tracking Numbers Occurred in Repts ML20217A5821999-09-29029 September 1999 Advises of NRC Plans for Future Insp Activities at Facility for Licensee to Have Opportunity to Prepare for Insps & to Provide NRC with Feedback on Any Planned Insps Which May Conflict with Plant Activities ML20216F8051999-09-17017 September 1999 Forwards Insp Rept 50-454/99-14 & 50-455/99-14 on 990823-27. Security Program Was Effectively Implemented in Areas Inspected.No Violations Were Identified ML20211P1841999-09-0808 September 1999 Forwards Insp Repts 50-454/99-15 & 50-455/99-15 on 990824- 26.No Violations Noted.Objective of Insp to Determine Whether Byron Nuclear Generating Station Emergency Plan Adequate & If Emergency Plan Properly Implemented ML20211Q6821999-09-0606 September 1999 Informs That NRC Tentatively Scheduled Initial Licensing Exam for Byron Operator Licesne Applicants During Wks of 000619 & 26.Validation of Exam Will Occur at Station During Wk of 000529 ML20211N5151999-09-0303 September 1999 Ack Receipt of Re Safety Culture & Overtime Practices at Byron Nuclear Power Station.Copy of Recent Ltr from NRC to Commonwealth Edison Re Overtime Practices & Safety Culture Being Provided ML20211K1081999-09-0202 September 1999 Responds to Request for Addl Info to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity, for Braidwood,Units 1 & 2 & Byron,Unit 2 ML20211M1371999-09-0202 September 1999 Discusses 990527 Meeting with Ceco & Byron Station Mgt Re Overtime Practices & Conduciveness of Work Environ to Raising Safety Concerns at Byron Station.Insp Rept Assigned for NRC Tracking Purposes.No Insp Rept Encl ML20211G1221999-08-27027 August 1999 Forwards fitness-for-duty Program Performance Data for Each of Comm Ed Nuclear Power Stations & Corporate Support Employees within Scope of Rule for six-month Period Ending 990630,IAW 10CFR26.71(d) ML20211G4021999-08-25025 August 1999 Forwards Insp Repts 50-454/99-10 & 50-455/99-10 on 990622-0802.No Violations Noted ML20211B8691999-08-20020 August 1999 Forwards Insp Repts 50-254/99-10,50-265/99-10,50-454/99-09, 50-455/99-09,50-456/99-10 & 50-457/99-10 on 990628-0721. Action Plans Developed to Address Configuration Control Weaknesses Not Totally Effective as Listed 05000454/LER-1998-008, Informs That Licensee Determined That Suppl Rept to LER 98-008 Is Not Warranted.No Addl Info Was Generated Following Completion of Root Cause Investigation of Following Completion of Corrective Actions Stated in Original LER1999-08-12012 August 1999 Informs That Licensee Determined That Suppl Rept to LER 98-008 Is Not Warranted.No Addl Info Was Generated Following Completion of Root Cause Investigation of Following Completion of Corrective Actions Stated in Original LER ML20210N5651999-08-0606 August 1999 Forwards Rev 8 to Nuclear Generating Stations Emergency Plan, for Plants.With Summary of Changes ML20210M9131999-08-0202 August 1999 Forwards Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for Fys 2000 & 2001 for Comed ML20210K0771999-07-30030 July 1999 Submits 30-day Rept Re Discovery of ECCS Evaluation Model Error for Byron & Braidwood Stations,As Required by 10CFR50.46 ML20210J8951999-07-29029 July 1999 Submits Other Actions,As Described,To Be Taken for Valves to Resolve Potential Pressure Locking Concerns,In Light of Extended Period for Valve Bonnet Natural Depressurization,In Response to GL 95-07, Pressure Locking & Thermal.. ML20210E2151999-07-23023 July 1999 Forwards Byron Unit 1 B1R09 ISI Summary Rept Spring 1999 Outage,980309-990424, in Compliance with Requirements of Article IWA-6000, Records & Repts of Section XI of ASME & P&PV,1989 Edition ML20209H2991999-07-16016 July 1999 Withdraws 980529 LAR to Credit Automatic PORV Operation for Mitigation of Inadvertent Safety Injection at Power Accident.Response to NRC 990513 RAI Re LAR Encl ML20210A3151999-07-16016 July 1999 Forwards Insp Repts 50-454/99-08 & 50-455/99-08 on 990511-0621.Three Violations Being Treated as Noncited Violations ML20210B7071999-07-16016 July 1999 Responds to Requesting Review & Approval of Three Proposed Changes to Ceco QA TR,CE-1A Per 10CFR50.54(a)(3) & 10CFR50.4(b)(7) ML20207H7501999-07-12012 July 1999 Forwards Revised Pressure Temp Limits Rept, for Byron Station,Units 1 & 2.Revised Pressurized Thermal Shock Evaluations,Surveillance Capsule Rept & Credibility Repts, Also Encl ML20209G1391999-07-0909 July 1999 Forwards Results of SG Tube Insps Performed During Byron Station,Unit 1,Cycle 9 Refueling Outage within 12 Months Following Completion of Insps ML20196J9131999-07-0101 July 1999 Submits Status of Nuclear Property Insurance Currently Maintained for Braidwood,Byron,Dresden,Lasalle County,Quad Cities & Zion Nuclear Power Stations,Per 10CFR50.54(w)(3) ML20196J9061999-07-0101 July 1999 Provides Evidence That Util Maintains Guarantee of Payment of Deferred Premiums in Amount of $10 Million for Each of Thirteen Reactors,Per 10CFR140.21 ML20209B8241999-06-30030 June 1999 Forwards Five 3.5 Inch Computer Diskettes Containing Revised Annual Dose Repts for 1994 Through 1998 for Individuals Receiving Neutron Dose Not Previously Included in Reported Total Effective Dose Equivalent Values.Without Diskettes ML20196K0161999-06-30030 June 1999 Discusses 990622 Meeting at Byron Nuclear Power Station in Byron,Il.Purpose of Visit Was to Meet with PRA Staff to Discuss Ceco Initiatives in Risk Area & to Establish Dialog Between SRAs & PRA Staff ML20196G2161999-06-25025 June 1999 Forwards for NRC Region III Emergency Preparedness Inspector,Two Copies of Comed Emergency Preparedness Exercise Manual for 1999 Byron Station Annual Exercise. Exercise Is Scheduled for 990825.Without Encls ML20212H8241999-06-24024 June 1999 Informs That Effective 990531 NRC Project Mgt Responsibility for Byron & Braidwood Stations Was Transferred to Gf Dick ML20209D4861999-06-17017 June 1999 Informs That R Heinen,License OP-30953-1 & a Snow,License SOP-30212-3,no Longer Require License at Byron Station 05000454/LER-1999-002, Forwards LER 99-002-00,IAW 10CFR50.73(a)(2)(i)(b).There Are Two Actions Remaining to Address Cause of Event.Both Actions Are Listed1999-06-0808 June 1999 Forwards LER 99-002-00,IAW 10CFR50.73(a)(2)(i)(b).There Are Two Actions Remaining to Address Cause of Event.Both Actions Are Listed ML20207G0601999-06-0707 June 1999 Provides Updated Info Re Number of Failures Associated with Initial Operator License Exam Administered from 980914-0918. NRC Will Review Progress Wrt Corrective Actions During Future Insps ML20207G0421999-06-0404 June 1999 Forwards Insp Repts 50-454/99-04 & 50-455/99-04 on 990330-0510.Violations Identified & Being Treated as non-cited Violations ML20195D6351999-06-0404 June 1999 Notifies NRC of Actions That Has Been Taken in Accordance with 10CFR26, Fitness for Duty Programs ML20207E5451999-05-28028 May 1999 Forwards Insp Repts 50-454/99-07 & 50-455/99-07 on 990517-20.No Violations Noted.Fire Protection Program Was Effective ML20211M1611999-05-28028 May 1999 Discusses 990527 Meeting with Comed Re Safety Culture & Overtime Control at Byron Nuclear Plant from Videoconference Location at NRC Headquarters.Requests That Aggressive Actions Be Taken to Ensure That Comed Meets Expectations ML20207D5261999-05-26026 May 1999 Forwards Response to NRC 990318 RAI Concerning Alleged Chilling Effect at Byron Station.Attachment Contains Responses to NRC 12 Questions ML20207B6361999-05-25025 May 1999 Forwards SE Accepting Revised SG Tube Rupture (SGTR) Analysis for Bryon & Braidwood Stations.Revised Analysis Was Submitted to Support SG Replacement at Unit 1 of Each Station ML20211M1781999-05-25025 May 1999 Summarizes Concerns with Chilling Effect & Overtime Abuses at Commonwealth Edison,Byron Station.Request That Ltr Be Made Part of Permanent Record of 990527 Meeting ML20195C7911999-05-25025 May 1999 Forwards Revised COLR for Byron Unit 2,IAW 10CFR50.59.Rev Accounts for Planned Increase of Reactor Coolant Full Power Average Operating Temp from 581 F to 583 F 05000454/LER-1999-001, Forwards LER 99-001-00,IAW 10CFR50.73(a)(2)(i)(B).Required Actions to Address Causes of Event Listed1999-05-21021 May 1999 Forwards LER 99-001-00,IAW 10CFR50.73(a)(2)(i)(B).Required Actions to Address Causes of Event Listed ML20206U3471999-05-20020 May 1999 Forwards Insp Rept 50-454/99-05 on 990401-22.No Violations Noted.Insp Reviewed Activities Associated with ISI Efforts Including Selective Exam of SG Maint & Exam Records, Calculations,Observation of Exam Performance & Interviews ML20207A2151999-05-19019 May 1999 Forwards Insp Repts 50-454/99-06 & 50-455/99-06 on 990419-23.No Violations Noted.Insp Consisted of Review of Liquid & Gaseous Effluent Program,Radiological Environmental Monitoring Program,Auditing Program & Outage Activities 1999-09-08
[Table view] Category:NRC TO PUBLIC ENTITY/CITIZEN/ORGANIZATION/MEDIA
MONTHYEARML20205S3841988-10-13013 October 1988 Partial Response to FOIA Request for Documents.App D,E & F Records Encl & Available in Pdr.App F Records Partially Withheld (Ref FOIA Exemption 6) ML20205C1341988-09-28028 September 1988 Partial Response to FOIA Request for Documents.App A,B & C Documents Available in Pdr.App C Document Partially Withheld (Ref FOIA Exemption 6).Forwards App B Documents ML20245D6581988-08-0404 August 1988 Discusses to Congressman Hastert Re Concern That Maint & Operations Employees of Listed Nuclear Power Plants in Vicinity of Seneca,Il Working Excessive Hrs ML20235F8141987-09-24024 September 1987 Partial Response to FOIA Request for Documents.Forwards App B,C & D Documents.App a & B Available in Pdr.App C Documents Partially Withheld (Ref FOIA Exemption 4).App D Documents Withheld in Entirety (Ref FOIA Exemptions 5 & 6) ML20235Y6091987-07-21021 July 1987 Forwards Photocopy of Fr Notice That Incorporates DOJ 740304 Advice Ltr in Entirety,Per Request for DOJ Advice Ltrs Rendered in Conjunction W/Cp Antitrust Review of Plants ML20212P2091987-03-11011 March 1987 Informs That Time within Which Commission May Act to Review Director'S Decision DD-87-2 Expired.Decision Became Final Agency Action on 870310.Served on 870312 ML20198E6491986-05-0808 May 1986 Partial Response to FOIA Request for All Internal Documents Re IE Info Notice 86-005 & Operability of Main Steam Safety Valves.Encl App a Documents Available in Pdr.App B Documents Being Placed in PDR ML20154M4391986-01-15015 January 1986 Partial Response to FOIA Request for Commission Notation Votes During Jan-May 1985.Forwards App a Documents.Documents Also Available in Pdr.Portions of App B & All of App C Documents Withheld (Ref FOIA Exemptions 5 & 1) ML20134D3121985-08-0202 August 1985 Final Response to FOIA Request for Documents Re Leak Rate Tests Performed at Facilities ML20129E9731985-05-0909 May 1985 Responds to FOIA Request for Region III Tracking Sys for Byron & Other Associated Documents.Region III Will Make Computer Printouts Available ML20128Q9281985-05-0909 May 1985 Responds to FOIA Request for Region III Tracking Sys for Facilities & Other Associated Documents.Computer Printout Encl,Per 850503 Telcon IA-85-308, Responds to FOIA Request for Region III Tracking Sys for Byron & Other Associated Documents.Region III Will Make Computer Printouts Available1985-05-0909 May 1985 Responds to FOIA Request for Region III Tracking Sys for Byron & Other Associated Documents.Region III Will Make Computer Printouts Available ML20151K1941984-06-26026 June 1984 Expresses Pleasure That Agreement Reached to Reinstate Long Standing Practice of Easy Cooperation Among Parties. Served on 840627 ML20062J0141982-08-12012 August 1982 Notifies That Dekalb Area Alliance for Responsible Energy/ Sinnissippi Alliance for Environ 820803 Motion to Compel NRC to Suppl SER & Fes Based on Alliance 820730 Petition for Waiver Denied.Response Will Be Filed by 820823 ML20054L5051982-07-0202 July 1982 Confirms That Jr Rajan & E Murphy Will Be Made Available on 820707 in Bethesda for Deposition,Per 820629 Telcon Request. Subj of Deposition Is Joint Affidavit on Contention 9(a) ML20147D1991978-12-13013 December 1978 Forwards Under Separate Cover the Docketed Version of Comm Edison Co Appl for Oper Lic for Subj Facil 1988-09-28
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217M2871999-10-21021 October 1999 Refers to Rev 5 Submitted in May 1999 for Portions of Byron Nuclear Power Station Generating Stations Emergency Plan Site Annex.Informs That NRC Approval Not Required Based on Determination That Plan Effectiveness Not Decreased ML20217F7891999-10-0808 October 1999 Forwards Insp Repts 50-454/99-12 & 50-455/99-12 on 990803- 0916.One Violation Occurred Being Treated as NCV ML20217B6351999-10-0505 October 1999 Forwards for Info,Final Accident Sequence Precursor Analysis of Operational Event at Byron Station,Unit 1,reported in LER 454/98-018 & NRC Responses to Util Specific Comments Provided in ML20212L1791999-10-0505 October 1999 Informs That as Result of Staff Review of Util Responses to GL 92-01,rev 1,suppl 1 & Suppl 1 Rai,Staff Revised Info in Rvid & Is Releasing Rvid Version 2 ML20217B2991999-10-0101 October 1999 Forwards Insp Repts 50-454/99-16 & 50-455/99-16 on 990907-10.No Violations Noted.Water Chemisty Program Was Well Implemented,Resulted in Effective Control of Plant Water Chemistry ML20212J6751999-09-30030 September 1999 Forwards Replacement Pages Eight Through Eleven of Insp Repts 50-454/99-15 & 50-455/99-15.Several Inaccuracies with Docket Numbers & Tracking Numbers Occurred in Repts ML20217A5821999-09-29029 September 1999 Advises of NRC Plans for Future Insp Activities at Facility for Licensee to Have Opportunity to Prepare for Insps & to Provide NRC with Feedback on Any Planned Insps Which May Conflict with Plant Activities ML20216F8051999-09-17017 September 1999 Forwards Insp Rept 50-454/99-14 & 50-455/99-14 on 990823-27. Security Program Was Effectively Implemented in Areas Inspected.No Violations Were Identified ML20211P1841999-09-0808 September 1999 Forwards Insp Repts 50-454/99-15 & 50-455/99-15 on 990824- 26.No Violations Noted.Objective of Insp to Determine Whether Byron Nuclear Generating Station Emergency Plan Adequate & If Emergency Plan Properly Implemented ML20211Q6821999-09-0606 September 1999 Informs That NRC Tentatively Scheduled Initial Licensing Exam for Byron Operator Licesne Applicants During Wks of 000619 & 26.Validation of Exam Will Occur at Station During Wk of 000529 ML20211N5151999-09-0303 September 1999 Ack Receipt of Re Safety Culture & Overtime Practices at Byron Nuclear Power Station.Copy of Recent Ltr from NRC to Commonwealth Edison Re Overtime Practices & Safety Culture Being Provided ML20211K1081999-09-0202 September 1999 Responds to Request for Addl Info to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity, for Braidwood,Units 1 & 2 & Byron,Unit 2 ML20211M1371999-09-0202 September 1999 Discusses 990527 Meeting with Ceco & Byron Station Mgt Re Overtime Practices & Conduciveness of Work Environ to Raising Safety Concerns at Byron Station.Insp Rept Assigned for NRC Tracking Purposes.No Insp Rept Encl ML20211G4021999-08-25025 August 1999 Forwards Insp Repts 50-454/99-10 & 50-455/99-10 on 990622-0802.No Violations Noted ML20211B8691999-08-20020 August 1999 Forwards Insp Repts 50-254/99-10,50-265/99-10,50-454/99-09, 50-455/99-09,50-456/99-10 & 50-457/99-10 on 990628-0721. Action Plans Developed to Address Configuration Control Weaknesses Not Totally Effective as Listed ML20210A3151999-07-16016 July 1999 Forwards Insp Repts 50-454/99-08 & 50-455/99-08 on 990511-0621.Three Violations Being Treated as Noncited Violations ML20210B7071999-07-16016 July 1999 Responds to Requesting Review & Approval of Three Proposed Changes to Ceco QA TR,CE-1A Per 10CFR50.54(a)(3) & 10CFR50.4(b)(7) ML20196K0161999-06-30030 June 1999 Discusses 990622 Meeting at Byron Nuclear Power Station in Byron,Il.Purpose of Visit Was to Meet with PRA Staff to Discuss Ceco Initiatives in Risk Area & to Establish Dialog Between SRAs & PRA Staff ML20212H8241999-06-24024 June 1999 Informs That Effective 990531 NRC Project Mgt Responsibility for Byron & Braidwood Stations Was Transferred to Gf Dick ML20207G0601999-06-0707 June 1999 Provides Updated Info Re Number of Failures Associated with Initial Operator License Exam Administered from 980914-0918. NRC Will Review Progress Wrt Corrective Actions During Future Insps ML20207G0421999-06-0404 June 1999 Forwards Insp Repts 50-454/99-04 & 50-455/99-04 on 990330-0510.Violations Identified & Being Treated as non-cited Violations ML20207E5451999-05-28028 May 1999 Forwards Insp Repts 50-454/99-07 & 50-455/99-07 on 990517-20.No Violations Noted.Fire Protection Program Was Effective ML20207B6361999-05-25025 May 1999 Forwards SE Accepting Revised SG Tube Rupture (SGTR) Analysis for Bryon & Braidwood Stations.Revised Analysis Was Submitted to Support SG Replacement at Unit 1 of Each Station ML20206U3471999-05-20020 May 1999 Forwards Insp Rept 50-454/99-05 on 990401-22.No Violations Noted.Insp Reviewed Activities Associated with ISI Efforts Including Selective Exam of SG Maint & Exam Records, Calculations,Observation of Exam Performance & Interviews ML20207A2151999-05-19019 May 1999 Forwards Insp Repts 50-454/99-06 & 50-455/99-06 on 990419-23.No Violations Noted.Insp Consisted of Review of Liquid & Gaseous Effluent Program,Radiological Environmental Monitoring Program,Auditing Program & Outage Activities ML20207B8751999-05-18018 May 1999 Responds to Ltr Dtd 990225,expressing Concerns That Low Staffing Levels & Excessive Staff Overtime May Present Serious Safety Hazards at Some Commercial Nuclear Power Plants in Us ML20206N4791999-05-13013 May 1999 Forwards RAI Re 980529 Amend Request for Byron & Braidwood to Credit Automatic PORV Operation for Mitigation of Inadvertent SI at Power Accident.Response Requested 60 Days After Receipt Date ML20206J1981999-05-0505 May 1999 Forwards Exam Answer Key for Forms a & B,Grading Results for Facility & Copies of Individual Answer Sheets for Each Individual Taking Gfes of Written Operator Licensing Exam Administered by NRC on 990407.Without Encls ML20206E7021999-05-0303 May 1999 Advises That Info Contained in Document Entitled, Licensing Rept for Sf Rack Installation at Byron & Braidwood Stations, HI-982083,will Be Withheld from Public Disclosure Per 10CFR2.790 ML20206D0361999-04-28028 April 1999 Confirms Plans to Have Meeting on 990527 in Lisle,Illinois to Discuss Results of Ceco Evaluation on Potential Chilling Effect Concern within Working Environ & Use of Overtime within Operations Dept Organization at Byron Station ML20205Q2621999-04-14014 April 1999 Forwards Insp Repts 50-454/99-03 & 50-455/99-03 on 990217-0329.Five Violations Identified & Treated as Ncvs. Expresses Continued Concern with Configuration Control & Human Performance Errors at Byron Station ML20206U3261999-03-29029 March 1999 Forwards RAI Re 981208 Response & Suppls to NRC Re Use of Overtime in Byron Station Operations Dept.Response Requested within 30 Days of Date of Ltr ML20196K8821999-03-26026 March 1999 Advises of Completion of Plant Performance Review on 990201 to Develop Integrated Understanding of Safety Performance. Overall Performance Acceptable.Plant Issues Matrix & Insp Plan Encl ML20205B4901999-03-26026 March 1999 Forwards SER Authorizing Util 981022 Relief Requests 12R-24, Rev 0,which Requests Deferral of Rv shell-to-flange Vessel Weld Exam to End of Second 10-year Insp Interval,Pursuant to 10CFR50.55a(a)(3)(ii) & 12R-34,rev 0 ML20204G3641999-03-19019 March 1999 Forwards Safety Evaluation & Technical Ltr Rept Re Second 10-yr Interval ISI Request for Relief 12R-11,rev 2.Licensee Proposed Alternative to code-required Pressure Test Authorized for Current Interval ML20204E2631999-03-18018 March 1999 Discusses Review of Ceco Evaluation of Chilling Effect on Byron Station Personnel.Identified Number of Questions Re Ceco Findings & C/As.Requests Further Evaluation of Chilling Effect at Byron Be Conducted & Response to Encl Questions ML20204D1971999-03-16016 March 1999 Discusses Review of Revision 4Q to Portions of Licensee Emergency Plan Site Annex ML20204B6721999-03-12012 March 1999 Forwards Copy of Preliminary Accident Sequence Precursor Analysis of Operational Condition Discovered at Plant on 980912 ML20207K1861999-03-11011 March 1999 Discusses Review of Rev 4P to Portions of Byron Power Station EP Site Annex.Based on Determinations That Changes Do Not Decrease Effectiveness of EP & Plan Continues to Meet Standards of 10CFR50.47(b),NRC Approval Not Required ML20207J5201999-03-10010 March 1999 Forwards Insp Repts 50-454/99-02 & 50-455/99-02 on 990105-0216.No Violations Noted.Expresses Concern Re Trend of Configuration Control & Human Performance Errors at Byron Station ML20203G7981999-02-11011 February 1999 Forwards Insp Repts 50-454/99-01 & 50-455/99-01 on 990119-22.No Violations Noted.Insp Involved Exam of Maint & Engineering Related Activities for Electrical Circuit Breakers ML20203F2541999-02-10010 February 1999 Informs That Beginning 990216,DE Hills Will Be Chief of Operations Branch Which Includes Operator Licensing Function ML20203C9861999-02-0808 February 1999 Ack Receipt of ,Which Transmitted Changes Identified as Rev 52 to Security Plan.No NRC Approval Required ML20202H9401999-02-0303 February 1999 Informs That Update of Set Number 58 of UFSAR Has Been Completed.Confirmation Sheet Providing Update Encl ML20199H8561999-01-19019 January 1999 Discusses Insp Repts 50-454/98-25 & 50-455/98-25 on 981124-990104 & Forwards Nov.Violation Identified Involving Unacceptable Preconditioning of Stroke Time Testing of AFW Pump Discharge Valves ML20199E8861999-01-15015 January 1999 Discusses Two Unresolved Security Items Identified in Sections S3.b1 & S3.b2 of Insp Repts 50-454/98-03 & 50-455/98-03,dtd 980211.One Item Re Adequacy of Alarm Sys Testing When Two Alarm Zones Were Returned to Svc ML20198N8261998-12-30030 December 1998 Forwards Insp Repts 50-454/98-24 & 50-455/98-24 on 981130- 1204.No Violations Noted.Purpose of Insp Was to Determine If Licensed Operator Requalification Training Activities Conducted IAW with NRC Requirements ML20198J0211998-12-18018 December 1998 Forwards Insp Repts 50-454/98-20 & 50-455/98-20 on 981006- 1123.No Violations Noted ML20198F4451998-12-17017 December 1998 Forwards Insp Repts 50-454/98-23 & 50-455/98-23 on 981116-14.No Violations Noted.Purpose of Insp Was to Verify Accuracy of Licensee Response to Region III Questions Re Grid Stability ML20206N4431998-12-10010 December 1998 Forwards Security Insp Repts 50-454/98-22 & 50-455/98-22 on 981116-20.No Violations noted.Challenge-testing of Some Detection Equipment Showed Some Vulnerabilities That Util Indicated Would Be Corrected 1999-09-08
[Table view] |
Text
,
U S. NUCLEAR REGULATO.7.Y COMMISSION %.c e sia stovast vurtais.
Forg gp gys,a~'
- f" ~.,s, -=
. ,,o r.
l i T RESPONSE TO FREED *M CF l ' * IXl "'
( ..... INFORMATION ACT (FOIA) REQUEST SEP 2 81988 l
Docaaikvw.t?$esa pas ei I
stoutstem ,
l ' PA l.-RECORDS RELEASED OR NOT LOCAftD (S ca.c.ed 60s.s)
N. .g.ncy ruo,d. .ob,. 4 to th. ,.go t Pe. b n locat.d.
N. - .e, ,.we. oawu t w o n iac.i.o-u ,u,.,. . is.o A,r n.. AS .,. ov ...w. e., mu.c .r u.on .,o co,,,n . e. NRc Pm oxo,e.n Ro
, X =A%f2 ecy,xo,. a,.oi.e..
V. *Amoc A acy J .X,.cio e.. i u .,. et,<.a a A n.. 6 * * ., . . ,nw. .uu. ..,,w.c in co .no e ., a NRc Poe.c ox-Roon,gmp3 w sni , oc. . em., on roia no,ne., .ao .1.,. -
t w oon.u,v. on.ee.voo u.i u voo.r o..a t... soa.co . ,o.,e ,.un.no.t n,mw. .uu.e., pow.e %
.ruf c.png .t th. NRC Pot c Doco,n.nt Room,1717 H $0 t. N W . Wuh.ngton, DC. . . fclo., ono., e. FoiA eom:w .ad ..ao i., n.m..
Encio d . enform. ton on ho. No m.y cot.e uc to end th. ca.,g fo, copeng ..:c,o. pec.? .i tP. NRC Pot c Docom.at Room.y?pf {pgg.2.ngion. DC
. ,.co,o. u,.n i. u ,wi e,. .ra o Anv .w.c.u. cu.e. t, cop e e. ,xo.a. pro ==s.o .a. c.mi ex.oo .r. ~id e. -t. .x*
Rxo,o. 4,.o i. e. ,m i . a. .,,w i. .~ e.,r.o.,,...ec,i n , - .e o.,xi, - i. voo in . e .c . ,.- io . . . ~ ,o, , u.on . e . u..e .a . e w., o.i.o -
PART H A-tNFoRM AflON WffHMELD FROM PUSUC DISCLOSURE r
c.,u - . e. .. ..o ,x o. . o., es.o e- ~e.c o ,%, ,. ,o, . i. e. roiA ...,-. o.x,e.o . .ao e, e. , oe. .ww e.n n.
..c..~DAe,,~ ,i.o,.ee.o= ~i.. - ~,xo. .e. u. ...uu.
ion. Dc. . . em., ono., e. eoi- A~a...e.mi.,n.
~t c . n n .a. conn .
- .ao ..a ju NRc em Doe-i Rocas. mr H sv i. N w . wus c-
$' GLg4 g m A. .br. M. cd M N k 9M Cocm a R e . Ph@%*
Ala a L h.
N ph
-% -+ o-g 4 oe c. h hN. M M h_ +M AAA asa.'.
M *. ~
.t i h x# A 9. 8 8 : # SA2 4%
b : , '. Io b A f A4. es : 3 9 cg , 2 3
) -
A# 11 17 )l. 13 i Mu ', 12 2 peep X ( 2 o - sc.40 1 Md 939. %
ggjoap 1 000920 fiUR PHY 80-34 5 PDR Sa tv.I 0. 4Cio. :s <., , ,ggago.gco.og
_w.
/
NIC FORM 464 eri
FCEEDOM OF INFORMATION ACT CESPONSE FOla NUMBERI$h FoI A - FF 4 W oAft:
PA2T O.0- APPUCAOLE FOIA ExtMPTIONS Records subject ;o the request thet are descrited in the enclosed Appendicos -4k are being ydthheld in tnoir entirety or in part under FOIA bomptions and for the reasono ast forth below pureuent to 5 U.S.C 562(b) and 10 CFR 9 $dal of NRC Regulations. .
- l. The wthheld informeten a proper *v ciaee#ed pursuant to Executrve Orde i 12354 tutMPTON 1)
- 2. The methhead bforwion reistes soiser to the btenal pesonnel rules and gEcedures of NRC. (DEMPTION 2)
- 3. The edihbeid informoson e specFcae r enormted from put4c decdoeure by statute irdcated; (DEMPTION 3*
Secten 14114 cf the Atorme trergy Act newA proh&ts the decicours of Reetncted Osta tor Fort er'y Reetncied Date 642 U S.C. 2161-21R g
5 Secten 147 of the Atorruc Energy Act newch proherts the doctoeure of Urdesated SafegurJe infmeten 142 U S C. 21th.
- 4. The wthMd information L e trade escret or commerdal or francial bformeten that is bemg wrthheld fa the reseMs) bdicated (DiMPTION 41 The informaten is coredered to te confusentel twness (propsletaryl informaton.
The informeten a cone sered to be propnetary informaten purwere to 10 CFR 2.790(dH1).
The eformaton mee outervtted and receeved e corAdence from a foreyn source purwaat to 10 CFR 2.MoidH2L
- l. The acne 6d mformaton corests of eterogency or etreagerwy records that are not ave 44tne through decovery dsnng Irtsaten. Declosu r e of predeceenal (formaten would tend to ehtwt the coen pad frare enchange of useas essental to the descerattw process Whee recorde are methbend m then entrety. the facts are inestncater meertained wth the prodoceenal eformaten. There a6eo are re reasoee%r segregelde fac%el potDons tecause the rosesse of the facts would permst an rdrect mouiry nWo the secoeceenal process of the egency. (UtMPflON b
- 6. The wthPaid efortreson e enerwted from pubc dedoeu e rtocause its dociosure would reewit ie a esearly unmenanted c*u.on of pomoral prwecy. ItXEMPTION 61
- 7. The wrthhe6d riformaton corsets of eseetgatory records corec4ed for iew enforcorrent purposes and e I:e=rg witrtend for te re ace (s) irdcated (DEMPTCN M 0=ctoeure ocuid etadore asih an en'orcerverst proceeding because a could revosi the scope drocten end faci.e of ordo cenwnt efforts. eruf thus coved pcessbry e40w thorn 10 tone scDon to th edd potent =e' neorydoery or 8 vicneticri of NRC requremeets from rwatgatore tutMPTCN MAH Ooctcoure would scretnute en uramenanted inswon of preonal pre,acy 1EJEMPTCN hC1)
TN mformaten ccroots of narren of rusrM,a4 was other mformaten the dociosure of newch wedd re sel usectices of conndseted sources. tutMPTCN hon
.4 PART H C-DENYDWO OFFfCIALS Pursuant to 10 CFR 9 9 erusier 9 il of ee U S. Nucteer Reguletory Corrresca regulathw. It has teen determred that the informeten w* Wends ' enemt from pra$ucten or decicours and that Ms proexten er decicense e coetrary to ew pupc eterest. The portors reececebe for the dennel are those otrcets uAt#ed teLww se denyeg orfice8s eruf the Dvector.
Dewieman of Ru4se end I'ecords. Once of Adrwnetreten,oe r any der'eis that may be appemed to tre Enocueve Drecsar for Opersters 400 OtNyiNo of FcAL titLtiof f act RECORDS OtNitD APPtLL.Att OFFICIAL
'# C3' C, i
PART H 0- APPEAL PtiOMTS The densel by each denying official identifed in Part II.C may be oppealed to tr e Appettate Offcial identifed in f%et esction. Any such appeal must be in weiteg and must be made nehet 30 days of receipt of this response. Appeels must be addretted as oppropriate to the tsecvths Deoctor for Operations or to the Secretary cf the Comtrussaon, U.S. Nuclear Rog,ulatory Comm4ss.on, Washegton, DC 2025, and should cleady state on the ens s4 ope end in the letter that R es an "Apoest bom en trutet f Of A Decesion.
mac posi.e weg t' U.S. NUCttAR REOULATORY COMMISSIC
- FOIA RESPONSE CONTINUATION
Re8 F0I A- 88-345 -
APPENDIX A RECORDS MAINTAINED AMONG PDR FILES NUMBER DATE DESCRIPTION
- 1. 06/24/82 Transmittal ltr w/ inspection Report No. 50-454/82-05, 50-455/82-04 and NOV ACCESSION NO. 8207220164 8207220164A 8207220164B
- 2. 05/27/83 Transmittal ltr w/ inspection Report No. 50-454/83-16 and NOV ACCESSION NO. 8306130341 8306130341A 8306130341B
- 3. 09/28/83 Transmittal ltr w/!nspection Report No. 50-454/83-37 ACCESSION NO. 8310140179 ,
8310140179A i
4 i
l l
l 1
1
Re: F0! A.88-345 B
APPEN0!X RECORDS MAINTAINED IN THE POR UNDER THE ABOVE REQUEST NUMBER _
DATE DESCRIPTION NUM8ER Request for
- 1. 08/24/82 Memo M. A. Stanish to W. J. Shewski re:
Interim Lead Auditor Certification - P. J. Macuiba w/ attachments
- a. Note re interim lead auditor
- b. Ceco QA Department Lead Auditor Qualification fonn
- c. . 08/17/81 ltr L. O. De1 George to 0. G. Eisenhut e Policy St: cement
- e. 07/20/83 memo M. A. Gorski/S. C. Hunsader to J., S. Bitel
- f. Attachment A 9
09/11/83 memo A. B. Davis to R. L. Spessard (9 NI
- 2. 09/11/83 Memo A. Bert Davis to R. L. Spessard w/ handwritten notes and Inspection Evaluation fona (2 pages)
- 3. 10/05/83 Ltr L. O. De1 George to J. G. Keppler w/ Preliminary Report on Reinspection Conducted as a Result of Noncompliance item (46 pages)
- 4. 02/84 Report on the Byron QC Inspector Reinspection Program (81pages) 6- 02/84 Appendixes to Report on the Byron QC Inspector Reinspection Program (13'ipages)
- 6. Memo R. L. Spessard to C. E. Norelius re: Inspection 33/09/84 Plan for Completing Byron Reinspection Program w/ Byron r l
Inspection Plan (3 pages) l l
Re: F01A ___88-345
, APPENDIX C RECORDS PARTIALLY WITHHELD i NUM8ER DATE DESCRIPTION & EXEMPTION J. 12/07/83 Memo D. W. Hayes to R. C. Knop re: Byron Reinspection Program (3 pages) 4 j Ex. 6 i
l i
J 4
i 0
1
.