Requests Meeting During Wk of 860825 to Discuss Proposed Changes to Startup Test Program,Per Meetings W/Ge.List of Power Startup Test Affected by Proposed Changes Encl
ML20205C043
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 08/08/1986
From: Agosti F
DETROIT EDISON CO.
To: Adensam E
Office of Nuclear Reactor Regulation
References
VP-86-0098, VP-86-98, NUDOCS 8608120235
Download: ML20205C043 (4)


Text

~

~

sket
:

Nuclear Operations 1

North Dixie He Ed.ison=="ghway Nuclear o-"-

August 8, 1986 VP-86-0098 Office of Nuclear Reactor Regulation Ms. Elinor G. Adensam, Director-Project Directorate No. 3 Division of BWR Licensing U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Ms. Adensam:

Reference:

Fermi 2 NRC Docket No. 50-341 NRC License No. NPP-43

Subject:

Meetino on Fermi 2's Startup Test Program We have informed Mr. David Lynch that we have made plans, as a result of meetings with General Electric, to pursue changes to our Startup Test Program as currently defined in Chapter 14 of our FSAR.

We understand that the NRC staff has been kept abreast of the program by General Electric since September, 1985 and recently through the review of similar activities at Hope Creek, Clinton, River Bend and Nine Mile 2 plants.

We plan to incorporate these changes to the Startup Test Program in accordance with License Condition 2.C(14) and 10CFR50.59 requirements as River Bend did.

However, we would like to set up an informational meeting with you, the Staff and Region III to give you some details of the proposed changes.

Attached is a listing of the Power Startup tests that would be affected by these proposed changes and a description as to the nature of the changes that would be made.

We believe you would provide us with prudent suggestions regarding our program.

It is our desire to meet with you prior to implementing these changes and issuing the specific 10CFR50.59 statements on each of these changes.

I have asked Mr. Robert Hoolley (313) 586-4211 to work with you to assure a timely meeting is arranged that coincides with your schedule and our Startup Test Program schedule.

(

8608120235 860808 PDR ADOCK 05000341 g

P PDR

tis. Elinor G. Adensam August 8, 1986 VP-86-0098 Page 2 It is our hope that a meeting during the week of August 25 could be arranged.

Sincerely,

'MC M

Attachment cc:

l-!. D.

Lynch H. J.

Richings U. G. Rogers G. C. Uright USNRC Document Control Desk Washington, D. C.

20555

STARTUP TEST (ST) PROGRAM

SUMMARY

ST*

Description **

Proposed Change 1(1)

Chemical and Radiochemical Delete No-Cleanup test at Test Condition (TC) -3 Obtain data during test at TC-6 13(11)

Process Computer Delete comparison of Process Computer /BUCLE at TC-3 and TC-6.

Detailed comparison and checkout will be performed during Dynamic System Test Case (ST-13) at i

TC-2.

j 18(16)

TIP Uncertainty Delete testing at TC-3 and TC-6.

21(19)

Core Power-Void flode Delete control rod movement testing.

Stability adequately tested during ST-22.

4 22(20)

Pressure Regulator Delete TC-4 testing and fail to backup at TC-5 test.

i 23A(21) Feedwater Response Delete TC-4 testing.

Adequate testing at TC-2, 3, 5 and 6.

4 24(22)

Turbine Valve Surveillance Delete testing at TC-3.

Surveillance test performed weekly and adequate testing performed at TC-5 and TC-6.

25B(23) Full Reactor Isolation Expand test window to 70-100%

power.

Take credit for inadvertent full reactor isolation in test window.

i 27(25)

Turbine Trip / Load Rejection Expand test window to 70-100%

power.

Take credit for inadvertent turbine trip in test window.

4 l

30A(28) Recirculation System Delete test at TC-3.

Test Single Pump Trip performed at TC-G.

30D(28) Recirculation System Perform'in conjunction with Runback ST-23C (Feedvater Pump Trip) or during inadvertent initiation.

1 i

t

a Page 2 71(33)

RHR System Delete shutdown cooling mode 2-heat exchanger test.

Infer capacity from suppression pool cooling test.

TC-4 Natural Circulation Delete remaining testing at j

TC-4.

I i

b i

4 I

i i

1 7

i 1

PARENT!! ESES INDICATE TEST NUMBERS AS IDENTIFIED IN FERf1I 2 FSAR TABLE 14.1-1 SEE FERf1I 2 FSAR CilAPTER 14 AND FSAR TABLE 14.1-1 AND FIG. 14.1-2 1